Concrete Scheduling Software:Concrete Scheduling in FieldRanger and HubSpot
Concrete scheduling software on HubSpot: FieldRanger books form, pour and finish crews and pump days, and moves pours for temperature limits and rain.
Concrete scheduling software places form days, pours, finishing crews, pump trucks and ready-mix deliveries on one calendar and reschedules them when the weather turns. FieldRanger schedules that work inside HubSpot: each stage is a job on a drag-and-drop calendar, jobs are matched to technicians by skill, and shared equipment is booked against its availability.
Scheduling is the part of concrete contractor software that answers to the weather. A driveway or a footing is several dated jobs in sequence: forms and base, rebar, an inspection where the permit calls for one, the pour, finishing and curing, then stripping, saw-cutting or sealing. The pour date anchors the rest. The ready-mix plant, the pump operator and the finishers all work to it.
The pour sequence as dated jobs
| Stage | Condition before it starts | FieldRanger record |
|---|---|---|
| Forms, base and grade | Access for the mixer truck; utilities marked | Job with an assigned technician, checklist and photos |
| Rebar and inspection hold | Forms set; inspector booked where the permit requires it | Photos of rebar and forms before the pour |
| Pour | Air and concrete temperatures inside the spec; plant order placed; pump booked | Job with an arrival window; batch tickets photographed |
| Finish | Pour under way; finishers on site | Skill-based assignment for stamped or exposed-aggregate work |
| Cure and protection | Curing method in place; blankets ready in cold weather | Checklist line for the curing method |
| Strip, saw-cut, seal | Required curing days complete | Follow-on job dated after the cure |
Multi-day jobs are not built in FieldRanger, so each stage is a separate job on the same customer and deal, with its own assigned crew, date and checklist. The estimator who sold the job sees each stage's status on the HubSpot deal. The yards, rebar and finish lines behind those jobs are priced on concrete estimating software.
Placing temperatures and cold-weather limits in a state DOT spec
Temperature limits are written into public specifications, and the Texas Department of Transportation's 2024 Standard Specifications show their form. Item 420 places Class C, F, H, K and SS concrete only when the concrete's own temperature at placement is between 50°F and 95°F, with the minimum raised to 60°F when slag cement is in the mix. It bars placing when the ambient temperature in the shade is below 40°F and falling, unless approved, and allows placing at 35°F and rising or above 40°F (TxDOT, 2024 Standard Specifications, Item 420, sections 4.7.1 and 4.7.11, checked November 12, 2026).
Protection then runs for three days. Formed concrete such as walls and piers is held at or above 40°F for 72 hours from placement, and concrete placed on or in the ground above 32°F for the same period, with covering, insulated forms or heat as needed. The same item bars placing when impending weather would impair the finished work, directs placement in early morning or at night, or a schedule change, when wind, humidity and temperature threaten the concrete, and allows work to continue in rain only with approval (TxDOT, Item 420, sections 4.7 and 4.7.11, checked November 12, 2026).
A private driveway answers to its own contract and the ready-mix supplier, not to TxDOT. The state text shows what such limits look like on paper, and why a pour date carries a forecast condition. FieldRanger takes in no weather data. The dispatcher reads the forecast, and a pour that fails its condition is dragged to a new date on the calendar.
Truck mixer discharge times and the ready-mix order
The plant's clock starts at batching. TxDOT's Item 421 requires discharge from a truck mixer to begin within set times after batching, and rejects concrete that has not begun to discharge in time.
| Fresh concrete temperature | Without Type B or D admixture | With Type B or D admixture |
|---|---|---|
| 90°F and above | 45 min | 75 min |
| 75°F to below 90°F | 60 min | 90 min |
| Below 75°F | 90 min | 120 min |
The times can be extended where slump loss testing shows the mix holds its slump (TxDOT, 2024 Standard Specifications, Item 421, section 4.6.2, checked November 12, 2026). On a hot afternoon a load batched at the plant has 45 minutes without a retarding admixture, so the forms, the crew and the pump are ready before the first truck leaves.
FieldRanger does not order from batch plants. The office calls the plant with the pour time, and the pour job carries an arrival window that the crew, the finishers and the pump work to. The batch tickets photographed on site record what arrived and when.
Curing days and the stage that follows
The next stage waits on curing days, and a curing day is defined by temperature. Under Item 420, a curing day is a calendar day on which the shade temperature stays above 50°F for at least 19 hours, or, on colder days, one on which every concrete surface is kept above 40°F for the full 24 hours. Concrete is cured for 4 consecutive days unless a listed option applies, such as form curing for 48 hours on vertical surfaces (TxDOT, Item 420, section 4.10, checked November 12, 2026).
A cold week therefore stretches the calendar. Four calendar days after a November pour may hold only two curing days, and the strip or saw-cut job moves with them. In FieldRanger that follow-on job is dated after the expected curing days, and conflict detection warns when the move collides with the technician's other work. FieldRanger does not count curing days; the crew records the curing method and the protection on the checklist, and the dispatcher dates the next job.
Pump trucks, finishers and equipment on pour day
A pour day ties four resources to one hour: the placing crew, the finishers, the pump and the tools. