Asphalt Paving Scheduling Software:Milling, Base and Paving Days in FieldRanger and HubSpot
Asphalt paving scheduling software on HubSpot: FieldRanger books milling, base and paving days as separate jobs and moves each lift when the air is too cold.
Asphalt paving scheduling software puts each stage of a paving job on its own date: milling, base repair, the lower and upper lifts, then striping. It moves those dates when the air is too cold or the base is wet. FieldRanger books each day as its own job inside HubSpot, with its paver, rollers and trucks.
The trade, its estimate lines and Iowa's surface temperature tables are covered on asphalt paving software. This page covers the calendar: the sequence of days on a mill-and-overlay, the hours a plant and daylight allow, and the weather holds the dispatcher calls from the forecast. Its temperature limits come from Wisconsin's 2025 Standard Specifications, whose section 450 sets them for all plant-mixed asphaltic pavement on state contracts.
The paving sequence as dated jobs
A mill-and-overlay is several kinds of work in a fixed order, and each kind needs different equipment and a different start condition.
| Job | Work | Equipment | Condition before it starts |
|---|---|---|---|
| Milling | The old surface removed to the planned depth | Milling machine, sweeper, trucks for the millings | Lot closed and tenants notified |
| Base repair | Failed areas dug out, aggregate placed and compacted, patches set | Skid steer, plate compactor or roller | Milled surface exposed; base firm, dry and unfrozen |
| Lower layer | The binder lift paved and rolled | Paver, rollers, trucks from the plant | Air temperature at or above the lower-layer limit |
| Upper layer | The surface lift, over a tack coat | Paver, rollers | Air temperature at or above the upper-layer limit |
| Striping | Stalls, arrows and accessible spaces painted | Striping machine | Surface ready for paint by the paint maker's instructions |
Each row is a job, and each day of work is its own job. A lot that takes two days to mill is two milling jobs. The jobs sit on the property manager's HubSpot company and the deal that sold the work, so the deal record shows which stages are done.
When milling slips a day, the dispatcher moves the later jobs as well, and bulk scheduling moves the whole set in one pass. Conflict detection warns when a new date double-books the paver or a technician.
Wisconsin temperature limits and paving dates
WisDOT's section 450.3.2 sets the conditions a paving day must meet. The air temperature is taken about 3 feet above grade, in shade and away from artificial heat. Asphaltic mixture is not placed when it is below 36 °F for upper layers or 32 °F for lower layers, unless the engineer allows it in writing. The specification asks for paving in the northern asphalt zone between May 1 and October 15, and in the southern zone between April 15 and November 1. The contractor notifies the engineer at least one business day before paving.
Cold weather adds a plan. Below 40 °F, placement needs an engineer-accepted cold weather paving plan using a warm mix additive. The National Weather Service forecast is the trigger: when it predicts air below 40 °F at the projected time of paving within the next 24 hours, the contractor confirms or revises that plan. Mixture goes only on a firm, compacted base that is substantially surface-dry, and never over a frozen subgrade or base (WisDOT, 2025 Standard Specifications, section 450, effective with the November 2024 letting).
A private parking lot is not a WisDOT contract, and the limits bind only the contracts that adopt them. They still give a dispatcher a published threshold to schedule against, and a proposal a limit to state: the surface lift waits for 36 °F in the shade.
Plant hours, mix temperature and daylight
The plant sets the start of a paving day. The first load leaves when the supplier's plant opens and reaches the site after the haul. The plant's season and daily hours are the supplier's terms, and they belong in the job's instructions. WisDOT then limits the mix on arrival: it reaches the paver hopper within 20 °F of the temperature the asphaltic material supplier recommends. Loads are covered in inclement weather or when the air falls below 65 °F.
Daylight sets the end. The specification has rolling done during daylight hours unless the contractor provides artificial light the engineer finds satisfactory. A paving job on a late-October afternoon therefore has less time to roll than the same job in July. The last load has to arrive while there is light to compact it.
In FieldRanger, the paving job's arrival window records the start the plant allows. A job-specific checklist at the start of placement records three readings: the air temperature in the shade, the first ticket's mix temperature against the supplier's figure, and whether the loads arrived covered. Each plant ticket is photographed onto the work order.
Weather holds without a weather feed
FieldRanger has no weather feed and does not read a thermometer. The dispatcher reads the National Weather Service forecast, the source WisDOT itself names, and decides each hold. A forecast of rain, or of air below 36 °F at paving time, moves the surface lift. A wet base moves the lower lift.
When a hold is called, the dispatcher drags the paving job to its new date on the calendar and moves the striping job behind it. Conflict detection checks the new date against the paver, the rollers and the operators already booked. Property managers can receive the new closure date by SMS through Twilio, and push notifications put the change on each technician's phone.
