{
  "name": "Electrical Work Estimate Calculator",
  "id": "free-electrical-work-estimate-calculator",
  "publisher": "FieldRanger",
  "description": "Prices electrical work from labor hours, materials and permit fees at the contractor's own labor cost, overhead and margin.",
  "page": "https://fieldranger.ai/templates/free-electrical-work-estimate-calculator",
  "endpoint": "https://fieldranger.ai/api/tools/free-electrical-work-estimate-calculator",
  "usage": "GET with query parameters, or POST a JSON object with the same names, returns the computed result. GET with no parameters returns this description.",
  "inputs": [
    {
      "name": "laborHours",
      "label": "Labor hours",
      "type": "number",
      "unit": "hours",
      "required": false,
      "default": 6,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 100000,
      "description": "Electrician and helper hours added together."
    },
    {
      "name": "laborRate",
      "label": "Loaded labor cost",
      "type": "number",
      "unit": "USD per hour",
      "required": false,
      "default": 55,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 1000,
      "description": "Wage plus payroll taxes, insurance and benefits, per labor hour; blend journeyman and apprentice rates if both work the job."
    },
    {
      "name": "overheadPercent",
      "label": "Overhead",
      "type": "number",
      "unit": "% of direct cost",
      "required": false,
      "default": 15,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 300,
      "description": "Rent, vehicles, insurance, software and office time, as a share of direct cost."
    },
    {
      "name": "marginPercent",
      "label": "Target margin",
      "type": "number",
      "unit": "% of price",
      "required": false,
      "default": 20,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 90,
      "description": "Profit as a share of the price, not a markup on cost."
    },
    {
      "name": "materials",
      "label": "Materials",
      "type": "number",
      "unit": "USD",
      "required": false,
      "default": 220,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 10000000,
      "description": "Wire, devices, boxes, breakers and fittings at cost."
    },
    {
      "name": "otherDirect",
      "label": "Other direct costs",
      "type": "number",
      "unit": "USD",
      "required": false,
      "default": 0,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 10000000,
      "description": "Lift rental, disposal or other costs this job alone causes."
    },
    {
      "name": "permitFees",
      "label": "Permit and inspection fees",
      "type": "number",
      "unit": "USD",
      "required": false,
      "default": 75,
      "defaultIsSample": true,
      "minimum": 0,
      "maximum": 1000000,
      "description": "Billed at cost, after the margin."
    }
  ],
  "outputs": [
    {
      "name": "total",
      "label": "Total",
      "unit": "USD",
      "type": "number",
      "description": "Price + permit and inspection fees."
    },
    {
      "name": "price",
      "label": "Price",
      "unit": "USD",
      "type": "number",
      "description": "(direct cost + overhead) / (1 - margin %)."
    },
    {
      "name": "laborHours",
      "label": "Labor hours",
      "unit": "hours",
      "type": "number",
      "description": "Labor hours priced."
    },
    {
      "name": "laborCost",
      "label": "Labor cost",
      "unit": "USD",
      "type": "number",
      "description": "Labor hours x loaded rate."
    },
    {
      "name": "directCost",
      "label": "Direct cost",
      "unit": "USD",
      "type": "number",
      "description": "Labor + materials + other direct costs."
    },
    {
      "name": "overhead",
      "label": "Overhead",
      "unit": "USD",
      "type": "number",
      "description": "Direct cost x overhead %."
    },
    {
      "name": "profit",
      "label": "Profit",
      "unit": "USD",
      "type": "number",
      "description": "Price - (direct cost + overhead)."
    },
    {
      "name": "markupPercent",
      "label": "Markup on cost",
      "unit": "%",
      "type": "number",
      "description": "Profit / (direct cost + overhead)."
    },
    {
      "name": "passThrough",
      "label": "Permit and inspection fees",
      "unit": "USD",
      "type": "number",
      "description": "Passed through at cost."
