Template

Drywall Estimate Template:Sheet Count with Waste, GA-214 Finish Levels, Joint Compound Coverage and Washington Sales Tax for a Spokane Basement

Drywall estimate template: sheets from square footage with waste, GA-214 finish levels, joint compound coverage and Washington sales tax on a Spokane basement.

Updated 13 min read

Download .xlsxExcel spreadsheet · 14 KB · Free, no sign-upFill it in online

A drywall estimate template prices hanging and finishing by area: each room and surface, board area net of large openings, sheets with a waste allowance, the finish level for each surface, compound, tape and bead, cleanup, site conditions such as heat, tax and terms. The sample prices a four-room basement finish in Spokane, Washington.

The field list is one of the free field service templates kept by FieldRanger, software for trade businesses that runs inside HubSpot. One field separates a drywall estimate from a generic one: the level of finish. The Gypsum Association's GA-214 standard defines six levels, from bare board to a skim coat over the whole surface. The level chosen for each wall sets its coats, its compound and its finishing labor.

Drywall estimate fields: rooms, board area, waste, finish level and conditions

The table lists the template's fields; the free .xlsx download, with no sign-up, carries them on a Template sheet. A copy kept in Word, Google Docs or a spreadsheet carries the same rows, with the area takeoff as its own tab.

Drywall estimate template fields and what goes in each
FieldWhat goes in it
ContractorBusiness name, address, telephone, state contractor registration number
Estimate number, date and expiryA unique number, the issue date, the date the price lapses
Customer and propertyName, address, the area being finished, access for board delivery
Framing and substrateStud and joist spacing, ceiling height, framing inspection status
Rooms and surfacesEach wall and ceiling by room, with dimensions; soffits and bulkheads
OpeningsLarge openings deducted from board area; the size below which openings stay in
Board type and thicknessRegular, moisture-resistant or fire-rated panel; thickness; sheet size
Board area and sheet countArea by board type, the waste allowance, and sheets rounded up
Finish level by surfaceThe GA-214 level for each wall and ceiling, and the paint or covering it receives
Finishing materialsJoint compound by coverage, tape, corner bead and trim
Mock-upA sample area finished and approved before the rest, where Level 3 to 5 applies
Site conditionsMinimum temperature during finishing, ventilation, power, who provides heat
Cleanup and scrapDaily cleanup, scrap removal and disposal
ExclusionsFraming, insulation, texture, primer and paint, tile backer board
OptionsUpgrades priced outside the total
TaxThe state's treatment of the contract and the rate where the work is done
Payment terms and acceptancePayments, methods, signature and date

GA-214 levels of finish and what each level adds to the estimate

The Gypsum Association's quick reference guide to GA-214 lists, for each level, the tape, the additional coats on flat joints and inside corners, the coats on accessories and fasteners, and any skim coat over the whole surface. It then states where each level is "Typically specified" (Gypsum Association, GA-214-2022 Recommended Levels of Finish for Gypsum Panel Products, Quick Reference Guide, copyright 2022, copy hosted by CISCA). The table below follows that guide.

GA-214-2022 levels of finish, the work at each level and where it is specified (Gypsum Association quick reference guide)
LevelTape and joint workFasteners and accessoriesSkim coatWhere GA-214 places it
0NoneNoneNoneTemporary construction, or where the final decoration is undecided
1Tape set in joint compoundNone; accessories optionalNoneSmoke barriers and concealed areas such as plenums and attics
2Tape embedded and wiped, leaving a thin coat over the tape1 coatNoneSubstrate for tile; garages, warehouse storage and similar areas where appearance is not a concern
3Plus 1 coat on flat joints and 1 on inside corners2 coatsNoneHeavy or medium texture before painting, or heavy-duty wallcoverings
4Plus 2 coats on flat joints and 1 on inside corners3 coatsNoneSmooth walls with flat paint, light or non-continuous texture, or wallcoverings
5Plus 2 coats on flat joints and 1 on inside corners3 coats1 coat over the entire surfaceNon-flat or gloss paint, dark or deep-tone paint, critical lighting

Two of the guide's statements become estimate lines. Level 4 covers smooth walls with flat paint, but "Non-flat or dark/deep tone paints are not recommended; refer to Level 5." A wall the owner plans to paint charcoal is therefore priced at Level 5. The estimate records the paint choice beside the level, so the reason for the price stays with it. The guide also states that for Levels 3, 4 and 5 a specified jobsite mock-up "shall serve as a benchmark for the purpose of acceptance of the related widespread work". In a house with no design professional, the estimate names the sample area and who approves it.

