Template

Free Painting Estimate Template:Every Field and a Filled 1954 Interior Repaint Example

Painting estimate template by room and surface: square feet, coats, gallons from Benjamin Moore spread rates, prep and EPA lead-safe lines for a 1954 house.

Updated 10 min read

Download .xlsxExcel spreadsheet · 14 KB · Free, no sign-upFill it in online

A painting estimate template prices a repaint by room and by surface: wall and ceiling square feet, trim by the linear foot, doors and windows by count, coats, gallons from the product's spread rate, prep, lead-safe work on homes built before 1978, exclusions and the price. The example prices four rooms of a 1954 house in Columbia, South Carolina.

The field list is one of the free field service templates kept by FieldRanger, the painting contractor software that runs inside HubSpot. Spread rates and coat counts come from Benjamin Moore's data sheets, and the lead-safe rows from EPA's March 2026 compliance guide, both cited below.

Painting estimate fields: rooms, surfaces, coats, gallons and lead status

The table lists the template's fields, and the page offers them as a free .xlsx download with no sign-up. Rooms run down the page; surfaces, coats and products run across.

Painting estimate template fields and what goes in each
FieldWhat goes in it
ContractorName, address, telephone, EPA lead-safe firm certification and the certified renovator assigned
Estimate number, date and expiryA unique number, the issue date and the date the price lapses
Customer and propertyName, address, year built, and whether the home is occupied during the work
Rooms and areasLength, width and height of each room; wall area less openings; ceiling area
TrimBaseboard in linear feet; doors and window casings by count
Products and sheensProduct line, sheen and color for walls, ceilings and trim
CoatsCoats per surface, and the reason: color change, bare patches, sheen change
Spread rate and gallonsThe data-sheet spread rate and the gallons of each product, rounded up per color
PrepPatching, caulking, sanding and priming, with the method for each
Lead statusTest method and result by component, or documentation that the paint is lead-free
Lead-safe linesContainment, cleaning and cleaning verification, waste handling
PamphletDate the EPA lead pamphlet was delivered and acknowledged
Labor and materialsLabor by surface or by room; gallons by product, and sundries
ExclusionsSurfaces and repairs not priced
Tax treatmentThe rate and amount, or the reason none is shown
Schedule, deposit and termsStart date, working days, deposit and balance
AcceptanceSignatures and the colors chosen

Square feet, coats and gallons from the data sheet

Wall area is perimeter times height, less 21 square feet for each door and 15 for each window in the example; ceiling area is length times width. Trim is priced as painted, baseboard by the foot and doors and casings by count, and converted to area only for the paint order.

Gallons are area times coats, divided by the spread rate, rounded up for each color. Benjamin Moore lists 400 to 450 square feet per gallon for three Regal Select sheens: Flat N547 (Benjamin Moore, Regal Select Flat N547 technical data sheet, dated December 16, 2020), Eggshell N549 (Benjamin Moore, Regal Select Eggshell N549 technical data sheet, dated April 4, 2023) and Semi-Gloss N551 (Benjamin Moore, Regal Select Semi-Gloss N551 technical data sheet, dated October 29, 2020). The example divides by 400, the low end, so the order does not run short on textured plaster.

Coat counts follow the same sheets. On bare substrates two coats are recommended; previously painted surfaces "can be finished with 1 or 2 coats", and Benjamin Moore recommends "two coats to achieve full color development". The walls change color, so they take two; the ceilings stay white and take one; the trim takes two to cover the scuffed old gloss. The eggshell sheet lists a recoat time of 1 to 2 hours and the semi-gloss 3 hours at 77 °F and 50 percent humidity, and none of the three may be applied below 50 °F, which sets the order of work in an unheated room.

Measurements and gallons by room and surface (example inputs)
Room or surfaceDimensions or countAreaCoatsProductGallons
Living room walls14 x 18 ft, 8 ft high, 2 doors, 3 windows425 sq ft2Eggshell N549, color A
Dining room walls12 x 12 ft, 2 doors, 2 windows312 sq ft2Eggshell N549, color A
Hall walls4 x 20 ft, 6 doors258 sq ft2Eggshell N549, color A995 x 2 / 400 = 4.98, order 5
Bedroom walls12 x 13 ft, 2 doors, 2 windows328 sq ft2Eggshell N549, color B1.64, order 2
Ceilings, four rooms632 sq ft1Flat N5471.58, order 2
Trim: 174 lf baseboard, 6 doors, 7 window casings450 sq ft2Semi-Gloss N5512.25, order 3

Filled painting estimate example: four-room interior repaint in Columbia, South Carolina

The owners of a 1954 house want the living room, dining room, hall and one bedroom repainted, with cracked plaster repaired and the trim refreshed. The certified renovator tested the paint at the walk-through. The business, customers and prices are illustrative.

