Guide
Landscape Business Plan:SBA Sections for a Design-Build and Maintenance Company, Oregon LCB Licenses and Bond, Labor and Equipment Inputs and a Sample First-Year Budget
Landscape business plan for design-build and maintenance work: SBA sections, Oregon LCB licenses and bond, BLS wages, broker premiums and a first-year budget.
A landscape business plan sets out the services sold, the market, the licenses and insurance the work requires, the crew and equipment, and a first-year budget that shows whether revenue covers cost. For a company that both installs landscapes and maintains them, the plan carries two revenue lines with different timing, and the budget has to show each one.
The plan fails in one predictable place. Installation work is priced and planned like maintenance, so a machine bought for hardscape projects, or a license bond missed at filing, lands in a budget that was built for mowing routes. Filed with the starting a business guides, this guide pairs with the landscaping software page for companies that run crews on HubSpot. The order is: plan sections in the SBA format, the two revenue lines, Oregon's licenses and fees, and the bond and insurance inputs; then labor, equipment and a priced first year; and last, cash timing, a checklist and the FieldRanger record.
The plan turns on four terms. Design-build work is a landscape installation that the company designs and builds under one contract, such as a patio, planting plan or irrigation system. Maintenance work is recurring service on an existing landscape. A landscape construction professional, or LCP, is the individual license Oregon issues to the person who supervises landscape work. A landscape contracting business license is the separate license Oregon issues to the company that contracts with the customer.
Landscape business plan sections mapped to the SBA format
SBA guidance names eight parts of a traditional plan (SBA, write your business plan, read November 13, 2026). They run from executive summary and company description through market analysis, organization and management, service or product line, and marketing and sales, to funding request and financial projections. It describes a lean startup plan as one that is "high-level focus, fast to write, and contains key elements only".
| SBA section | Content for a landscape company | Figures drawn from |
|---|---|---|
| Executive summary | The two service lines, the licensed person and the first-year result | The budget below |
| Company description | Entity, licenses held, service area | State business registry and licensing board |
| Market analysis | Homes and commercial sites in the service area, competing firms | Local permit and census data |
| Organization and management | The LCP, crew roles, who estimates and who supervises | The licensing board's supervision rules |
| Service or product line | Installation services and maintenance programs, priced separately | The company's price list |
| Marketing and sales | Lead sources, estimate process, signed-contract rate | Lead records |
| Funding request | Equipment, bond and working capital needed before revenue arrives | The budget and cash timing |
| Financial projections | Revenue by line, labor, materials, insurance, equipment, vehicle | Published wages, premiums and prices |
The order is the SBA's. The weight is not: in a design-build plan the organization section carries the licensing requirement, because the business license depends on a licensed individual. The lawn care version of the same plan, with a quarterly projection for a mowing company, sits in the guide to a lawn care business plan.
Revenue lines: design-build projects and maintenance contracts
The two lines earn money on different clocks. Maintenance revenue arrives visit by visit across the season, from accounts that renew, and its cost is mostly labor and fuel. Design-build revenue arrives project by project, each one estimated, signed and built, and its cost carries materials bought before the customer pays the balance.
The plan therefore projects them separately. Maintenance is stated as accounts, visits per account and price per visit. Design-build is stated as projects, average contract value and materials share. The landscaping estimate template holds the line items that turn one project into those three figures, and a year of signed estimates is the record a second-year plan is built from.