Levels 4 and 5 carry the same coats on joints and fasteners. The difference is the skim coat over the entire surface, which the guide credits with a uniform surface and less risk of joints showing through the paint. In price, the difference is one more coat of labor and compound across the full wall.

Filled drywall estimate: four-room basement finish in Spokane, Washington

The basement has new framing with joists at 16 inches on center and an 8-foot ceiling. It holds a family room with a dark-painted media wall, a bedroom, a bathroom with a tile wainscot, and a mechanical and storage room. The business, customers and prices are samples; the finish levels, coverage figure, tax rate and registration rules come from the sources cited.

Filled drywall estimate, header and terms (sample business and entries)
FieldSample entry
ContractorExample Wallboard LLC, 120 Example Avenue, Spokane, WA 99201 · 509-555-0193 · Washington L&I specialty contractor registration (sample number)
Estimate number, date and expiryDW-2026-0388 · November 12, 2026 · valid until December 31, 2026 · hang December 7, finish complete December 18
Customer and propertyAna and Luis Marchetti, 2400 Sample Street, Spokane, WA 99203 · basement · board delivered through the walkout door
Framing and substrateWood studs and joists at 16 in. on center · 8 ft ceiling · framing and insulation inspections passed before hanging
Board type and thickness1/2 in. regular panel, 4 x 12 ft, on walls and ceilings · 1/2 in. moisture-resistant panel in the bathroom
Openings12 ft wide opening to the stair hall deducted · egress window and doors left in the area, with their waste in the allowance
Finish level by surfaceMedia wall: Level 5, deep-tone eggshell paint · other family room, bedroom and bathroom surfaces: Level 4, flat paint · tile wainscot and mechanical room: Level 2
Mock-upA 4 x 8 ft section of the media wall finished first and approved by the owners before the rest of the skim coat
Site conditionsOwners keep the furnace running and the basement at 55°F or more from hanging through the last coat · contractor's temporary heat excluded
ExclusionsFraming; insulation; primer and paint; texture; cement board behind the tub, installed by the tile setter
Payment terms and acceptance$1,500.00 at board delivery; balance on completion · check or card · owners' signatures and date
Filled drywall estimate, line items (sample prices; tax at the Spokane rate cited below)
LineQuantityUnit priceLine total
1/2 in. regular gypsum panel, 4 x 12 ft49 sheets$19.80$970.20
1/2 in. moisture-resistant gypsum panel, 4 x 12 ft6 sheets$27.50$165.00
Hang, screws included, all surfaces2,300 sq ft$0.62$1,426.00
Finish, Level 2: wainscot and mechanical room526 sq ft$0.48$252.48
Finish, Level 4: walls and ceilings1,630 sq ft$1.05$1,711.50
Finish, Level 5 with skim coat: media wall, mock-up included144 sq ft$1.70$244.80
All-purpose joint compound, 4.5 gal pail5$23.00$115.00
Paper joint tape, 500 ft roll4$6.50$26.00
Corner bead, 8 ft, at the bulkhead, window return and stair opening9$5.25$47.25
Daily cleanup, scrap haul and disposal1$260.00$260.00
Subtotal$5,218.23
Washington retail sales tax, Spokane, 9.1%$474.86
Total$5,693.09
Option, outside the total: Level 5 on the other family room walls432 sq ftadd $0.65add $280.80 plus tax

Board area, sheet count and compound for the Spokane basement

Area comes first, by room and by finish level, because the level prices the finishing and the board type prices the sheets.