Filled painting estimate, header and terms (example business, illustrative entries)
FieldExample entry
ContractorExample Painting Co. LLC, 1500 Example Street, Columbia, SC 29201 · 803-555-0164 · EPA lead-safe certified firm 000000 (example) · certified renovator Marcus Bell (example)
Estimate number, date and expiryPT-2026-0233 · November 12, 2026 · valid until January 11, 2027
Customer and propertyAlan and Ruth Whitlock, 1910 Sample Street, Columbia, SC 29205 · built 1954 · occupied during the work
Lead statusTested November 9, 2026 with EPA-recognized test kits: wall and ceiling plaster negative; baseboard, door and window casing paint positive
PamphletDelivered in person and acknowledged November 9, 2026
Products and colorsBenjamin Moore Regal Select: Eggshell N549 walls, Flat N547 ceilings, Semi-Gloss N551 trim; colors named at acceptance
ExclusionsClosets, exterior, window sashes, plaster that is loose from its lath beyond the six hours priced
Tax treatmentNone added: paint and supplies priced at tax-paid cost
Schedule, deposit and termsStart Wednesday, December 2, 2026 · six working days · $1,500.00 deposit · balance on completion by check or card
Filled painting estimate, line items (illustrative prices)
LineQuantityUnit priceLine total
Walls, two coats1,323 sq ft$1.35$1,786.05
Ceilings, one coat632 sq ft$0.85$537.20
Baseboard, hand-scuffed wet, two coats174 lf$2.25$391.50
Doors with casings, both faces, two coats6$95.00$570.00
Window casings and stools, two coats7$55.00$385.00
Plaster repair: knife off, prime, patch, prime6 hours$65.00$390.00
Regal Select Eggshell N5497 gal$72.00$504.00
Regal Select Flat N5472 gal$64.00$128.00
Regal Select Semi-Gloss N5513 gal$76.00$228.00
Sundries: tape, caulk, patching compound, primer, sponges1 lot$165.00$165.00
Lead testing, EPA-recognized kits6 components$20.00$120.00
Interior containment: floor sheeting, ducts and doors sealed4 rooms$85.00$340.00
HEPA vacuuming, wet cleaning and cleaning verification4 rooms$70.00$280.00
Lead-safe waste bagging and disposal1$60.00$60.00
Total$5,884.75

Had the trim also tested negative, the last three lines would drop and the total would read $5,204.75. The estimate shows both figures, so the owners see what the test result cost.

Lead-safe prep lines for a house built in 1954

The test results decide which lines appear. EPA states that paint testing is not required by the RRP rule, but that its requirements apply unless there is documentation that the paint is not lead-based; a certified renovator may declare components lead-free using an EPA-recognized test kit. Minor work is exempt when it disturbs "six square feet or less of paint per room inside, or 20 square feet or less on the exterior" (EPA, Renovation, Repair and Painting Program: Contractors, updated March 31, 2026). The plaster tested negative, so the plaster repair carries no lead-safe line. Scuffing 174 feet of baseboard, six doors and seven casings disturbs well over six square feet in every room, so the trim work is covered.

The covered work sets four lines. EPA's compliance guide requires the firm to "Close and cover all ducts opening in the work area with taped-down plastic sheeting" and to cover the floor "a minimum of six feet beyond the perimeter of surfaces undergoing renovation". It prohibits "Open-flame burning or torching of painted surfaces", power sanding without a shroud and HEPA attachment, and "Operating a heat gun on painted surfaces at temperatures above 1100 degrees Fahrenheit". After cleaning, the certified renovator wipes floors and sills with a wet disposable cloth and compares it with EPA's cleaning verification card (EPA, Small Entity Compliance Guide to Renovate Right, EPA-740-K-26-003, March 2026). The baseboard line therefore names its method, hand-scuffed wet, and the containment and cleaning lines are priced per room.