Oregon landscape contracting licenses and fees
Oregon requires two licenses for landscape work. The Landscape Contractors Board names them: "the individual landscape construction professional license and the landscape contracting business license" (Oregon LCB, basic steps to becoming licensed, rev. 7/2025, read November 12, 2026). The LCP license is obtained after an exam. The business license goes to the entity that "carries the bond, liability insurance, workers compensation (if applicable) and enters into the contract with the consumer". That business must be owned by, or employ, a licensed LCP.
| Item | Fee | Source |
|---|---|---|
| LCP application fee | $200 | [LCB steps to licensing](https://www.oregon.gov/lcb/Documents/StepstoBecomeLicensed.pdf) |
| LCP license fee, after the exam | $200 | Same |
| Business application fee | $285 | [LCB business application](https://www.oregon.gov/lcb/Documents/ApplicationBusiness.pdf) |
| Business license fee | $375 | Same; $660 in total with the application fee |
| Domestic LLC articles of organization | $100 | [Oregon Secretary of State fee schedule](https://sos.oregon.gov/business/Documents/business-registry-forms/br-fee-schedule.pdf) |
| LLC annual renewal | $100 | Same |
The exam is scheduled through PSI after the application is approved. Its fee is not stated in the LCB documents read for this guide. The Secretary of State's fee schedule carries a date of 07/13, so the LLC fee is confirmed on the filing screen before payment. The LCB also sets a supervision duty (LCB business application). An unlicensed employee must have had instruction on the project from the LCP, know the LCP by name, and be able to reach the LCP within an hour. An owner who is not the LCP builds that hire into the organization section and the labor budget.
Bond and insurance inputs from the LCB and a broker
The LCB sets the minimums. "Beginning January 1, 2026," all landscape contracting businesses must carry a $20,000 bond, and probationary license holders a $15,000 bond (Oregon LCB, insurance, bond and coverage requirements, read November 12, 2026). The certificate of liability insurance carries a minimum of $500,000, with the LCB listed as certificate holder. Workers' compensation is required once the business has employees, and the business name on the bond and insurance must match the licensed business name.
The premiums come from a broker. Insureon publishes the medians its landscaping customers pay (Insureon, cost of landscaping business insurance, updated October 12, 2026, read November 12, 2026):
- General liability: $761 a year, for $1 million per occurrence and $2 million aggregate.
- Commercial auto: $3,590 a year.
- Workers' compensation: $1,802 a year.
- Tools and equipment (inland marine): $637 a year.
- License and permit bonds: $112 a year.
Two limits apply to those figures. Insureon's figures are medians from its own customers, not Oregon rates, and the page states that the bulk of them have fewer than five employees. An Oregon quote for the same coverage can differ. The bond figure covers license and permit bonds in general and does not state a bond amount, so the premium for a $20,000 LCB bond comes from the surety's quote.
Labor cost inputs: BLS wages and employer payroll taxes
The Bureau of Labor Statistics publishes the wage. The median hourly wage for landscaping and groundskeeping workers was $18.82 in May 2025, and for grounds maintenance workers as a whole $19.27 (BLS, grounds maintenance workers, read November 12, 2026). The figures are national; the sample uses the landscaping median as its input and labels it as national.
The employer's payroll tax sits on top. The IRS states that the Social Security rate "is 6.2% for the employer and 6.2% for the employee" (IRS, Topic 751, updated November 9, 2026, read November 13, 2026). The Medicare rate is "1.45% for the employer and 1.45% for the employee", and the 2026 Social Security wage base is $184,500. The employer's share is therefore 7.65% of each wage dollar below the base, before unemployment taxes and workers' compensation.
Equipment budget: purchased, contributed and deferred machines
A design-build plan names its machines in three groups: bought in year one, brought into the business by the owner, and deferred. The deferred group is where the plan shows its judgment, because the compact loader is the largest single purchase in the sample budget below.
Two published prices set the scale. Toro lists the Dingo TX 1000 TURBO track loader, a compact utility loader with a rated operating capacity of 1,000 pounds, at $43,840.00 (Toro, Dingo TX 1000 TURBO, read November 13, 2026). STIHL lists the BR 800 X MAGNUM backpack blower at $649.99 (STIHL, BR 800, read November 13, 2026). Toro's mower product pages read for this guide showed no price in their page text. The sample therefore treats the mower, trailer and truck as equipment the owner contributes, at no stated value, and leaves their price to a dealer quote.
