Guide
How to Price a Painting Job:Measuring Walls and Gables, Data-Sheet Coverage, Production Rates, Loaded Labor, Prep, Overhead and Target Margin
How to price a painting job: measure walls and gables, buy paint from data-sheet coverage, set hours from production rates, then add labor, overhead and margin.
How to price a painting job, in order: measure the paintable area of each surface, convert it to gallons with the paint maker's coverage figure, and convert it to hours with a production rate. Price those hours at a loaded labor rate, add prep, materials and overhead, then set the price from a target margin rather than a markup.
A painting price goes wrong before the first coat. A house measured as perimeter times ridge height carries wall area it does not have, and the bid loses on price. A published application rate is used as the crew's whole rate, and the job runs a day over with no hours priced for masking. A 25 percent markup is applied where a 25 percent margin was meant, and a quarter of the planned profit never appears. FieldRanger makes painting contractor software that runs inside HubSpot, and this page is one of its pricing and quoting guides. It separates the estimate, the quote and the bid. It then measures walls and gables, reads coverage from Dunn-Edwards data sheets and production rates from a federal coatings handbook, and builds a loaded labor rate from Reno wage data. Prep, overhead and margin follow, then a priced exterior repaint in Reno, Nevada, the contents of a house painting bid, the pricing errors and a checklist.
Four terms carry the page. Coverage, or spread rate, is the area one gallon covers in one coat at the film thickness the maker recommends. A production rate is the area, or the linear feet of trim, one painter finishes in an hour. A loaded labor rate is the wage plus payroll taxes, insurance and benefits, spread over the hours that produce work. Margin is profit as a share of the price; markup is profit as a share of cost.
Painting estimates, quotes and bids compared
The three words name one price at three levels of commitment. An estimate states the expected price for the scope as seen on the walk-through, and it may move if hidden rot or failed stucco appears. A quote is a fixed price for a written scope, valid until a stated date. A bid is a quote submitted against someone else's specification and deadline, beside competing bids.
| Document | Price commitment | Scope written by | Typical buyer |
|---|---|---|---|
| Estimate | Expected price; may change with hidden conditions | The painting company | Homeowner deciding whether to proceed |
| Quote | Fixed price until a stated date | The painting company | Homeowner ready to book |
| Bid | Fixed price against a specification | The general contractor, owner or property manager | Builder, owner or association comparing painters |
How to quote a painting job therefore follows the method on this page and then fixes the price, the scope and the expiry date in writing. How to bid a painting job adds one step: the measurements and product list come from the specification. Any substitution, such as a different product line, is stated as an alternate with its own price. The fields of the written estimate itself are laid out on the painting estimate template; this page covers how the numbers inside it are produced.
Measurement of walls, gables and openings
Area is measured surface by surface, because each surface takes a different product and rate. Walls are measured as rectangles to the eave, gable ends as triangles above the eave line, and window and door openings are subtracted. Trim is measured in linear feet and converted to area only where a gallon count is needed.
Dunn-Edwards' homeowner guide uses a shorter method. It multiplies the perimeter of the house by its height, taking "the highest point" where wall heights differ, subtracts doors and windows, then divides by 400 square feet a gallon and doubles for two coats (Dunn-Edwards, exterior painting guide, uploaded March 2026). For a homeowner buying paint, the method errs toward too much. On a house with gables it counts the triangle above each eave as a full rectangle. It also adds the ridge height to the long walls, which stop at the eave.
The sample house on this page shows the size of the gap. Its long walls are 52 feet, its gable walls 30 feet, the eaves 9 feet up and the ridge 7.5 feet above the eaves. Measured surface by surface, the body is 1,382 square feet. Measured by perimeter times the highest point, it is 2,387 square feet, or 72.7 percent more. A price built on the second figure carries paint and hours for 1,005 square feet that do not exist.
Coverage on the Dunn-Edwards EVERSHIELD data sheets
Gallons come from the coverage figure on the product data sheet, not from the can label or a rule of thumb. Dunn-Edwards states coverage per coat "at recommended dry film thickness", and the range depends "on surface conditions and application techniques".
