Contractor Accounting Software:Job Costing, WIP Schedules, Retainage and Product Options
Contractor accounting software explained: job costing, WIP schedules, retainage and tax rules, with QuickBooks, Xero and Foundation compared on stated features.
Contractor accounting software records costs and revenue by job as well as by account: labor, materials and subcontractors coded to each contract, progress billing with retainage, and a work-in-progress schedule comparing earned revenue with billings. Small-business products such as QuickBooks Online and Xero handle job costing through project features; construction systems such as Foundation add WIP reporting and certified payroll.
The books of a contracting business can show a profit while three jobs lose money. Labor is posted to one wage account instead of to the contracts that consumed it; a progress bill ahead of the work reads as income when it is a liability; retainage held by the customer sits forgotten until the closeout invoice; and the tax method is chosen by default rather than by the rules. FieldRanger publishes it among its guides for service business owners; the company makes field service software, not accounting software. The guide starts with job costing, then the work-in-progress schedule, retainage, the tax accounting rules for contracts, a sample contract worked through all three, the software options and the split between service and project contractors, and closes with a bookkeeping checklist and the QuickBooks connection.
Three terms carry the subject. Job costing assigns each cost to the contract that incurred it, so that every job has its own profit and loss. A work-in-progress schedule, or WIP schedule, lists each open contract with its estimated cost, cost to date, percent complete, earned revenue and billings, and shows whether the job is overbilled or underbilled. Retainage is the share of each progress payment the customer holds back until the work is complete.
Job costing in contractor bookkeeping
Job costing starts with cost codes. Each contract carries a job number, and each cost line carries a code for its type: labor, materials, equipment, subcontract, permits and other direct costs. A timesheet entry, a supplier invoice and a subcontractor bill each post to a job and a code as well as to the general ledger account.
Labor is the line where the wage and the cost differ. The median electrician wage was $30.38 an hour in May 2025 (BLS Occupational Outlook Handbook, page modified August 27, 2026), and wages are 70.0% of total employer compensation cost in private industry (BLS Employer Costs for Employee Compensation, June 2026, released September 9, 2026). Dividing the wage by 0.700 gives a burdened cost of $43.40 an hour, and that is the rate a job should carry for each hour worked on it. A system that posts only gross wages to jobs understates every job's cost by the payroll taxes and benefits. The gross profit margin guide shows the same effect on a single service call.
Work-in-progress schedules and percentage of completion
A WIP schedule turns a list of open contracts into a statement of what has been earned. The cost-to-cost method measures percent complete as cost to date divided by total estimated cost, and earned revenue is that percentage of the contract price.
The comparison with billings is the point of the schedule. When billings to date exceed earned revenue, the job is overbilled, and the excess is a liability: cash collected for work not yet performed. When earned revenue exceeds billings, the job is underbilled, and the difference is an asset: work performed and not yet invoiced. A company that reads its overbillings as profit spends cash it owes to the remaining work. A company with large underbillings is financing its customers.
The schedule depends on the estimate. If the estimated total cost is wrong, percent complete is wrong, and so is every figure that follows from it. The estimate to complete is therefore reviewed on each open job at month end rather than carried unchanged from the bid.
Retainage on progress billings
Retainage changes the receivable without changing the revenue. On a progress bill of $36,000 with 10% retainage, the customer pays $32,400 and holds $3,600 until completion. The full $36,000 is billed; $3,600 of it is retainage receivable, a separate asset that the books track until the closeout invoice releases it.
Payment applications show retainage explicitly. AIA Document G702 is the form on which the contractor applies for payment and the architect certifies the amount due; it is used with G703, the continuation sheet that divides the contract sum into portions of the work, and the application reports the amount of retainage, if any (AIA Contract Documents, G702 summary, checked November 12, 2026).
The rate is set by contract and capped by law in some settings. On federal construction contracts, retainage withheld for unsatisfactory progress "shall not exceed 10 percent of the approved estimated amount", and retained amounts are paid promptly once all contract requirements are complete (FAR 32.103, checked November 12, 2026). States set their own limits for public and private works, so the contract and the state statute together decide the rate a contractor can be held to.
