Guide
HVAC Flat Rate Pricing Guide:Price Book Inputs, Billable Labor Rate, Overhead Recovery, Parts Multipliers and a Sample Capacitor Replacement
HVAC flat rate pricing guide: price book rows from task time, a loaded labor rate, overhead recovery and parts multipliers, with a priced capacitor job.
An HVAC flat rate pricing guide sets one price per task, quoted before work starts, from four inputs: book time, a labor rate per billable hour, an overhead charge, and part cost times a multiplier. In the Atlanta sample below, built from a 2025 BLS wage and a supplier's listed part, a capacitor replacement books at $165.
A flat-rate book fails quietly. The technician's hour is priced from the wage alone, so benefits and payroll taxes come out of the margin. Overhead is spread over 2,080 paid hours when customers pay for far fewer. One markup applies to a $28 capacitor and a $1,000 motor alike, so small parts lose money and large ones lose sales. And the book's times are never checked against the times logged on real calls. FieldRanger sells HVAC software for companies whose customers sit in HubSpot, and this guide is one of the fieldranger.ai pricing and quoting guides. It defines the book and its task times, builds a billable labor rate from an Atlanta wage, compares two ways of recovering overhead, sets out a parts multiplier schedule, prices one task, and closes with after-hours rows, a checklist and the software question.
Four terms carry the method. A price book is the list of tasks a company sells at a fixed price, each with its book time, parts and price. Book time is the time a task is priced at, as distinct from the clock time any one call takes. A billable hour is an hour a customer pays for, out of all the hours a technician is paid. A parts multiplier is the factor applied to a part's cost to set its selling price, so a multiplier of 2.0 is a 100% markup and a 50% margin on the part.
HVAC flat rate pricing and the price book
Flat rate pricing moves the risk of time from the customer to the company. Under time and materials, the customer pays for the hours the technician spends; under a flat rate, the customer pays the book price whether the capacitor takes 20 minutes or 50. The company recovers its cost across many calls, so the book is priced from averages and corrected from logged times.
A row in the book carries six fields.
| Field | Content |
|---|---|
| Task code and name | One defined task, such as "Replace dual run capacitor, residential condenser" |
| Inclusions | What the price covers: power isolation, testing, removal of the old part |
| Book time | Hours at the billable labor rate |
| Parts | Part numbers or classes, each at cost |
| Multiplier | From the parts schedule |
| Price | Labor plus marked-up parts, rounded |
The book can live in HubSpot's product library. HubSpot states that flat-rate products can be created with any subscription, with a name, SKU, description, billing frequency and price, while tiered pricing requires Revenue Hub; the library sits under CRM > Products (HubSpot Knowledge Base, updated October 21, 2026). The HVAC flat rate pricing template page lays out the same row as fields.
Diagnosis is its own row. A diagnostic charge pays for finding the fault, and the repair row prices fixing it; a book that folds diagnosis into every repair overcharges the customer who already knows the capacitor has failed and undercharges the call that ends in no repair. System replacements sit outside the book altogether: they depend on load sizing, equipment and permits for one house, and are quoted per job, as the HVAC quote guide sets out.
Task time in an HVAC price book
Book time is the clock time a competent technician needs for the defined task, from arrival at the equipment to the customer's signature. It is not the fastest time anyone has achieved and not the time a new hire takes.
A capacitor replacement shows the components. The technician isolates power at the disconnect, opens the condenser panel, discharges and removes the failed capacitor, fits and wires the new one, restores power, and checks the motor amperage and the system's operation before writing up the call. Each step is part of the task. Travel and diagnosis are not, because the diagnostic row has already paid for them.
The first book times come from the owner's judgment; the corrected ones come from logged times. Once jobs are clocked against task codes, the median logged time for each task over a season replaces the first estimate. A median resists the one call where a seized fan motor turned a capacitor job into a motor job and doubled the clock. Tasks whose logged median sits more than a tenth above book time are re-priced first, because each call on them loses the difference.
Billable labor rate from the Atlanta wage
The labor rate per book hour starts from the wage and ends with the share of paid hours that customers pay for. The sample uses the Atlanta metropolitan area.
