Template
Flooring Estimate Template:Square Footage with Waste Factor, Moisture Tests, Subfloor Prep and New Jersey Tax on Installation
Flooring estimate template with square footage, manufacturer waste factors, moisture tests and subfloor prep, filled for a Montclair, New Jersey hardwood job.
A flooring estimate template is the priced scope of a floor installation: square footage by room, the manufacturer's waste factor, subfloor moisture tests, preparation, flooring and installation, trim, removal and haul-away, tax, price and terms. The example fills every field for oak plank upstairs and rigid core plank in the basement of a Montclair, New Jersey house.
The field list is one of the free field service templates kept by FieldRanger, the flooring business software that runs inside HubSpot. Its waste, moisture and flatness rows come from the manufacturer's installation instructions, and its tax and registration rows from New Jersey rules, each cited below. Starting a flooring company is covered in the flooring business guide.
Flooring estimate fields: rooms, square footage, waste, moisture, prep and trim
The table lists the fields in order; the page also offers them as a free .xlsx download with no sign-up. In Word, Google Docs or a spreadsheet the rows stay the same; a room sketch with dimensions goes on the second page.
| Field | What goes in it |
|---|---|
| Contractor | Business name, address, telephone and the state contractor registration number |
| Estimate number, date and expiry | A unique number, the issue date and the date the price lapses |
| Customer and property | Name, address, year built, and the floor level of each room |
| Rooms and square footage | Each room's length, width and area; the area for each product |
| Product | Manufacturer, line, species or core, width, carton coverage |
| Waste factor | The cutting allowance the manufacturer's instructions set for the product and layout |
| Quantity ordered | Area plus waste, rounded up to whole cartons |
| Moisture tests | Method, number of readings, results and the manufacturer's limit |
| Flatness | The tolerance, the readings, and the areas to sand or fill |
| Removal | Existing flooring removed, fasteners pulled, and haul-away |
| Subfloor preparation | Renailing, sanding high spots, leveler at low spots, moisture barrier |
| Installation | Method for each product: nail-down, glue-down or floating |
| Trim and transitions | Quarter round or base, reducers, T-moldings and stair parts by count or linear foot |
| Furniture and access | Moving, appliance pulls and door undercuts |
| Exclusions | Asbestos-suspect material, structural repair, painting, baseboard replacement |
| Tax | How the state taxes the flooring and the installation charge |
| Required notices | State registration number and consumer notice text |
| Warranty | Manufacturer warranty conditions; workmanship warranty |
| Payment terms and acceptance | Deposit, balance, methods, signature and date |
Waste factor, moisture and flatness limits in Bruce installation instructions
The waste factor belongs to the product, not to the estimator's habit. AHF's instructions for Bruce solid 3/4-inch flooring state that "5% must be added to the actual square footage needed for cutting and grading allowance (10% for diagonal installations; 10-15% for glue down installation)", and the same document sets the moisture rule for wood subfloors: the subfloor "must not exceed 12% moisture content", and the difference between subfloor and flooring "must not exceed 3% (2% for plank)" (AHF, Bruce Solid Wood Flooring 3/4 in. Strip and Plank Installation Instructions, © 2021, checked November 12, 2026). Its rigid core instructions set a different allowance: "Most installations will need approximately a 10% cutting allowance added to the square footage of the room" (AHF, Bruce Rigid Core Locking Installation System, © 2024).
| Row | Solid 3/4 in. hardwood | Rigid core locking plank |
|---|---|---|
| Waste factor | 5% straight lay; 10% diagonal; 10-15% glue-down | Approximately 10% |
| Grade level | On or above grade | All grade levels |
| Wood subfloor moisture | Subfloor at most 12%; within 2% of plank flooring, 3% of strip | Dry |
| Concrete moisture | Over a suitable subfloor only; calcium chloride at most 3 lbs. per 1,000 sq ft in 24 hours, or relative humidity at most 75% | At most 5 lbs. per 1,000 sq ft by calcium chloride, and/or relative humidity of 95% |
| Moisture barrier | A moisture retardant system where excess moisture is present or anticipated | 6 mil poly film over concrete subfloors for floating installations |
| Flatness | Within 3/16 in. in 10 ft or 1/8 in. in 6 ft | Within 3/16 in. in 10 ft or 1/8 in. in 6 ft |
| Expansion | At least 3/4 in. around all vertical obstructions | 1/4 in. at all walls |
The grade-level row picks the products before the estimate prices them. A basement is below grade, so the solid plank stops at the main floor and the basement takes rigid core, with its own waste factor and its own moisture test.