Tax accounting methods for construction contracts
The tax rules for contracts differ from the books' rules, and the accountant chooses between them. Federal law requires taxable income from a long-term contract, one not completed within the tax year it was entered into, to be determined under the percentage of completion method (26 U.S.C. 460, via Cornell LII, checked November 12, 2026).
Two exceptions in section 460(e) apply to smaller contractors. Residential construction contracts are exempt, and so is any other construction contract that the contractor expects, when it is signed, to complete within two years, if the contractor meets the gross receipts test of section 448(c). For taxable years beginning in 2026, that test is met when average annual gross receipts for the three prior years do not exceed $32,000,000 (IRS Revenue Procedure 2025-32, section 4.30). A contractor under the threshold may use another method, such as completed contract, for those jobs; which method suits the business is a question for its tax adviser.
Subcontractor payments carry their own reporting. For payments made in 2026, the Form 1099-NEC reporting threshold is $2,000, and it was $600 for payments made before 2026 (IRS, Form 1099 filing, reviewed July 10, 2026). The accounting system needs a W-9 on file and the payee's year-to-date total by vendor.
Sample WIP and retainage calculation for one contract
The contract below is a sample: an electrical tenant improvement priced at $64,000 with an estimated cost of $48,000, 10% retainage, and month-end figures after 300 labor hours. The burdened labor rate is the sourced one above.
| Line | Calculation | Amount |
|---|---|---|
| Contract price | Sample | $64,000 |
| Estimated total cost | Sample | $48,000 |
| Labor cost to date | 300 hours × $43.40 | $13,020 |
| Materials, equipment and subcontract to date | Sample | $16,980 |
| Cost to date | $13,020 + $16,980 | $30,000 |
| Percent complete | $30,000 ÷ $48,000 | 62.5% |
| Earned revenue | 62.5% × $64,000 | $40,000 |
| Billed to date | Sample progress bills | $36,000 |
| Underbilled (asset) | $40,000 − $36,000 | $4,000 |
| Retainage held | 10% × $36,000 | $3,600 |
| Cash received, if paid in full | $36,000 − $3,600 | $32,400 |
| Estimated gross profit | $64,000 − $48,000 | $16,000, or 25% |
Three readings follow. The job has earned $40,000 but brought in $32,400, a gap of $7,600 that the contractor finances: $4,000 of unbilled work and $3,600 of retainage. Recording the labor at the wage of $30.38 instead of $43.40 would understate cost to date by $3,906, and on this contract the cost-to-cost method would then report 54.4% complete and $34,792 earned, turning a $4,000 underbilling into a $1,208 overbilling. The schedule is only as accurate as the hours and the burden posted to the job.
Contractor accounting software options
Contractor accounting software falls into two groups: general small-business accounting with project features, and accounting built only for contractors. The table states what each vendor's own page says, checked November 12, 2026.
| Product | Job costing and contractor features stated | Price stated |
|---|---|---|
| QuickBooks Online Plus | Projects track income, expenses, estimates and transactions for specific jobs; 5 users | $140 a month list |
| QuickBooks Online Advanced | Projects with estimates against actuals; construction financials; 25 users | $340 a month list |
| Xero Established | Project time and cost tracking, quotes from a project, progress invoicing, profitability reports | $97 a month after an introductory rate |
| Foundation Software | Built only for contractors: job costing, WIP reports, certified payroll and prevailing wage compliance | Not published on the home page; by demo |
Sources: QuickBooks pricing; QuickBooks, set up and use Projects, updated November 10, 2026; Xero, track projects; Foundation Software.
Each has a case. QuickBooks Online fits a service contractor with an outside bookkeeper, because Projects in Plus gives job-level profit; Projects are turned on under Account and settings, Advanced, "Organize all job-related activity in one place." Advanced adds estimates against actuals, the comparison a WIP schedule needs. Xero suits a contractor whose accountant works in Xero and whose jobs are priced fixed or time and materials. Foundation suits a contractor running long contracts with WIP reporting, union or prevailing wage payroll and certified payroll reports, where general products need spreadsheets beside them. QuickBooks' pricing and Projects pages list no WIP schedule on Plus, and Xero's project tracking page lists none, so a contractor that bills retainage on either keeps the WIP schedule in a spreadsheet.