The median wage for heating, air conditioning and refrigeration mechanics and installers in Atlanta-Sandy Springs-Roswell was $28.35 an hour, against $29.33 nationally (BLS Occupational Employment and Wage Statistics, 2025 wage data, via O*NET OnLine, checked November 12, 2026). The national figure matches the BLS Occupational Outlook Handbook, which puts 2025 median pay at $29.33 an hour and counts 440,900 jobs (BLS Occupational Outlook Handbook, modified October 29, 2026).
The wage is not the cost. For private industry installation, maintenance and repair occupations, wages and salaries were 68.6% of total compensation in June 2026, with benefits making up the remaining 31.4% (BLS Employer Costs for Employee Compensation, Table 4, modified September 9, 2026). A paid hour at the Atlanta median therefore costs $28.35 ÷ 0.686 = $41.33.
The billable share then spreads that cost. In the sample, a technician paid for 2,080 hours a year bills 1,352 of them, or 65%; the rest is drive time, training, callbacks, warehouse time and the slack between seasons. Overhead is a sample $310,000 a year for a six-technician company, covering the office, dispatcher, trucks, insurance, software and marketing.
| Input | Basis | Amount |
|---|---|---|
| Median wage, Atlanta metro | BLS 2025 wage data | $28.35 |
| Loaded paid hour | $28.35 ÷ 0.686 | $41.33 |
| Compensation per billable hour | $41.33 × 2,080 ÷ 1,352 (sample 65% billable) | $63.58 |
| Overhead per billable hour | $310,000 ÷ 8,112 billable hours (sample: 6 × 1,352) | $38.22 |
| Cost per billable hour | $63.58 + $38.22 | $101.80 |
| Book labor rate at a 20% margin | $101.80 ÷ 0.80 (sample margin) | $127.25 |
The billable share moves every row at once. At 60% billable, or 1,248 hours, compensation per billable hour rises to $68.88 and overhead to $41.40, a cost of $110.28. A book priced at the 65% figure then under-recovers cost on every row by 7.7%, until the share is measured and the rate corrected.
Overhead recovery: per billable hour against percent of revenue
Overhead reaches the price in one of two ways, and the choice decides which jobs carry it.
Per billable hour. Overhead is divided by billable hours, as in the table above, and added to each hour of book time. A task that takes 0.6 hours carries 0.6 hours of overhead, whatever its parts cost. This follows the resource the overhead pays for: trucks, dispatch and the office are consumed by time on calls.
Percent of revenue. Overhead is taken as a share of last year's revenue, a sample 25% ($310,000 against $1,240,000), and each price is set so that 25% of it covers overhead. A task's overhead then rises with its price, and its price rises with its parts.
The two methods agree on a labor-heavy task and part company on an expensive part. The comparison uses the capacitor task priced in the next sections, and a sample task with the same 0.6 book hours and a $1,000 part, both at a 20% margin and with parts at cost so that only overhead differs.
| Task | Per billable hour: price | Overhead | Percent of revenue: price | Overhead |
|---|---|---|---|---|
| Capacitor, $28.25 part | $111.66 | $22.93 | $120.73 | $30.18 |
| Sample $1,000 part | $1,326.35 | $22.93 | $1,887.55 | $471.89 |
On the capacitor, the two prices sit $9.07 apart. On the $1,000 part, the percent-of-revenue method charges $471.89 of overhead to a job that uses the same 0.6 hours of truck and dispatch as the capacitor, and prices it $561.20 higher. A percent-of-revenue book therefore prices equipment-heavy repairs above a per-hour book by the whole overhead difference, while recovering only a few dollars more on short calls. The per-hour method keeps overhead with time, and the parts multiplier, set separately, decides what a part earns.
Parts multipliers in an HVAC price book
A parts multiplier converts the supplier's price into the book's part price. One multiplier for every part fails at both ends. At 1.5, a $28 capacitor earns $14.13 over cost while carrying the same stocking, handling and warranty work as any other part. At 3.0, a $1,000 motor sells at $3,000, a price customers compare and refuse.