Board area by room and finish level, Spokane basement (sample dimensions)
Room and surfaceCalculationAreaLevel
Family room, media wall18 ft x 8 ft144 sq ft5
Family room, other walls84 ft perimeter x 8 ft, less 96 sq ft opening and 144 sq ft media wall432 sq ft4
Family room, ceiling24 ft x 18 ft432 sq ft4
Family room, duct bulkhead24 ft x (1 ft face + 1.33 ft bottom)56 sq ft4
Bedroom, walls50 ft perimeter x 8 ft400 sq ft4
Bedroom, ceiling12 ft x 13 ft156 sq ft4
Bathroom, walls above the wainscotMoisture-resistant panel100 sq ft4
Bathroom, ceilingMoisture-resistant panel, 9 ft x 6 ft54 sq ft4
Bathroom, behind the tile wainscotMoisture-resistant panel80 sq ft2
Mechanical room, walls and ceiling336 sq ft walls + 110 sq ft ceiling446 sq ft2
Total2,300 sq ft

The bathroom's 240 square feet of wall lose 60 square feet to the tub alcove, which takes cement board. That leaves 180 square feet of moisture-resistant panel on the walls and 54 on the ceiling. That 234 square feet is one board count; the other 2,066 square feet of regular panel is the second.

Sheets follow from area, the waste allowance and the sheet size. The sample company's allowance is 12 percent, a company figure that covers offcuts at openings, the bulkhead and the ceiling edges. Regular panel: 2,066 x 1.12 = 2,314 square feet, divided by 48 square feet a sheet, is 48.2, rounded up to 49 sheets. Moisture-resistant panel: 234 x 1.12 = 262 square feet, or 5.5 sheets, rounded up to 6. Rounding happens once, at the end of each board type, not room by room.

Compound follows USG's published coverage for its ready-mixed all purpose joint compound: "Approximately 10 gal./1,000 sq. ft. (37.8 L/100 sq. m) of gypsum panels" (USG Sheetrock Brand All Purpose Joint Compound submittal sheet, J1969, rev. 6-22). The sheet's application steps describe tape plus two further coats on joints and at least three coats on fasteners and corner bead, the work of Level 4. At that rate the 1,774 square feet at Levels 4 and 5 take 17.7 gallons. The Level 2 areas get half the rate, 2.6 gallons, and the media wall's skim coat gets a 1.5-gallon allowance; both are the sample company's figures, not USG's. The 21.9 gallons round up to five 4.5-gallon pails.

The same USG sheet sets the site condition. "In cold weather and during gypsum panel joint finishing, temperatures within the building shall be maintained at a minimum of 55°F (13°C)," with ventilation to carry off moisture. A Spokane basement finished in December depends on heat, so the estimate states who supplies it.

Washington sales tax and contractor registration on a drywall estimate

Washington taxes the drywall contractor's labor as well as the board. Under the Department of Revenue's construction guide, businesses performing retail services "such as custom prime construction" must "collect and remit retail sales tax on their total charges unless a specific exemption applies" (Washington DOR, Construction industry guide overview, checked November 12, 2026). "The taxable amount includes charges for permits and other fees, labor, profit, materials and charges for subcontractors." Tax is figured at the rate of the jurisdiction where the work is performed. "Sales tax is considered collected only when stated separately on contract documents and/or sales invoices," so the estimate carries it as its own line. A drywall company working as a subcontractor to a general contractor is in a different position: it takes a reseller permit from the prime contractor, and the prime collects the tax.

The Marchettis hire the drywall company directly, so it is the prime contractor and the tax line is its own. The City of Spokane, location code 3210, carries a 9.10% combined rate, 6.50% state and 2.60% local, in the Department's table for October 1 through December 31, 2026 (Washington DOR, Local sales and use tax rate table, Quarter 4 2026). The estimate expires December 31 so the stated rate and the work fall in the same quarter; a January start is re-priced at the 2027 rate.

The registration row comes from the Department of Labor and Industries: "Washington State requires all construction contractors to register with L&I" (Washington L&I, Register as a contractor, checked November 12, 2026). The registration number appears on "business cards, Yellow Page ads, newspaper ads, internet ads, estimates and bid proposals." A drywall-only company registers as a specialty contractor, and specialty contractors "can only perform work in the specialty they are registered in." The bond is $15,000 for a specialty contractor and $30,000 for a general contractor. Liability insurance is $200,000 public liability and $50,000 property damage, or a $250,000 combined single limit, and new registration costs $150.20.

