Template
Free Quote Template:Every Field and a Filled Electrical Example
Quote template with every field a price quote needs, a filled electrical panel upgrade example, field-by-field instructions and when estimating software fits.
A quote template is a fixed list of the fields a price quote must carry: who quotes, for whom, a quote number and expiry date, the scope and its exclusions, a price for each line, tax, the total, the deposit and a place to accept. The template below lists every field, then fills it in for an electrical job.
The field list is free and ungated, and it is one of the free field service templates published by FieldRanger, which makes field service software that runs inside HubSpot. A Word, Excel or Google Sheets copy can follow this field list without change: each field becomes a labeled box in a document or a cell on a quote sheet.
Quote template fields
The table lists the template's fields, and the page offers them as a free .xlsx download with no sign-up. Core fields belong on every quote; optional fields depend on the size of the job and the customer.
| Field | What goes in it | Core or optional |
|---|---|---|
| Business name | Legal or trading name of the business giving the quote | Core |
| Business contact | Street address, phone number and email | Core |
| License number | Contractor license number, where the trade or state asks for it | Optional |
| Document title | The word "Quote", so the document is not mistaken for an invoice | Core |
| Quote number | A unique number from one sequence, carried later onto the work order and the invoice | Core |
| Quote date | The date the quote is issued | Core |
| Valid until | The last date on which the quoted prices hold | Core |
| Prepared by | The person who priced the job, with a direct phone number | Optional |
| Prepared for | Customer name, billing address, email and phone | Core |
| Job site | The address where the work will be done | Core |
| Scope of work | What will be done, in enough detail that a second technician could price the same job | Core |
| Exclusions | What the price does not cover, such as wall repair or permit delays | Core |
| Line items | One row per labor charge, part or flat-rate service: description, quantity, unit price, line total | Core |
| Options | Add-ons priced separately, which the customer can accept or decline | Optional |
| Subtotal | The sum of the line totals | Core |
| Discount | Any offered reduction, as an amount | Optional |
| Sales tax | Rate and amount, under the rules of the state and locality of the job site | Core |
| Total | Subtotal less discount plus tax | Core |
| Deposit | The amount due on acceptance, as a figure and as a share of the total | Optional |
| Payment schedule | When the remaining balance is due, such as on completion | Core |
| Schedule | Estimated start date and how long the work will take | Optional |
| Terms | How changes to the scope are priced, and the warranty on parts and labor | Core |
| Acceptance | Customer signature, printed name and date | Core |
A price quote template and a sales quote template differ in their line items. A sales quote prices goods by quantity and unit price; a service quote template or job quote template prices labor, materials and the scope of work at one site. A quote form template presents the same fields as boxes to fill in, and a quote sheet template presents them as rows on one page. A sample quote template holds the fields filled in, as in the example below. A business quote template is the master copy with the business name, contact details and terms already entered, so each new quote starts from it.
Filled quote example: electrical panel upgrade in Billings, Montana
The example is an electrical job: a residential service panel upgraded from 100 amps to 200 amps in Billings, Montana. The business, the customer and the prices are illustrative, not market rates.
| Field | Example entry |
|---|---|
| Business name | Example Electric LLC |
| Business contact | 100 Example Street, Billings, MT 59101 · 406-555-0100 · quotes@example.com |
| License number | License 000000 (example) |
| Document title | Quote |
| Quote number | Q-2026-0219 |
| Quote date | November 12, 2026 |
| Valid until | December 12, 2026 |
| Prepared by | Sam Lee, estimator · 406-555-0101 |
| Prepared for | Jordan Park, 200 Sample Road, Billings, MT 59102 · jordan@example.com |
| Job site | Same as customer address |
| Scope of work | Replace the 100-amp main panel with a 200-amp main breaker panel; replace the meter base; move the existing 24 circuits to the new panel; label every circuit; coordinate the disconnect and reconnect with the utility; schedule the inspection |
| Exclusions | Drywall or paint repair around the panel; new circuits beyond the existing 24; delays caused by the utility's reconnect date |
| Deposit | $900.00 on acceptance (about 25% of the total) |
| Payment schedule | Balance due on completion and passed inspection |
| Schedule | Start within 10 working days of acceptance; one working day on site |
| Terms | Changes to the scope priced in writing before the work is done; one-year warranty on installation labor |
| Description | Quantity | Unit price | Line total |
|---|---|---|---|
| 200-amp main breaker panel | 1 | $640.00 | $640.00 |
| Meter base, 200 amps | 1 | $285.00 | $285.00 |
| Service entrance cable and fittings | 1 lot | $310.00 | $310.00 |
| Breakers transferred or replaced | 24 | $18.00 | $432.00 |
| Installation labor (hours) | 14 | $125.00 | $1,750.00 |
| Permit and inspection, passed through at cost | 1 | $180.00 | $180.00 |
| Subtotal | $3,597.00 | ||
| Sales tax | $0.00 | ||
| Total | $3,597.00 | ||
| Option: whole-home surge protector, installed | 1 | $295.00 | $295.00 if accepted |
The tax line is zero because of the job's location: the Montana Department of Revenue states that Montana does not have a general-use sales tax (revenue.mt.gov, General Sales Tax, checked November 2026). In a state that taxes materials, labor or both, the same line carries the rate and the amount. The option sits below the total, so the customer sees the base price first and the add-on as a separate decision.
