A contractor estimate template is the priced scope a registered or licensed contractor gives a property owner, written so that the signed copy serves as the contract: the license number, the scope by trade, allowances, exclusions, the payment schedule and the change-order terms. The example below fills every field for a basement finish in Lancaster, Pennsylvania.

FieldRanger, which makes field service software that runs inside HubSpot, publishes this field list with its other free field service templates, and none of it is gated. The contractor version differs from a one-trade estimate for a legal reason: several states set what a home improvement contract must contain before it binds the owner.

Contractor estimate template: fields and entries

The table lists the template's fields; the free .xlsx download, with no sign-up, carries them on a Template sheet. Each row becomes a box or a numbered clause in a Word or Google Docs copy.

Contractor estimate template fields and what goes in each
FieldWhat goes in it
ContractorBusiness name, street address and telephone number
License or registration numberThe number the state or city issues to the contractor, printed on the estimate
InsuranceLiability carrier and coverage amounts at signing, where the state requires them
Estimate number, date and expiryA unique number, the date of the transaction and the date the prices lapse
Owner and job siteEach owner who signs, with address and telephone, and the area of work
Basis of estimateSite visit date, measurements and any drawings the prices rest on
Line items by tradeTrade, task, quantity, unit, unit price and line total
SubcontractorsName, address, telephone and trade of each subcontractor known at signing
AllowancesEach item the owner selects later, its amount and what the amount buys
Time-and-materials workWork priced by the hour, with its initial estimate and cap
ExclusionsWork outside the price, named one by one
PermitsPermits the contractor obtains, and whether fees are billed at cost
Contract price and sales taxThe total, and the state rule behind the tax entry
ScheduleApproximate start and completion dates
Deposit and payment scheduleThe down payment, special-order materials on their own line, and each progress payment with the work it pays for
Change-order termsHow a change is written, priced, signed and dated before the work
WarrantyWorkmanship warranty period and coverage
Cancellation noticeThe owner's right to cancel, in the form the state or the FTC requires
AcceptanceOwner's and contractor's signatures, with dates

The general estimate template prices one trade and stops at variance terms, a deposit and a signature. The contractor version adds subcontractors, allowances, a capped hourly line, payments tied to finished work and change-order terms.

Filled contractor estimate: basement finish in Lancaster, Pennsylvania

The example finishes 820 square feet of basement with a wet bar and a built-in bookcase. The contractor's crew does the carpentry; electrical and plumbing are subcontracted. The business, owners and prices are illustrative; the terms follow Pennsylvania's Home Improvement Consumer Protection Act.