The guide also counts jobs "performed in the same room within the same 30 days" as one job, so trim cannot be split across visits to stay under six square feet. A pamphlet delivered in person is valid if the renovation "begins within 60 days", which the November 9 delivery and December 2 start satisfy, and records are kept for three years after completion.

South Carolina tax treatment of paint on a repaint

The tax row reads zero for a stated reason. South Carolina's Department of Revenue states that "A construction contractor is the user or consumer of everything he buys" and defines one as "a person or business making repairs, alterations, or additions to real property". The regulation it cites lists "paint" among building materials (South Carolina Department of Revenue, Sales and Use Tax Manual, Chapter 16: Construction Contractors, September 2025). The painting company pays tax when it buys the Regal Select, and the estimate prices the gallons at that tax-paid cost.

Painting estimate instructions from walk-through to signed estimate

  1. Measure each room's length, width and height, and count doors, windows and the baseboard run.
  2. Record the year built; on a pre-1978 home, test the components to be disturbed or treat them as lead-based.
  3. Compute wall, ceiling and trim areas, and set coats for each surface from the color change and the data sheet.
  4. Divide area times coats by the low end of the spread rate and round up per color.
  5. Price labor by surface, prep by the hour or by the repair, and lead-safe containment and cleaning by the room where covered work occurs.
  6. Add materials, sundries, exclusions, tax treatment, schedule, deposit and terms.
  7. Deliver the lead pamphlet and record the acknowledgement date.
  8. Check that the gallons ordered cover area times coats at the spread rate used and that the lines sum to the total.

Painting estimate and the general estimate template

The general estimate template carries the fields every trade shares. A painting estimate adds the rows that turn a room into a paint order: areas by surface, coats, spread rates and, on older homes, the lead status that adds or removes four lines.

Estimating software and the repaint estimate

On paper, the Whitlock estimate lives in a notebook of room dimensions, a test-kit log and a spreadsheet of gallons.

In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or in FieldRanger and kept tied to that deal, and PandaDoc sends it with the pamphlet acknowledgement for signature. FieldRanger fields map to HubSpot custom properties, so the year built can sit on the record. Skill-based assignment matches the job to a certified renovator, a custom checklist carries the containment and cleaning verification steps, and before and after photos attach to the work order. Paint checked out of a specific warehouse is logged against the job, and the invoice is generated from the completed work order. The estimating software page describes estimates on the deal.

The areas, gallons and lead-test results come from the estimator and the certified renovator, and the lines are priced from the price book of services, parts and rates.

Fill it in here, or download the spreadsheet

The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.

Frequently asked questions

What should a painting estimate include?

The contractor's lead-safe certification, estimate number and expiry, property and year built, wall, ceiling and trim areas, products, coats, spread rate and gallons, prep, lead status and lead-safe lines, labor, materials, exclusions, tax treatment, schedule and signatures.

How many gallons of paint does a room need?

Multiply the area by the number of coats and divide by the product's spread rate, then round up for each color. At 400 square feet per gallon, 995 square feet of wall at two coats needs 4.98 gallons, ordered as 5.

How many coats does a repaint need?

Benjamin Moore's Regal Select data sheets recommend two coats on bare substrates and allow one or two on previously painted surfaces, with two recommended for full color development.

Does a painting estimate for a house built before 1978 need lead-safe lines?

Where work disturbs more than six square feet of paint per room inside, or 20 square feet outside, and the paint is not documented as lead-free, EPA's RRP rule applies, and containment, cleaning verification and waste handling become priced lines.

Do painting contractors charge sales tax in South Carolina?

South Carolina treats a contractor making repairs or alterations to real property as the consumer of its materials, paint included, so tax is paid when the paint is bought and the estimate prices it at that cost.

Is there a free painting estimate template?

Yes. The page offers it as a free .xlsx download with no sign-up: a Template sheet with every field and the line items, and a Sample sheet with the filled Columbia repaint.

The Whitlock repaint record after December

The estimate's trim lines bind the crew to the method they priced: wet hand-scuffing inside sheeted rooms, no heat gun above 1100 °F, a verification card at the end of each room. The test log, the November 9 acknowledgement and the cleaning results stay in the company's files until December 2029, three years after completion. Other documents for the job are in the free field service templates hub; pricing lists FieldRanger's per-technician plans, with Start free trial covering 14 days and no card.