Quote template instructions: field by field
The order below follows the order in which the estimator learns the job, and it ends with a check.
- Fill in the business name, contact details and license number once, and keep them in the master copy.
- Assign the next quote number, and set the valid-until date. Material prices move, so the expiry protects the business from honoring an old price.
- Enter the customer and the job site from the site visit or the phone call, spelled as they will appear on the invoice.
- Write the scope as the list of tasks the technician will perform, then write the exclusions. Work that appears in neither list has no agreed price.
- Price each line. Labor is estimated hours times the hourly rate; materials are quantity times unit price; a flat-rate job is one line at the set price.
- Put optional work on separate lines below the total, each with its own price.
- Add the subtotal, apply any discount and sales tax, and state the total.
- Set the deposit and the payment schedule, and give an estimated start date.
- State the terms for changes and the warranty, and leave space for the customer's signature, printed name and date.
- Check the arithmetic and read the scope once against the line items: every task in the scope has a price, and every price belongs to a task.
An accepted quote carries forward. Its number goes on the work order, and its line items become the starting point for the invoice, as on the free invoice template page.
Quotes, estimates, bids and requests for quote
A quote states a price for defined work, valid until a stated date. An estimate states an approximate price that can change once the work is under way. A bid is a quote submitted in competition with other contractors, against a buyer's specification. A proposal adds a description of approach, schedule and qualifications to the price.
A request for quote template serves the other side of the transaction: it is the buyer's document, asking suppliers or contractors to quote against one specification. A construction quote template extends the fields on this page for longer projects, with phases, allowances and progress payments in place of one payment on completion.
Quote template formats: Word, Excel and Google Sheets
A quote template in Word lays out the scope and terms as text, and the line totals must be calculated by hand. An Excel quote template or a Google Sheets copy computes line totals, the subtotal, tax and the deposit with formulas. A PDF fixes the layout, so the customer signs exactly what was sent.
Estimating software and the quote template
A quote template records a price; it does not connect that price to the sale or to the job that follows. When the quote is accepted, the office retypes the customer, the scope and the price into a schedule, a work order and later an invoice.
In FieldRanger, an estimate is built from the HubSpot deal or contact record without leaving HubSpot, or built in FieldRanger and kept tied to the HubSpot deal it belongs to. When the deal is won, it becomes a job with its context carried over, and the job status shows on the HubSpot deal record. The estimating software page describes the sequence from a new lead to a scheduled job.
A template is enough for an owner who prices a few jobs a week and tracks them in one list. Software earns its place when several people quote, follow up and schedule the same customers.
Fill it in here, or download the spreadsheet
The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.
Frequently asked questions
What should a quote include?
The business details, a quote number, the quote date and an expiry date, the customer and job site, the scope of work and its exclusions, one line per charge, the subtotal, tax, the total, the deposit and payment schedule, the terms for changes and a place for the customer to accept.
Is there a free quote template for Word or Excel?
The page offers a free .xlsx download with no sign-up, which opens in Excel or Google Sheets: a Template sheet with every field and the line items, and a Sample sheet with the filled Billings quote. A Word copy can follow the same fields as labeled boxes.
What is the difference between a quote and an estimate?
A quote states a price for defined work, valid until a stated date. An estimate states an approximate price that can change as the work proceeds. Both carry the same fields; the quote adds an expiry date and an acceptance signature.
How long should a quote be valid?
The quote states its own validity period in the valid-until field. The example on this page uses 30 days. A shorter period suits jobs whose material prices move quickly.
How to write a job quote?
Visit or describe the site, write the scope as a list of tasks, write the exclusions, price each task as labor and materials, add tax, set the deposit and expiry date, and leave space for the customer's signature.
The quote as the first record of the job
The electrical quote above sets the scope, the price and the deposit that the work order and the invoice later repeat, and the other documents in that chain are in the free field service templates hub. An estimate built on the HubSpot deal keeps that scope and price attached to the sale, and the won deal becomes the job. The plans, priced per technician, are on FieldRanger pricing; Start free trial needs no card for its 14 days.
FieldRanger runs field service inside HubSpot
Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.
Book a demo