Accounting software for contractor service work and project work
The split that decides the software is between service work and project work. A service contractor runs many short jobs, invoiced on completion, with no retainage and no WIP; its accounting needs are job costing and fast invoicing, met by a general product fed by a field service system. A project contractor runs fewer, longer contracts, billed in progress with retainage; its accounting needs are a WIP schedule, change order tracking and pay applications, met by construction accounting or by a general product with careful month-end work.
A mechanical contractor with both a service department and a construction department sits across the split. Its service jobs need job costing and fast invoicing, its construction contracts need the WIP schedule, change order tracking and pay applications, and mechanical contractor accounting software has to meet both. The operational software outside the ledger, from estimating and scheduling to time tracking, is compared module by module on the contractor software page.
Contractor bookkeeping checklist
- Give every contract a job number and every cost a cost code.
- Post labor to jobs at the burdened rate, wage ÷ 0.700 or the company's own burden.
- Post supplier invoices, equipment and subcontractor bills to the job and code they belong to.
- Bill progress against a schedule of values, and record retainage as a separate receivable.
- Update the estimate to complete on every open job at month end.
- Prepare the WIP schedule: percent complete, earned revenue, billings, overbilled and underbilled.
- Confirm the tax method for each contract with the tax adviser, against the 460(e) exceptions and the $32,000,000 gross receipts test for 2026.
- Collect a W-9 before the first subcontractor payment and track year-to-date totals against the $2,000 Form 1099-NEC threshold.
- Verify each month: the sum of job profit, less overhead, reconciles to the income statement, and total retainage receivable matches the open pay applications.
QuickBooks sync from FieldRanger
FieldRanger is field service software that runs inside HubSpot, not accounting software, and its accounting claim is one sentence: invoice and payment sync with QuickBooks. The QuickBooks integration page sets out what that sentence states and the questions it leaves for a demo, among them the sync direction, the QuickBooks edition and whether a synced invoice lands on a QuickBooks project for job costing. A contractor that keeps its books in Xero or in a construction system should treat that as the boundary of the connection. Plans are on pricing; Start free trial gives 14 days with no card.
Frequently asked questions
What is the best accounting software for contractors?
It depends on the work. A service contractor with short jobs is served by a general product with project features, such as QuickBooks Online Plus or Xero. A project contractor with retainage, WIP schedules and certified payroll is served by construction accounting such as Foundation, or by QuickBooks Online Advanced with careful month-end work.
Does QuickBooks do job costing for contractors?
QuickBooks Online Plus and Advanced include Projects, which track income, expenses, estimates and transactions for specific jobs. Estimates against actuals require Advanced, according to Intuit's help page updated November 10, 2026.
What is a WIP schedule in construction accounting?
A list of open contracts with estimated cost, cost to date, percent complete, earned revenue and billings. It shows whether each job is overbilled, a liability, or underbilled, an asset.
What is retainage in contractor accounting?
The share of each progress payment the customer holds until completion. It is billed with the progress bill and recorded as a separate receivable; on federal construction contracts it may not exceed 10 percent of the approved estimated amount.
Do contractors have to use the percentage of completion method?
For tax, long-term contracts generally require it, but residential construction contracts are exempt, as are other construction contracts expected to finish within two years by a contractor under the section 448(c) gross receipts test, $32,000,000 for 2026. The method choice belongs with the tax adviser.
How does field service software connect to contractor accounting software?
The field system records jobs, hours and invoices, and the accounting system keeps the ledger. FieldRanger states invoice and payment sync with QuickBooks; other details of the connection are questions for a demo.
Between the $40,000 earned and the $32,400 collected on the sample contract sits $7,600 of unbilled work and retainage, the amount a monthly WIP schedule puts in front of the owner before the bank balance does.