| Product | Coverage per gallon per coat | Recoat time at 77 °F | Data sheet revision |
|---|---|---|---|
| [EVERSHIELD Flat, EVSH10](https://www.dunnedwards.com/wp-content/uploads/2015/01/EVSH10-EN-PDS-1024.pdf) | 400 to 475 sq ft | 2 to 4 hours | 08/24 |
| [EVERSHIELD Velvet, EVSH20](https://dunnedwards.com/wp-content/uploads/2015/01/EN-EVSH20-PDS.pdf) | 350 to 400 sq ft | 4 to 6 hours | 07/21 |
| [EVERSHIELD Semi-Gloss, EVSH50](https://dunnedwards.com/wp-content/uploads/2015/01/EN-EVSH50-PDS.pdf) | 350 to 400 sq ft | 6 to 8 hours | 07/21 |
Two findings follow from the sheets. The homeowner guide divides by 400, yet states that EVERSHIELD's spread rate is 350 to 400 square feet a gallon. It therefore prices velvet and semi-gloss at the top of their range. An estimate uses the low end for the sheen being sold. On rough stucco it adds a texture allowance, since the sheet treats texture as a surface condition and gives no separate figure. The flat sheet also sets application limits that move an exterior schedule, and with it the price. It bars application below 35 °F air or surface temperature, or when temperatures may fall below 35 °F within 48 hours, and states that "standard latex primers cannot be used below 50ºF".
The gallon formula is area times coats, divided by coverage, rounded up by package size. Package size changes the materials line. Dunn-Edwards' shop lists EVERSHIELD Flat at $89.50 a gallon, and EVERSHIELD Semi-Gloss at $96.50 a gallon and $27.00 a quart, in Swiss Coffee (Dunn-Edwards shop, EVERSHIELD exterior, read November 13, 2026). A need of 1.41 gallons is met by one gallon and two quarts for $150.50, not two gallons for $193.00.
Production rates: published application rates and measured rates
The one public production table found for this page is a federal one. The 2004 edition of the Unified Facilities Criteria coatings handbook lists "approximate rates of application by one painter of the same paint to flat areas", taken from SSPC Good Painting Practice (UFC 3-190-06, Protective Coatings and Paints, Table 10, January 16, 2004, archived by WBDG). A 2021 edition superseded it and drops the table.
| Method | Square feet per 8-hour day | Square feet per hour (divided by 8) |
|---|---|---|
| Brush | 800 to 1,400 | 100 to 175 |
| Roller | 2,000 to 4,000 | 250 to 500 |
| Air spray | 4,000 to 8,000 | 500 to 1,000 |
| Airless spray | 8,000 to 12,000 | 1,000 to 1,500 |
The table measures paint going onto a flat surface. It does not count cutting in at corners and openings, masking, moving ladders, or the half hour of setup and cleanup at each end of a day. The sample below shows the size of that gap on one house. The rate a company prices with is therefore its own: clocked hours divided by area, for each surface type. The handbook figure serves as a ceiling the measured rate should sit below. In the sample, the company's measured rate for rolling and brushing stucco is 160 square feet per coat-hour (sample), against the handbook's 250 to 500 for rolling alone.
A measured rate needs three records from past jobs: the area of each surface, the hours logged against it, and the conditions, such as stucco or lap siding. Ten jobs of the same kind give a figure the estimator can defend; one job gives an anecdote.
Loaded labor rate for a Reno painter
The rate starts from the wage. Construction and maintenance painters in the Reno metro earned a median of $25.99 an hour in BLS 2025 wage data (O\*NET OnLine, Nevada wages for 47-2141.00, read November 13, 2026). The 75th percentile was $28.32. The employer adds 6.2 percent Social Security and 1.45 percent Medicare on wages, with a 2026 Social Security wage base of $184,500 (IRS Topic 751, read November 13, 2026).
| Line | Basis | Amount |
|---|---|---|
| Wage | Reno median, 47-2141 | $25.99 an hour |
| Payroll taxes | 7.65% of wages | $1.99 an hour |
| Workers' compensation and benefits (sample) | 18% of wages | $4.68 an hour |
| Loaded wage | Sum of the three lines | $32.66 an hour |
| Productive share (sample) | 1,560 hours on walls of 2,080 paid | 75% |
| Labor cost per productive hour | $32.66 × 2,080 ÷ 1,560 | $43.55 |
The quarter of paid hours that produce no wall area is drive time, estimate visits, rain and cold days, and shop time. A company that divides by 2,080 instead of its own productive hours prices every job a quarter short on labor.
Prep, materials and access lines
Prep is priced as its own hours, so the price follows the condition of the house. Dunn-Edwards' exterior guide lists the steps before the first coat. The surfaces are washed, loose paint is scraped and sanded, and "all voids, cracks and holes" are repaired. Joints and seams are caulked, bare surfaces primed, plants cut back and everything not being painted covered. Each step is a line with hours, so a house with heavy cracking costs more than one that needs a wash.
Materials beyond paint are sundries: caulk, patch, masking paper, plastic, tape, roller covers and brushes. A company prices them as a fixed allowance per job size or from its purchase records. The allowance stays on the cost sheet even when the customer sees one total.