The vehicle's running cost needs a basis too. The IRS business standard mileage rate for 2026 is 72.5 cents a mile for January through June, and 76 cents for July through December (IRS, standard mileage rates, updated July 28, 2026). The rate is a deduction figure, not a measured cost, and the sample uses it as a stand-in for fuel, maintenance and depreciation on the contributed truck.
Sample first-year budget for an Oregon design-build and maintenance company
The sample budgets the first year of a hypothetical Oregon LLC whose owner holds the LCP license and employs two crew members. Accounts, visits, prices, project counts, project values, materials share, hours and miles are sample inputs, labelled as such. Fees, premiums, wages, tax rates and equipment prices are the published figures cited above, read on November 12 and 13, 2026.
| Line | Figure | Basis |
|---|---|---|
| Maintenance revenue | $58,800 | Sample input: 28 accounts × 30 visits × $70 |
| Design-build revenue | $112,000 | Sample input: 8 projects × $14,000 |
| Total revenue | $170,800 | $58,800 + $112,000 |
| Materials for design-build projects | $44,800 | Sample input: 40% of design-build revenue |
| Crew wages | $60,224.00 | 2 × 1,600 hours (sample input) × $18.82 (BLS national median) |
| Employer Social Security and Medicare | $4,607.14 | 7.65% of wages (IRS) |
| Workers' compensation | $1,802 | Insureon landscaping median |
| General liability, commercial auto, tools and equipment, bond | $5,100 | $761 + $3,590 + $637 + $112 (Insureon) |
| Licenses and LLC filing | $1,160 | $400 LCP + $660 business + $100 LLC (LCB, Secretary of State) |
| Two backpack blowers | $1,299.98 | 2 × $649.99 (STIHL) |
| Vehicle operating cost | $10,395 | Sample input: 7,000 miles at 72.5 cents + 7,000 at 76 cents (IRS rates) |
| Total listed costs | $129,388.12 | Sum of the cost lines |
| Remainder before owner pay and unlisted overhead | $41,411.88 | $170,800 − $129,388.12 |
| Remainder if the Dingo is bought in year one | −$2,428.12 | $41,411.88 − $43,840 (Toro list price) |
The remainder is not profit. It has to cover the owner's own pay and taxes, and the lines the sample leaves out: marketing, phone and software, accounting, disposal fees and the PSI exam. The last row carries the plan's main decision. Bought outright in year one, the loader takes more than the whole remainder. The funding request therefore finances it, rents a machine per project at a rental yard's quoted rate, or moves the purchase to year two once eight projects have shown the demand. Each design-build project in the sample leaves $8,400 after materials, so the loader's price equals the materials-adjusted margin of a little over five projects.
Cash timing for installation projects and maintenance routes
The budget is annual, and the bank balance is not. Materials for an installation are bought before the customer pays the balance, so the cash low point falls in the weeks when several projects are under way at once. Maintenance revenue is spread across the season, and in the sample it carries the payroll while project payments are outstanding.
The plan's funding request is sized against that low point, not against the annual total. It lists the bond, the license fees and the first payroll as costs that come before any revenue, and shows the materials for the first two projects as working capital. A reviewer reading the plan, whether a lender or a landscape business consultant, checks that request against the payment terms written into the company's contracts.
The second-year plan can read its project backlog from HubSpot. Each deal stage carries a win probability, and the deal property Weighted amount is "the Amount multiplied by the Deal probability" (HubSpot Knowledge Base, default deal properties, updated September 29, 2026). A custom pipeline for installation projects, kept apart from maintenance renewals, requires a Starter, Professional or Enterprise subscription (HubSpot Knowledge Base, object pipelines, updated September 29, 2026). The forecast tool, on Sales Hub or Service Hub Professional and Enterprise, uses Weighted amount by default (HubSpot Knowledge Base, forecast tool, updated September 9, 2026). The sum of weighted amounts in the installation pipeline is the design-build revenue line the plan can defend.