The season boundary is also the dispatcher's call. FieldRanger does not block bookings after October 15. A northern-zone surface lift that slips past that date needs a cold weather paving plan on a state contract, or waits for spring. The office decides which before the job is moved.
Operators, pavers and rollers on the calendar
A paving crew runs a paver, several rollers and a string of trucks, and one FieldRanger job carries the whole crew, from the foreman to each roller operator, so every operator is on the job record.
Skill-based assignment matches milling, paver and roller work to operators by certification and expertise. The paver, the rollers and the milling machine are equipment records assigned to jobs. The equipment availability calendar prevents double-booking, so a milling machine on Monday's lot cannot also be booked across town. Equipment maintenance schedules service, and usage history shows which jobs each machine worked. Dump trucks and the lowboy are vehicles, with live GPS positions and pre-trip inspection checklists, and each clock-in records where the worker was.
A mill-and-overlay week in Wisconsin's northern zone
The lot is a retail center's parking area in the first week of October, inside the northern zone's window.
- Monday: the milling job. The lot closes, the milling machine and sweeper are checked out to the job, and the millings leave on the trucks.
- Tuesday: the base repair job. Two failed areas are dug out and patched, with photos of each before and after.
- Wednesday: the lower-layer job. At the 7:00 start the shade reading is 34 °F, above the 32 °F lower-layer limit, and the binder lift goes down.
- Thursday: the upper-layer job. The forecast shows air below 36 °F at paving time, and the contractor has no cold weather plan. The dispatcher moves the surface lift to Friday and the striping job to the following Monday.
- Friday: the upper-layer job runs at a 45 °F shade reading, and the property manager signs the walk-through on the technician's phone.
- The following Monday: the striping job paints the stalls and accessible spaces.
Six dates, six jobs and one move, all on the retail center's HubSpot deal. Had that Thursday been October 15, Friday would have fallen outside the northern zone's window. On a state contract the surface lift would then have needed a cold weather plan, or a date the next May.
Paving jobs on the HubSpot deal
Job status shows on the HubSpot deal, so the salesperson who sold the overlay sees milling done and the surface lift pending. Completions and notes are logged to the HubSpot timeline. A job status change can trigger a HubSpot workflow, such as a task to confirm the striping date once the surface lift is complete.
Each completed work order generates its invoice, and invoices and payments sync to QuickBooks. Revenue reports show job revenue and margin by customer or service type, which separates overlays from sealcoating and patching. Tonnage and square yards for each lift are priced on paving estimating software, and the scheduled jobs carry the quantities the estimate set.
Paving scheduling outside FieldRanger
- No weather feed; the dispatcher reads the forecast and calls each hold.
- No plant load scheduling, scale tickets or truck dispatch between the plant and the paver.
- No multi-day job; each day of milling, base work, paving or striping is its own job.
- No automatic stop at the end of the paving season.
- No progress billing or retainage on commercial paving contracts.
Frequently asked questions
What is asphalt paving scheduling software?
Software that books each stage of a paving job, such as milling, base repair, the lifts and striping, on its own date with its equipment and operators, and moves those dates for weather. FieldRanger does this inside HubSpot, with each day as its own job.
What is the minimum air temperature for paving asphalt in Wisconsin?
WisDOT's 2025 specification bars placing asphaltic mixture below 36 °F for upper layers and 32 °F for lower layers, measured about 3 feet above grade in shade, unless the engineer allows it in writing. Below 40 °F a cold weather paving plan is required.
When does the asphalt paving season end in Wisconsin?
WisDOT asks for paving between May 1 and October 15 in the northern asphalt zone and between April 15 and November 1 in the southern zone.
How are milling and paving scheduled on a mill-and-overlay?
As separate jobs on separate dates: milling, base repair, the lower layer, the upper layer and striping. In FieldRanger each day is its own job, and bulk scheduling moves the set when one stage slips.
Does asphalt paving scheduling software check the weather?
FieldRanger does not; it has no weather feed. The dispatcher reads the National Weather Service forecast and drags the affected jobs to new dates.
How much does asphalt paving scheduling software cost?
FieldRanger is priced per technician, with plans on the pricing page. The trial is 14 days and needs no card.
At 34 °F the Wednesday binder lift went down, and at a forecast below 36 °F the Thursday surface lift did not. Each decision sits on its own FieldRanger job, with the shade reading on its checklist. The trade as a whole is on asphalt paving software and other trades under field service software by industry. Per-technician plans are on pricing, where Start free trial gives 14 days with no card.