Two conditions change the scope rather than the hours. On a house built before 1978, the Dunn-Edwards sheet warns that scraping or sanding "may release dust containing lead or asbestos". The lead-safe certification and work practices that follow are set out in how to start a painting business. On a second story or a steep site, ladders give way to planks or a lift, and the rental is priced for the days it is on site. The start-up side of equipping a crew for either case is the subject of how much does it cost to start a painting business.
Overhead recovery and target margin
Overhead is every cost that no single job incurs on its own: vehicles, insurance, equipment, the office, software, estimating time and marketing. It is recovered by charging it per productive hour, since hours are what a painting job consumes. Last year's overhead divided by last year's productive hours gives the rate; the sample uses $24.00 per productive hour (sample).
Margin is then set on the price, not the cost. The price is total cost divided by one minus the target margin. A 25 percent margin on $4,113.54 of cost gives $5,484.72. A 25 percent markup on the same cost gives $5,141.93, a 20 percent margin. The $342.79 between them is profit the owner believed was in the price.
| Markup on cost | Margin on price |
|---|---|
| 20% | 16.7% |
| 25% | 20.0% |
| 33.3% | 25.0% |
| 50% | 33.3% |
Sample exterior repaint priced in Reno, Nevada
The house is hypothetical: a single-story stucco ranch in Reno with a 52 by 30 foot footprint, 9-foot walls and two gable ends with a 7.5-foot rise. It has twelve 3 by 4 foot windows, an entry door, a 6 by 7 foot slider and a 16 by 7 foot garage door, and it was built after 1978. The body takes two coats of EVERSHIELD Flat after a color change; fascia, rakes and both doors take two coats of EVERSHIELD Semi-Gloss. Dimensions, task hours, the measured production rates, the texture allowance, sundries, the benefits rate, the productive share, overhead and the target margin are sample inputs. Wage, tax rates, coverage and paint prices come from the sources above.
| Surface | Calculation | Area |
|---|---|---|
| Walls to the eave | 164 ft perimeter × 9 ft | 1,476 sq ft |
| Gable triangles | 2 × ½ × 30 ft × 7.5 ft | 225 sq ft |
| Openings | 12 windows at 12 sq ft, door 21, slider 42, garage door 112 | −319 sq ft |
| Stucco body | Walls + gables − openings | 1,382 sq ft |
| Fascia and rakes | 104 ft fascia + 67.08 ft rakes = 171.08 linear ft, 8 in wide | 114.05 sq ft |
| Garage and entry doors | 112 + 21 | 133 sq ft |
| Line | Calculation | Cost |
|---|---|---|
| Body paint | 1,382 × 2 coats ÷ 400 = 6.91 gal, + 15% stucco allowance (sample) = 7.95, bought as 8 gal × $89.50 | $716.00 |
| Trim and door paint | 247.05 sq ft × 2 coats ÷ 350 = 1.41 gal, bought as 1 gal + 2 qt | $150.50 |
| Sundries (sample) | Caulk, patch, masking, plastic, covers | $185.00 |
| Materials | $1,051.50 |
| Task | Basis | Hours |
|---|---|---|
| Wash and dry | Sample | 3.00 |
| Patch stucco cracks, caulk openings | Sample | 5.00 |
| Mask openings and fixtures, cover ground | Sample | 4.50 |
| Body, two coats | 2,764 sq ft ÷ 160 sq ft an hour | 17.28 |
| Fascia and rakes, two coats | 342.16 linear ft ÷ 40 ft an hour | 8.55 |
| Garage and entry doors, two coats | Sample | 3.00 |
| Setup, cleanup, unmasking, final walk | Sample | 4.00 |
| Total | 45.33 |
| Line | Calculation | Amount |
|---|---|---|
| Labor | 45.33 hours × $43.55 | $1,974.12 |
| Overhead | 45.33 hours × $24.00 | $1,087.92 |
| Materials | From the materials table | $1,051.50 |
| Total cost | $4,113.54 | |
| Price | $4,113.54 ÷ 0.75 | $5,484.72 |
The price works out to $3.97 per square foot of stucco body. That figure is a check against the company's past jobs, not a pricing method, because it hides how much of the price is trim, doors and prep.
The two errors on this house. Priced from the homeowner guide's area, the body would carry 2,010 more square feet of coats. That is 12.56 more hours and six more gallons: $1,385.43 of cost and $1,847.24 of price. Priced at the handbook's low roller rate of 250 square feet an hour, the body would carry 11.06 hours instead of 17.28. The job would then land $560.21 under its target price before any weather delay.
Days on site. Two painters cover the 45.33 hours in three days of about 7.6 hours each, which is how the work is scheduled below.
House painting bid contents and exclusions
How to bid a house painting job comes down to what the written bid fixes. The price above becomes a bid when the document carries the scope it was built from, so that a competing bid can be compared surface for surface.
- Surfaces included, with the product line and sheen for each, and the number of coats.