A sliding schedule answers both ends. The schedule below is a sample policy, not a published standard.
| Part cost | Multiplier | Markup | Margin on the part |
|---|---|---|---|
| Under $50 | 3.0 | 200% | 66.7% |
| $50 to $249.99 | 2.25 | 125% | 55.6% |
| $250 to $999.99 | 1.75 | 75% | 42.9% |
| $1,000 and over | 1.4 | 40% | 28.6% |
Markup and margin are different numbers for the same part. Markup is the increase over cost; margin is the increase as a share of the selling price, which is 1 − 1 ÷ multiplier. An owner who reads a 2.0 multiplier as a 100% margin has overstated the part's contribution by half.
Part costs come from the supplier's current price, not last year's. A book row stores the part number and the cost date, so a price change at the supply house reaches the book on the next review instead of staying hidden in the margin. Refrigerant is its own line, priced per pound charged and recorded on the work order, because the amount varies by system and leak.
Dual run capacitor replacement in Atlanta: a priced sample task
The task is a like-for-like replacement of a failed dual run capacitor on a residential condenser in the Atlanta area, after a diagnostic visit has identified the fault. The book time, multiplier and rounding are sample inputs. The labor rate is built from the published wage above, and the part cost is a supplier's listed price.
The part is a round dual-section 30/5 MFD capacitor rated 370/440 VAC, listed at a sale price of $28.25 against a list price of $43.00 (Budget Heating, Capacitor Round Dual Section 30/5 MFD 370/440VAC, checked November 12, 2026). The replacement matches the failed part's microfarad ratings, at the same or a higher voltage rating.
| Line | Calculation | Amount |
|---|---|---|
| Labor | 0.6 book hours × $127.25 | $76.35 |
| Capacitor, 30/5 MFD 370/440 VAC | $28.25 × 3.0 multiplier (part under $50) | $84.75 |
| Calculated price | $76.35 + $84.75 | $161.10 |
| Book price | Rounded up to the nearest $5 | $165.00 |
| Cost of the task | 0.6 × $101.80 + $28.25 | $89.33 |
| Profit at the book price | $165.00 − $89.33 | $75.67 |
| Margin at the book price | $75.67 ÷ $165.00 | 45.9% |
The margin on this row is high because the part is cheap and its multiplier is 3.0: $56.50 of the profit is on the part. The row is still priced correctly, since a short task on a low-cost part carries the same paperwork, warranty exposure and truck stock cost as a longer one. A competitor quoting $120 on the same task has a lower cost per hour, a lower multiplier, a lower margin or a book time below 0.6 hours, and the book row shows which.
Logged time tests the row. If the median clocked time across a season's capacitor jobs is 0.9 hours rather than 0.6, the labor cost rises to 0.9 × $101.80 = $91.62, the task cost to $119.87, and the margin at $165 falls to 27.4%. The row is then re-timed at 0.9 hours and re-priced at $200, or the cause of the extra 18 minutes is found and fixed on the trucks.
After-hours and seasonal rows in an HVAC price book
Evening and weekend calls are a separate price column, and the premium has to be built from a cost, not from a feeling about inconvenience.
Federal overtime law sets one part of that cost and not another. The Department of Labor states that covered employees must receive overtime "for hours worked over 40 in a workweek" at time and a half. The FLSA "does not require overtime pay for work on Saturdays, Sundays, holidays, or regular days of rest" unless the weekly hours exceed 40 (U.S. Department of Labor, overtime pay, checked November 12, 2026). A Saturday call worked by a technician with 32 hours in the week therefore costs the regular rate under federal law, and the same call in a 50-hour week costs time and a half. State law and the company's own pay policy may add to either.
The BLS notes that technicians' schedules "may vary to include evening or weekend shifts" and that overtime comes during peak heating and cooling seasons (BLS Occupational Outlook Handbook). In the sample, compensation per billable hour at time and a half is $63.58 × 1.5 = $95.37. The cost per billable hour on overtime is then $95.37 + $38.22 = $133.59, and the book labor rate at a 20% margin becomes $166.99. Applying time and a half to the whole loaded cost overstates it slightly, since some benefits do not rise with hours worked. An after-hours column priced at 1.5 times the whole book price would instead multiply the part's price and the overhead as well, neither of which changes after 5 p.m.