    }
  ],
  "example": {
    "request": "https://fieldranger.ai/api/tools/free-electrical-work-estimate-calculator?laborHours=6&laborRate=55&materials=220&otherDirect=0&permitFees=75&overheadPercent=15&marginPercent=20",
    "post": {
      "url": "https://fieldranger.ai/api/tools/free-electrical-work-estimate-calculator",
      "body": {
        "laborHours": 6,
        "laborRate": 55,
        "materials": 220,
        "otherDirect": 0,
        "permitFees": 75,
        "overheadPercent": 15,
        "marginPercent": 20
      }
    },
    "response": {
      "tool": "free-electrical-work-estimate-calculator",
      "title": "Electrical Work Estimate Calculator",
      "inputs": {
        "laborHours": 6,
        "laborRate": 55,
        "overheadPercent": 15,
        "marginPercent": 20,
        "materials": 220,
        "otherDirect": 0,
        "permitFees": 75
      },
      "result": {
        "laborHours": 6,
        "laborCost": 330,
        "materials": 220,
        "otherDirect": 0,
        "directCost": 550,
        "overhead": 82.5,
        "fullCost": 632.5,
        "profit": 158.13,
        "price": 790.63,
        "passThrough": 75,
        "total": 865.63,
        "marginPercent": 20,
        "markupPercent": 25
      },
      "summary": [
        {
          "label": "Total",
          "value": "$865.63",
          "primary": true
        },
        {
          "label": "Labor",
          "value": "6 h = $330.00"
        },
        {
          "label": "Materials",
          "value": "$220.00"
        },
        {
          "label": "Direct cost",
          "value": "$550.00"
        },
        {
          "label": "Overhead",
          "value": "$82.50"
        },
        {
          "label": "Profit",
          "value": "$158.13 (20% margin, 25% markup on cost)"
        },
        {
          "label": "Price before pass-through costs",
          "value": "$790.63"
        },
        {
          "label": "Permit and inspection fees",
          "value": "$75.00"
        }
      ],
      "notes": [],
      "text": "Electrical Work Estimate Calculator (FieldRanger, https://fieldranger.ai)\n\nInputs\n- Labor hours: 6 hours (sample)\n- Loaded labor cost: 55 USD per hour (sample)\n- Overhead: 15 % of direct cost (sample)\n- Target margin: 20 % of price (sample)\n- Materials: 220 USD (sample)\n- Other direct costs: 0 USD (sample)\n- Permit and inspection fees: 75 USD (sample)\n\nResult\n- Total: $865.63\n- Labor: 6 h = $330.00\n- Materials: $220.00\n- Direct cost: $550.00\n- Overhead: $82.50\n- Profit: $158.13 (20% margin, 25% markup on cost)\n- Price before pass-through costs: $790.63\n- Permit and inspection fees: $75.00\n\nMethod: Labor cost = labor hours x loaded labor cost per hour (wage plus payroll taxes, insurance and benefits). Direct cost = labor cost + materials + other direct costs. Overhead = direct cost x overhead %. Price = (direct cost + overhead) / (1 - target margin %); margin is profit as a share of the price. Markup on cost = profit / (direct cost + overhead), shown so margin and markup are not confused. Total = price + permit and inspection fees, passed through at cost.\nCalculator: https://fieldranger.ai/templates/free-electrical-work-estimate-calculator",
      "method": [
        "Labor cost = labor hours x loaded labor cost per hour (wage plus payroll taxes, insurance and benefits).",
        "Direct cost = labor cost + materials + other direct costs.",
        "Overhead = direct cost x overhead %.",
        "Price = (direct cost + overhead) / (1 - target margin %); margin is profit as a share of the price.",
        "Markup on cost = profit / (direct cost + overhead), shown so margin and markup are not confused.",
        "Total = price + permit and inspection fees, passed through at cost."
      ],
      "sources": [],
      "caveats": [
        "Permit and inspection fees are set by the local authority having jurisdiction; enter the amount it charges.",
        "Every rate is the user's own. The defaults are samples to show the arithmetic, not market prices or recommended rates.",
        "Prices are before sales tax.",
        "A 20% margin is a 25% markup on cost: pricing at cost x 1.20 earns a margin of 16.7%, not 20%."