Filled flooring estimate: oak plank upstairs and rigid core in a Montclair, New Jersey basement
The house is a 1928 center-hall colonial. Carpet covers plank subflooring in the living room, dining room and front hall, and painted concrete in the basement family room; the basement laundry next to it has a floor drain. The business, customers, prices and carton sizes are samples; the waste, moisture, flatness, tax and notice rows follow the sources cited.
| Field | Sample entry |
|---|---|
| Contractor | Example Floors LLC, 18 Example Place, Montclair, NJ 07042 · 973-555-0127 · NJ HIC reg. # 13VH00000000 (sample) |
| Estimate number, date and expiry | FL-2026-0147 · November 12, 2026 · valid until December 12, 2026 · installation week of January 11, 2027 |
| Customer and property | Teresa and Malik Ruiz, 64 Sample Road, Montclair, NJ 07042 · built 1928 · main floor above grade, family room below grade |
| Rooms and square footage | Living 13.5 x 22 ft, 297 sq ft · dining 12 x 13.5 ft, 162 sq ft · hall 4 x 15 ft, 60 sq ft · main floor 519 sq ft · basement 17.5 x 23 ft, 402.5 sq ft |
| Product | Main floor: solid 3/4 in. oak plank, 5 in., prefinished, 20 sq ft a carton (sample) · basement: rigid core locking plank, 22.5 sq ft a carton (sample) |
| Waste factor and quantity | Oak: 5%, 544.95 sq ft, 28 cartons, 560 sq ft · rigid core: 10%, 442.75 sq ft, 20 cartons, 450 sq ft |
| Moisture tests | Wood meter, 6 locations: subfloor 9.4%, flooring 7.6%, difference 1.8% · calcium chloride, 3 kits: 3.6, 4.1 and 4.4 lbs. per 1,000 sq ft |
| Flatness | Main floor within 3/16 in. in 10 ft after renailing · basement: 5/16 in. dip over 10 ft at the foot of the stairs, filled with leveler |
| Exclusions | Basement laundry room, which has a floor drain · baseboard replacement · painting |
| Tax | New Jersey sales tax at 6.625% on the flooring and the installation |
| Required notice | FOR INFORMATION ABOUT CONTRACTORS AND THE CONTRACTORS' REGISTRATION ACT, CONTACT THE NEW JERSEY DEPARTMENT OF LAW AND PUBLIC SAFETY, DIVISION OF CONSUMER AFFAIRS AT 1-888-656-6225. |
| Payment terms | $3,777.17 at acceptance; balance of $8,813.41 on completion · check or card |
| Acceptance | Owners' signatures, date and the stain color chosen |
| Line | Quantity | Unit price | Line total |
|---|---|---|---|
| Remove carpet, pad, tack strip and staples, main floor | 519 sq ft | $0.85 | $441.15 |
| Remove carpet and pad, basement | 402.5 sq ft | $0.75 | $301.88 |
| Moisture readings, wood subfloor and flooring | 1 | $95.00 | $95.00 |
| Calcium chloride tests, basement slab | 3 | $85.00 | $255.00 |
| Renail subfloor at squeaks and sand the hall seam, main floor | 1 lot | $180.00 | $180.00 |
| Fill slab low spot with leveler | 40 sq ft | $6.50 | $260.00 |
| Solid oak plank, 5 in., prefinished | 560 sq ft | $7.40 | $4,144.00 |
| Install solid hardwood, nail-down | 519 sq ft | $4.25 | $2,205.75 |
| Rigid core locking plank | 450 sq ft | $3.60 | $1,620.00 |
| Install rigid core, floating, over 6 mil poly film | 402.5 sq ft | $2.70 | $1,086.75 |
| Quarter round, painted, main floor and basement | 215 lf | $3.25 | $698.75 |
| Reducer and T-moldings at doorways | 3 | $65.00 | $195.00 |
| Move furniture out and back | 1 | $150.00 | $150.00 |
| Haul away carpet and pad | 1 | $175.00 | $175.00 |
| Subtotal | $11,808.28 | ||
| New Jersey sales tax, 6.625% | $782.30 | ||
| Total | $12,590.58 |
The laundry room is an exclusion, not an omission. AHF's rigid core document lists "In rooms with sloping floors or floor drains" and "Existing resilient tile floors that are below grade" under its heading DO NOT INSTALL OVER, so the laundry's drain keeps it off the estimate. The estimator pulled back a corner of the family room carpet at the visit and found bare painted concrete; tile there would have changed the product or added a removal priced only after testing, since the same document warns that existing resilient flooring "may contain asbestos fibers and/or crystalline silica".
Square footage, cartons and moisture readings in the Montclair example
Square footage is length times width, room by room: 297, 162 and 60 square feet on the main floor, 519 in all, and 402.5 in the basement. The waste factor applies to each product separately. The oak's 5% gives 544.95 square feet, which rounds up to 28 cartons of 20, or 560; the rigid core's 10% gives 442.75, which rounds up to 20 cartons of 22.5, or 450. A single 10% figure for both floors would have ordered a 29th carton of oak.
The moisture rows are a pass or fail against the document, recorded with numbers. The subfloor reads 9.4% against the 12% ceiling, and the plank reads 7.6%, a difference of 1.8% against the 2% limit for plank. The three slab tests read 3.6, 4.1 and 4.4 against the 5-pound limit. Had any test failed, the estimate would have added mitigation or a delay, and the reading would stay on the job record either way.