Maintenance agreement members are another column. A member price is a discount taken from the margin, and an agreement program sets it on purpose; the agreement's economics are covered in the HVAC marketing guide. The visit itself is a book row too, with its inclusions listed from an HVAC maintenance checklist, so the technician performs and the customer pays for the same list.
HVAC flat rate price book checklist
- Define each task in one row, with its inclusions, and keep diagnosis and system replacement out of repair rows.
- Take the wage for the company's own metro area from BLS data, and load it by the BLS wage share of total compensation for the occupation group.
- Measure the billable share from last season's paid and billed hours, and divide compensation by it.
- Recover overhead per billable hour, from the year's overhead budget and total billable hours.
- Set a sliding parts multiplier schedule, and store each part's supplier cost and the date it was checked.
- Price refrigerant per pound charged, as its own line.
- Build the after-hours column from the overtime cost of labor only, not by multiplying the whole price.
- Round each price to the book's rounding rule and record the resulting margin on the row.
- Clock every job against its task code.
- Verify the book each season: compare each task's median logged time with its book time, and re-time and re-price every row more than a tenth over.
Price book rows on HubSpot records with FieldRanger
The check in the last item needs the clock times and the task codes in one place, and that is the part of a flat-rate book that software holds. FieldRanger logs time against each job as the technician clocks in and out, so the median time per task can be read from real calls rather than recalled. An estimate can be built from the HubSpot deal or contact record, or in FieldRanger and kept tied to the deal it belongs to, and it can go out for signature through PandaDoc.
A won deal becomes a job with its context carried over, and recurring job templates hold maintenance agreement visits. The invoice is generated from the completed work order, payment can be taken in the field through Stripe, and invoices and payments sync with QuickBooks. Revenue reports show job revenue and margin by customer or service type, which is where a capacitor row's 45.9% and a motor row's margin can be compared after a season. The estimating software page covers the estimate, and plans are listed on pricing, where Start free trial runs 14 days without a card.
Frequently asked questions
How to build an HVAC flat rate pricing guide?
Define each task with its inclusions and book time, price labor at a rate per billable hour that includes benefits and overhead, add each part at cost times a multiplier from a sliding schedule, and round. Then clock real jobs against task codes and correct book times from the logged medians each season.
What labor rate should an HVAC flat rate price book use?
One built from the local wage, loaded for benefits and divided by the billable share of paid hours, plus overhead per billable hour and a margin. From the Atlanta median of $28.35 an hour, a 68.6% wage share and a 65% billable share, the sample reaches $101.80 of cost and a book rate of $127.25 at a 20% margin.
How much should HVAC companies mark up parts?
No published standard sets it. A sliding schedule, with higher multipliers on low-cost parts and lower ones on expensive parts, keeps a $28 capacitor from losing money and a $1,000 motor from pricing out of reach; the sample schedule runs from 3.0 under $50 to 1.4 at $1,000 and over.
What is the difference between markup and margin on HVAC parts?
Markup is the increase over cost, and margin is that increase as a share of the selling price. A 2.0 multiplier is a 100% markup and a 50% margin.
How should after-hours HVAC calls be priced on a flat rate?
From the extra labor cost only. Federal law requires time and a half for hours over 40 in a workweek, not for weekends as such, so the after-hours labor rate reflects the overtime the company actually pays; parts and overhead do not change after hours.
Is flat rate pricing better than time and materials for HVAC?
Flat rate gives the customer a price before work starts and moves the risk of a slow job to the company, which recovers it across many calls. It works only when book times are corrected from logged times; time and materials suits work too variable to define as a task.
Eighteen minutes of clock time separate the capacitor row's 45.9% margin from 27.4%, and they appear in no BLS wage table or supplier listing; only the job log records them.
Run field service on HubSpot with FieldRanger
Estimates with e-signature, scheduling and dispatch, a technician mobile app and invoicing, synced to the HubSpot deals and contacts the business already keeps.
Book a demo