Landscape business plan checklist
- Follow the SBA's traditional layout, and name the licensed LCP in the organization and management section.
- Project maintenance and design-build revenue separately: accounts, visits and price; projects, value and materials share.
- Price both Oregon licenses and the LLC filing, and confirm each fee on the filing screen before payment.
- Obtain a surety quote for the $20,000 LCB bond, and a liability quote of at least $500,000 naming the LCB as certificate holder.
- Add workers' compensation from the first employee's start date.
- Cost labor at a published wage plus the employer's 7.65% payroll tax.
- Sort equipment into bought, contributed and deferred, with a published price or a dealer quote for each.
- Size the funding request to the cash low point, including the bond, licenses, first payroll and first projects' materials.
- Budget the marketing that brings the first estimates, from landscape business cards to the first service area mailings.
- Verify the plan: recompute every row of the budget from its inputs, and check that each published figure still matches its source page on the day the plan is submitted.
Project and maintenance records in FieldRanger
FieldRanger keeps both revenue lines on the HubSpot records the sales process created, which is where a second-year plan finds its figures. An installation estimate can be built from the HubSpot deal or contact record, or in FieldRanger and kept tied to the deal, and sent for signature through PandaDoc. A won deal becomes a job with its context carried over. Recurring job templates hold the maintenance contracts, and FieldRanger builds each technician's route for the day automatically.
On site, digital work orders put the job details and instructions on the assigned technician's phone, custom checklists hold the installation steps, and before and after photos attach to the work order. Multi-day jobs are not built, so a three-day patio installation is scheduled as three jobs, one per day. Progress billing and retainage are not built either: the invoice is generated from the completed work order, and payments sync with QuickBooks. Revenue reports show job revenue and margin by customer or service type, so the maintenance and design-build lines of the plan can be compared with what the year produced. The landscaping software page covers the setup, and plans are listed on pricing, where Start free trial runs 14 days with no card.
Frequently asked questions
What goes in a landscape business plan?
The eight parts the SBA sets for a traditional plan, from the executive summary to the financial projections. A landscape plan adds the licensed person, the bond and insurance minimums, and revenue projected separately for installation and maintenance work.
What licenses does a landscape business need in Oregon?
Two: an individual landscape construction professional license, obtained after an exam, and a landscape contracting business license for the company that contracts with customers. The LCB lists $200 to apply and $200 for the LCP license, and $285 to apply and $375 for the business license.
How much is the Oregon landscape contractor bond?
From January 1, 2026, the LCB requires a $20,000 bond for landscape contracting businesses and a $15,000 bond for probationary license holders, plus liability insurance of at least $500,000.
How much does landscaping business insurance cost?
Insureon's landscaping customers paid medians of $761 a year for general liability, $3,590 for commercial auto, $1,802 for workers' compensation and $637 for tools and equipment, on a page updated October 12, 2026.
Should a new landscape company buy a compact loader in its first year?
The sample budget shows the trade-off: a Toro Dingo TX 1000 TURBO at its $43,840 list price exceeds the sample's whole first-year remainder of $41,411.88, so the plan finances it, rents per project, or defers the purchase.
What wage should a landscape business plan use for crew members?
A published wage for the area. The BLS national median for landscaping and groundskeeping workers was $18.82 an hour in May 2025, before the employer's 7.65% share of Social Security and Medicare.
The Oregon sample earns $41,411.88 above its listed costs and loses $2,428.12 if it buys its loader in year one. The sentence that decides the plan therefore sits in the funding request, not in the revenue line.
Run field service on HubSpot with FieldRanger
Estimates with e-signature, scheduling and dispatch, a technician mobile app and invoicing, synced to the HubSpot deals and contacts the business already keeps.
Book a demo