New Jersey sales tax on floor covering and installation
New Jersey taxes the labor as well as the flooring. The Division of Taxation's bulletin for floor covering dealers treats the retail sale of floor covering as a taxable sale of tangible personal property, and states that "Charges for the installation of floor covering are subject to tax whether or not the installation results in a capital improvement." Hardwood flooring and "Click" laminate are both on its list. The installer pays sales tax on supplies used in the installation, among them underlayment, nails, staples and cement, and the bulletin gives the rate as 6.625% from January 1, 2018 (New Jersey Division of Taxation, Publication ANJ-5, Floor Covering Dealers & New Jersey Sales Tax, Rev. 12/17).
The example applies the rate to the whole subtotal: $11,808.28 at 6.625% is $782.30. The poly film and the leveler are supplies bought tax-paid and priced inside the installation lines, not resold as separate taxable items. The bulletin does not classify every preparation and trim line, and the example taxes those with the installation charge; a contractor whose scope includes separate carpentry or repair work reads the contractor bulletin it cross-references, Tax Topic Bulletin S&U-3.
New Jersey contractor registration lines on the estimate
Two rows come from the Contractors' Registration Act rules. A registered home improvement contractor places "The contractor's registration number on all advertisements distributed within this State" and "on business documents, contracts and correspondence with consumers of home improvement services in this State", and its commercial vehicles carry "HIC reg. #" and the number in lettering at least one inch high. Invoices, contracts and correspondence also carry the consumer notice printed in the sample header, in capital letters in at least 10-point boldface type (N.J.A.C. 13:45A-17.11, Cornell LII, amended effective January 17, 2012).
Flooring estimate steps, from room sketch to accepted price
- Sketch each room with its dimensions and floor level, and note the subfloor under each.
- Choose the product for each level from the manufacturer's grade-level rule.
- Compute each room's square footage, apply each product's waste factor, and round up to whole cartons.
- Take moisture readings by the method the instructions name, and record each result against its limit.
- Check flatness with a 10-foot straightedge and mark the areas to sand or fill.
- Price removal, preparation, flooring, installation, trim and haul-away as separate lines.
- Add the state's tax and the registration number and notice text.
- Before sending, confirm that cartons cover area plus waste for each product and that the lines add up to the total.
Flooring estimate, estimate template, business name generator and contractor profile
The flooring estimate is the general estimate template with a measurement page attached: square footage by room, waste by product and moisture readings by location. A company preparing its first estimates also needs the name on the header, and the flooring business name generator produces candidates to check against the state's business and contractor registries. The one-page profile that a flooring contractor hands a general contractor follows the plumbing business profile template: registration, insurance certificates, service area and references.
Estimating software and the moisture record
A paper estimate keeps the moisture readings on a separate sheet from the job and the invoice.
In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or built in FieldRanger and kept tied to the deal, and PandaDoc sends it for signature. The won deal becomes a job with its context carried over. A custom checklist on the work order holds the moisture and flatness readings, and before and after photos of the slab tests attach to the work order and sync to the customer's HubSpot record. Time is logged against each job, and the invoice is generated from the completed work order. The estimating software page describes the estimate on the deal.
Multi-day jobs are not built: the main floor and the basement days are separate jobs on the calendar, and each can carry the whole install crew. Square footage comes from the tape or a sketch, and the accepted estimate writes the HubSpot deal's line items and amount. The deposit in the payment terms goes out as a deposit invoice before the job, with the balance invoiced on completion.
Fill it in here, or download the spreadsheet
The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.
Frequently asked questions
What should a flooring estimate include?
The contractor and registration number, the property, each room's square footage, the product, the manufacturer's waste factor, cartons ordered, moisture tests and results, flatness readings, removal, subfloor preparation, installation method, trim and transitions, exclusions, tax, required notices, warranty, terms and acceptance.
What waste factor should a flooring estimate use?
The one in the product's installation instructions. AHF's Bruce solid hardwood instructions add 5% for a straight lay, 10% for diagonal and 10-15% for glue-down; its rigid core instructions add approximately 10%.
How is flooring square footage calculated for an estimate?
Multiply each room's length by its width, add the rooms that take the same product, apply that product's waste factor, and round up to whole cartons at the coverage printed on the carton.
Is flooring installation taxable in New Jersey?
Yes. Publication ANJ-5 states that charges for installing floor covering are taxable whether or not the installation results in a capital improvement, and the flooring itself is taxable as a retail sale.
What goes in a flooring contractor business profile template?
The one-page profile a flooring company gives a general contractor or property manager: legal name, registration or license numbers, insurance certificates, service area, crew capacity, products installed and references. The plumbing business profile template on fieldranger.ai sets out the same fields for a plumbing company.
The Ruiz basement slab and the January installation week
Estimate FL-2026-0147 carries three slab readings, all under 5 pounds, and a 5/16-inch dip that the leveler fills before the poly film goes down. The oak cartons arrive ahead of the January 11 week so the plank can meet the 2% moisture difference with the subfloor before nailing. The work order and invoice that follow are among the free field service templates; pricing lists per-technician plans, and Start free trial runs 14 days without a card.
FieldRanger runs field service inside HubSpot
Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.
Book a demo