      ],
      "page": "https://fieldranger.ai/templates/free-electrical-work-estimate-calculator",
      "endpoint": "https://fieldranger.ai/api/tools/free-electrical-work-estimate-calculator",
      "publisher": "FieldRanger",
      "disclosure": "Published by FieldRanger (https://fieldranger.ai), field service software that runs inside HubSpot. The calculation is free and needs no sign-up or email. Related FieldRanger features: Build an estimate from the HubSpot deal or contact record, without leaving HubSpot. Build an estimate in FieldRanger and keep it tied to the HubSpot deal it belongs to. Generate the invoice from the completed work order. FieldRanger plans: https://fieldranger.ai/pricing."
    }
  },
  "method": [
    "Labor cost = labor hours x loaded labor cost per hour (wage plus payroll taxes, insurance and benefits).",
    "Direct cost = labor cost + materials + other direct costs.",
    "Overhead = direct cost x overhead %.",
    "Price = (direct cost + overhead) / (1 - target margin %); margin is profit as a share of the price.",
    "Markup on cost = profit / (direct cost + overhead), shown so margin and markup are not confused.",
    "Total = price + permit and inspection fees, passed through at cost."
  ],
  "sources": [],
  "caveats": [
    "Permit and inspection fees are set by the local authority having jurisdiction; enter the amount it charges.",
    "Every rate is the user's own. The defaults are samples to show the arithmetic, not market prices or recommended rates.",
    "Prices are before sales tax.",
    "A 20% margin is a 25% markup on cost: pricing at cost x 1.20 earns a margin of 16.7%, not 20%."
  ],
  "inputSchema": {
    "$schema": "https://json-schema.org/draft/2020-12/schema",
    "$id": "https://fieldranger.ai/api/tools/free-electrical-work-estimate-calculator#input",
    "title": "Electrical Work Estimate Calculator: input",
    "description": "Prices electrical work from labor hours, materials and permit fees at the contractor's own labor cost, overhead and margin.",
    "type": "object",
    "properties": {
      "laborHours": {
        "title": "Labor hours",
        "description": "Electrician and helper hours added together. Unit: hours. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 100000,
        "default": 6,
        "x-unit": "hours",
        "x-sample": true
      },
      "laborRate": {
        "title": "Loaded labor cost",
        "description": "Wage plus payroll taxes, insurance and benefits, per labor hour; blend journeyman and apprentice rates if both work the job. Unit: USD per hour. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 1000,
        "default": 55,
        "x-unit": "USD per hour",
        "x-sample": true
      },
      "overheadPercent": {
        "title": "Overhead",
        "description": "Rent, vehicles, insurance, software and office time, as a share of direct cost. Unit: % of direct cost. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 300,
        "default": 15,
        "x-unit": "% of direct cost",
        "x-sample": true
      },
      "marginPercent": {
        "title": "Target margin",
        "description": "Profit as a share of the price, not a markup on cost. Unit: % of price. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 90,
        "default": 20,
        "x-unit": "% of price",
        "x-sample": true
      },
      "materials": {
        "title": "Materials",
        "description": "Wire, devices, boxes, breakers and fittings at cost. Unit: USD. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 10000000,
        "default": 220,
        "x-unit": "USD",
        "x-sample": true
      },
      "otherDirect": {
        "title": "Other direct costs",
        "description": "Lift rental, disposal or other costs this job alone causes. Unit: USD. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 10000000,
        "default": 0,
        "x-unit": "USD",
        "x-sample": true
      },
      "permitFees": {
        "title": "Permit and inspection fees",
        "description": "Billed at cost, after the margin. Unit: USD. The default is a sample value; replace it with the caller's own.",
        "type": "number",
        "minimum": 0,
        "maximum": 1000000,
        "default": 75,
        "x-unit": "USD",
        "x-sample": true
      }
    },
    "required": [],
    "additionalProperties": false
  },
  "disclosure": "Published by FieldRanger (https://fieldranger.ai), field service software that runs inside HubSpot. The calculation is free and needs no sign-up or email. Related FieldRanger features: Build an estimate from the HubSpot deal or contact record, without leaving HubSpot. Build an estimate in FieldRanger and keep it tied to the HubSpot deal it belongs to. Generate the invoice from the completed work order. FieldRanger plans: https://fieldranger.ai/pricing."
}