Filled contractor estimate, header and terms (example business, illustrative entries)
FieldExample entry
ContractorExample Carpentry and Remodeling LLC, 210 Example Street, Lancaster, PA 17603 · 717-555-0134
License or registration numberPennsylvania home improvement contractor registration PA000000 (example)
InsuranceExample Mutual: $1,000,000 personal injury, $1,000,000 property damage (illustrative)
Estimate number, date and expiryCE-2026-061 · November 12, 2026 · valid until December 11, 2026
Owner and job siteElena and Marcus Ortiz, 48 Example Avenue, Lancaster, PA 17601 · 717-555-0172 · unfinished basement
Basis of estimateMeasured November 6, 2026; layout sketch S-1 dated November 9, 2026
SubcontractorsExample Electric LLC, 15 Example Road, Lancaster, PA 17602, 717-555-0150 · Example Plumbing Co., 77 Example Pike, Lititz, PA 17543, 717-555-0181
ExclusionsEgress window and any sleeping room; waterproofing beyond the capped crack repair; heating ducts; moving stored contents
PermitsBuilding permit, obtained by the contractor, billed at cost
ScheduleStart about January 11, 2027 · completion about February 26, 2027
Change-order termsWritten change order, dated, signed by both parties and priced, before any changed work; allowance differences settled the same way
WarrantyWorkmanship, one year from completion
Cancellation noticeThree-business-day rescission notice attached; registration hotline 1-888-520-6680 printed
AcceptanceOwners' and contractor's signatures and dates
Filled contractor estimate, line items by trade (illustrative prices)
Trade and taskQuantityUnitUnit priceLine total
General conditions: protection, dumpster, cleanup5week$640.00$3,200.00
Carpentry: frame walls, 2 x 4 on treated plate156linear ft$31.00$4,836.00
Insulation: 2-inch rigid foam on foundation walls920sq ft$3.40$3,128.00
Electrical, subcontractor quote: 3 circuits, 16 receptacles, 14 recessed lights, alarms1lot$7,150.00$7,150.00
Plumbing, subcontractor quote: wet bar sink1lot$2,380.00$2,380.00
Drywall: hang, tape and finish2,450sq ft$3.10$7,595.00
Carpentry: prehung interior doors4each$440.00$1,760.00
Carpentry: paint-grade base and casing290linear ft$7.25$2,102.50
Carpentry: site-built bookcase, 8 ft1each$3,850.00$3,850.00
Carpentry: install bar cabinets1lot$980.00$980.00
Paint: walls, ceiling and trim1lot$3,600.00$3,600.00
Flooring installation, labor only820sq ft$3.25$2,665.00
Trade subtotal$43,246.50
Filled contractor estimate, allowances and contract price (illustrative)
LineBasisAmount
Trade subtotalLine items above$43,246.50
Allowance: luxury vinyl plank880 sq ft, owners' choice, delivered$3,300.00
Allowance: bar sink and faucetOwners' choice, delivered$650.00
Allowance: three pendant lightsOwners' choice, delivered$540.00
Special-order materials: bar cabinetsMade to measure, not returnable$3,240.00
Building permitAt cost$620.00
Contract priceNo sales tax charged$51,596.50
Time-and-materials, outside the priceSeal foundation crack: initial estimate $1,200.00, capped at $1,320.00 without a written change orderUp to $1,320.00
Total potential cost$52,916.50
Filled contractor estimate, deposit and payment schedule (illustrative)
PaymentWork finished before it is dueAmount
Down paymentContract signed; three-day rescission period ended$8,000.00
Special-order materialsSame date, separate line$3,240.00
Progress payment 1Framing, insulation and rough-in inspected$12,000.00
Progress payment 2Drywall finished$11,000.00
Progress payment 3Doors, trim, bookcase, cabinets and paint$11,000.00
Final paymentFlooring, final inspection, punch list$6,356.50
Total$51,596.50

The crack repair is billed at actual cost, up to its cap, with the next progress payment. Each payment goes out on a contractor invoice template that quotes CE-2026-061, so the bill names the same work as the estimate.

Pennsylvania home improvement contract rules in the example

Pennsylvania's Home Improvement Consumer Protection Act states that no home improvement contract "shall be valid or enforceable against an owner" unless it meets section 7(a) (Act 132 of 2008, 73 P.S. § 517.1 et seq., checked November 2026). That section requires the registration number, approximate start and completion dates, the down payment and special-order materials on separate lines, every subcontractor known at signing, and liability coverage of at least $50,000 each for personal injury and property damage. Specifications "cannot be changed without a written change order signed by the owner and the contractor". The contract must also carry the Attorney General's toll-free number and a rescission notice: three business days from signing, "regardless of where the contract was signed". The Attorney General's contractor FAQ adds that contractors "must include their registration number in their advertisements, contracts, estimates and proposals", and gives the toll-free number as 1-888-520-6680 (Pennsylvania Office of Attorney General, Contractor FAQ, checked November 2026).

Section 9 caps deposits on contracts above $5,000 at one-third of the price, or one-third plus special-order materials designated in the contract: items that are not stock and cannot be returned for a refund or credit. One-third of $51,596.50 is $17,198.83, so the $8,000 down payment fits.

The crack repair follows the Act's time-and-materials rule: an initial cost estimate, a limit of 10 percent above it, the total potential cost in dollars, and a signed change order for anything beyond.

The tax entry is empty because Pennsylvania's business guidance says contractors are not required to collect sales tax on construction activities (Pennsylvania Business One-Stop Hub, checked November 2026). Other states set different deposit limits; the construction estimate template applies California's. This page is not legal advice.

Carpentry estimate template and the cost estimate behind it

A carpentry estimate template is the contractor estimate with carpentry priced by unit: linear feet of framing, each door, linear feet of trim, each built-in. A cost estimate template is the office sheet behind those prices: crew hours at a cost rate, materials at cost, and the margin left. The owner sees the price and never the cost estimate.