Drywall estimate procedure from room sketch to signed scope

  1. Sketch each room, measure walls, ceilings, soffits and bulkheads, and record stud and joist spacing.
  2. Deduct openings above the company's size threshold and leave the rest in the area.
  3. Assign a board type to each surface and total the area by board type.
  4. Apply the waste allowance, divide by the sheet area, and round up once per board type.
  5. Assign a GA-214 level to each surface from the paint or covering it will receive, and name the mock-up area for Levels 3 to 5.
  6. Compute compound from the manufacturer's coverage, then tape and bead from the joint and corner layout.
  7. Add cleanup and scrap, state the heat and ventilation conditions, list exclusions and options.
  8. Apply the tax at the rate where the work is done, then confirm that the area by level adds up to the area by board type.

Drywall estimate, general estimate template and construction estimate template

The drywall estimate is a trade form of the general estimate template: the same header, terms and acceptance, with board area, finish levels and drying conditions in place of generic line items. When the basement job also needs framing, electrical rough-in, insulation and paint priced together, the construction estimate template organizes the work by trade, and the drywall lines above become one section of it.

Estimating software and the finish level on the job record

On a paper estimate, the finish level and the mock-up approval live in two places: the estimate and the finisher's memory of what the owners said about the sample wall.

In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or built in FieldRanger and kept tied to the deal. PandaDoc sends it for signature. The won deal becomes a job with its context carried over. Notes and special instructions, such as the media wall's paint and its Level 5 finish, are visible to every team member. Photos of the approved mock-up attach to the work order and sync to the customer's HubSpot record. Time is logged against each job, and the invoice is generated from the completed work order. The estimating software page describes how the estimate and the deal stay connected.

A drywall job runs across days with drying time between coats, and FieldRanger does not schedule multi-day jobs: hanging and each finishing visit are separate jobs on the calendar. The room areas and board counts come from the tape measure or a takeoff tool, and the lines are priced from the price book of services, parts and rates.

Fill it in here, or download the spreadsheet

The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.

Frequently asked questions

What should a drywall estimate include?

The contractor and registration number, the property, framing and substrate, each room's walls and ceilings, deducted openings, board type and thickness, area and sheet count with waste, the finish level for each surface, compound, tape and bead, a mock-up where Levels 3 to 5 apply, site conditions, cleanup, exclusions, options, tax and terms.

How many sheets of drywall are needed for a room?

Add the wall and ceiling area, deduct large openings, multiply by one plus the waste allowance, and divide by the sheet's area: 32 square feet for a 4 x 8 sheet, 48 for a 4 x 12. Round up once per board type.

What are the levels of drywall finish?

GA-214 defines Levels 0 through 5. Level 2 adds a thin coat over embedded tape and one coat on fasteners; Level 4 adds two coats on flat joints and three on fasteners and accessories; Level 5 adds a skim coat over the entire surface.

When is a Level 5 drywall finish needed?

GA-214 places Level 5 where smooth walls receive non-flat or gloss paint, dark or deep-tone paint, or critical lighting. It does not recommend non-flat or deep-tone paint over Level 4.

How much joint compound does drywall finishing take?

USG lists its ready-mixed all purpose joint compound at approximately 10 gallons per 1,000 square feet of gypsum panels. Level 2 surfaces take less and a Level 5 skim coat takes more; the estimate states its own allowance for each.

Is drywall labor taxable in Washington?

Yes, when the drywall company contracts with the owner. Washington's Department of Revenue includes labor, materials, fees and profit in the taxable amount on custom construction, at the rate where the work is performed: 9.1% in the City of Spokane for October through December 2026.

The Marchetti basement at 55 degrees in December

Estimate DW-2026-0388 commits two things beyond the price: Level 5 on the media wall only after the owners sign off on the 4 x 8 sample, and finishing only while the furnace holds the basement at 55°F or more. If the owners choose Level 5 for the other family room walls, the option adds $280.80 before tax and one more skim-coat visit. FieldRanger's per-technician plans are on pricing, the invoice and work order that follow this estimate are in the free field service templates, and Start free trial opens 14 days of use with no card.

FieldRanger runs field service inside HubSpot

Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.

Book a demo