- Prep included, stated as tasks: wash, scrape, patch, caulk, spot prime.
- Surfaces excluded, such as the roof vents, the deck or the interior of the garage door.
- Conditions that change the price, such as rot found behind trim, priced per linear foot or as a stated allowance.
- Lead status: the year the house was built, and the lead-safe lines if it predates 1978.
- Schedule limits, including the data sheet's temperature floor, and what happens on a rain day.
- Price, payment terms and the date the bid expires.
A bid that omits the coats or the product line cannot be compared with one that states them, and a comparison of totals alone favors the bid with the least in it.
Painting price errors and their mechanisms
| Symptom | Mechanism | Fix |
|---|---|---|
| Bid loses on price to similar companies | Area measured as perimeter × highest point, counting gables as rectangles | Measure walls to the eave and gables as triangles |
| Paint runs short on the second coat | Coverage taken from the top of the data sheet range | Use the low end for the sheen sold, plus a texture allowance |
| Job runs a day over | Application rate used as the production rate | Price from the company's clocked hours per surface |
| Labor cost on the job exceeds the estimate with no overtime | Wage divided over paid hours, not productive hours | Divide the loaded wage by productive hours |
| Profit is a quarter below plan | Target margin applied as a markup | Divide cost by one minus the margin |
| Change order disputes on old houses | Rot and lead conditions not stated on the bid | State conditions and their unit prices in writing |
Painting job pricing checklist
- Measure each surface separately: walls to the eave, gables as triangles, trim in linear feet, openings subtracted.
- Record the product and sheen for each surface and read its coverage from the current data sheet, using the low end of the range.
- Add a texture allowance for stucco or rough siding, and round gallons up by package size.
- Set hours from the company's measured production rate for each surface type, not from a published application rate.
- Price prep as tasks with hours: washing, scraping, patching, caulking, priming, masking.
- Price labor at the loaded wage divided by productive hours.
- Add overhead per productive hour from last year's records.
- Set the price as cost divided by one minus the target margin.
- Write the scope, exclusions, lead status, schedule limits and expiry date onto the quote or bid.
- Verify on completion: compare clocked hours by task and gallons used with the estimate, and update the production rate after every ten jobs of the same kind.
Painting job estimates, time logs and margins in FieldRanger
FieldRanger keeps the painting estimate on the HubSpot record the lead came in on. Estimates built in HubSpot let the estimator work from the HubSpot deal or contact record without leaving HubSpot. Estimates built in FieldRanger keep an estimate made in FieldRanger tied to the deal it belongs to. PandaDoc sends estimates and agreements for signature, and Won deals become jobs with their context carried over.
Each day on site is its own job, assigned to a technician. The Reno repaint is therefore a job for each painter on each of its three days, placed on the Drag-and-drop calendar, and a rain day is moved by dragging those jobs. Multi-day jobs are not built, so a repaint does not run as one job across days. Job-level time tracking logs clock-in and clock-out against each job. Materials tracking logs the paint and sundries used on each job. Those two records are what a measured production rate and a gallon check are built from. A company that measures rates by surface records the split on the job's checklist or notes.
Invoices from completed work orders produce the bill, Stripe takes payment in the field and QuickBooks syncs invoices and payments. Progress billing is not built. Revenue reports show job revenue and margin by customer or service type, which is where the 25 percent target is checked against the result. The estimate record is described on the estimating software page, and plans are on pricing, where Start free trial runs 14 days with no card.
Frequently asked questions
How to price a painting job?
Measure each surface, convert area to gallons with the paint maker's coverage figure, convert area to hours with the company's measured production rate, price the hours at a loaded labor rate, add prep, materials and overhead, and divide the total cost by one minus the target margin.
How to quote a painting job?
Build the price by the same method, then fix it in writing with the scope, products, coats, exclusions and an expiry date. A quote is a fixed price; an estimate is an expected price that may change with hidden conditions.
How to bid a painting job?
Take the measurements and products from the owner's or general contractor's specification, price them by the company's own rates, and state any substitution as an alternate with its own price, so the bid can be compared with others on the same scope.
How to bid a house painting job?
List every surface with its product, sheen and coats, the prep tasks, the exclusions, the lead status of the house, the schedule limits and the expiry date, so the homeowner can compare bids surface for surface rather than by total.
What production rate should a painting estimate use?
The company's own rate, measured as clocked hours over area for each surface type. Published figures such as the 250 to 500 square feet an hour for rolling in the 2004 federal coatings handbook cover application only and leave out masking, cutting in and setup.
On the Reno ranch the tape measure moved the price more than the paint did. Measured to the eave, with the gables as triangles, the walls kept $1,847.24 of area that does not exist out of a $5,484.72 price.