Cost estimate behind the carpentry lines (illustrative; labor at $54 per crew hour including payroll burden)
Carpentry lineCrew hoursLabor costMaterialsDirect costPriceGross margin
Framing, 156 linear ft48$2,592.00$1,690.00$4,282.00$4,836.0011.5%
Prehung doors, 410$540.00$820.00$1,360.00$1,760.0022.7%
Base and casing, 290 linear ft20$1,080.00$610.00$1,690.00$2,102.5019.6%
Bookcase, 8 ft30$1,620.00$1,080.00$2,700.00$3,850.0029.9%
Carpentry total108$5,832.00$4,200.00$10,032.00$12,548.5020.1%

Gross margin is price less direct cost, divided by price, before overhead. Framing earns 11.5 percent against 29.9 percent on the bookcase: the estimator raises the framing price or accepts the thin line to win the job. Afterwards, the crew's logged hours replace the 108 estimated ones.

Contractor estimate instructions in order of preparation

  1. Measure the site, photograph the conditions the price depends on, and date the visit.
  2. Write the scope trade by trade, in the order the crews will work.
  3. Price each line from the cost estimate or a dated subcontractor quote, and name each known subcontractor.
  4. Set an allowance for each unchosen item, and move work that cannot be priced until opened into a capped time-and-materials line.
  5. List exclusions, permits and the tax treatment for the state of the work.
  6. Total the contract price, then set the deposit within the state's limit, with special-order materials on their own line.
  7. Tie each progress payment to finished, inspected work, and write the change-order terms, warranty and cancellation notice.
  8. Confirm that the payments add to the contract price, that the deposit is under the cap, and that every subcontractor in the line items appears in the subcontractor row.

Estimating software after the signed contractor estimate

On paper, the Lancaster figures are copied three times after signature, into the schedule, the change orders and the invoices, while the crew hours sit on timesheets apart from the cost estimate they would correct.

In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or in FieldRanger, tied to the HubSpot deal it belongs to; either way it writes the HubSpot deal's line items and amount, and it goes out for signature through PandaDoc. The won deal becomes a job with its context carried over, and the deal record shows the job's status. A deposit invoice goes out before the work starts, with the balance invoiced on completion. Technicians clock in and out with time logged against each job, the invoice is generated from the completed work order, and revenue reports show margin by customer or service type. The estimating software page covers the estimate itself. FieldRanger has no progress billing or retainage, so a remodeler billing against a schedule of values needs construction billing software beside it. A seven-week remodel also runs as one job per day, because multi-day jobs are not built.

Fill it in here, or download the spreadsheet

The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.

Frequently asked questions

What should a contractor estimate include?

The license or registration number, the owner and job site, line items by trade, subcontractors, allowances, exclusions, permits, the price and tax treatment, the schedule, the deposit and payment schedule, change-order terms, the warranty, the cancellation notice and signatures.

Is there a free contractor estimate template?

Yes. The page offers a free .xlsx download with no sign-up: a Template sheet with every field and the line items, and a Sample sheet with the Lancaster estimate.

What is the difference between a contractor estimate and a cost estimate?

A contractor estimate states the price the owner signs. A cost estimate is the contractor's internal sheet behind it: crew hours at a cost rate, materials at cost and the margin on each line.

How much of a deposit can a contractor take in Pennsylvania?

On a home improvement contract above $5,000, no more than one-third of the price, or one-third plus special-order materials designated in the contract, under section 9 of the Home Improvement Consumer Protection Act.

Is a signed contractor estimate a binding contract?

It can be, once it holds the scope, price, payment terms and both signatures. In Pennsylvania it binds the owner only if it also carries the section 7(a) items, such as the registration number and rescission notice.

The Lancaster basement from signature to final payment

Estimate CE-2026-061 governs what follows it: the change order that settles the flooring allowance once the Ortizes choose a plank, the crack repair billed against its $1,320.00 cap, and four payments, each drawn from the free field service templates. Per-technician prices for FieldRanger are listed on pricing; a 14-day Start free trial asks for no card.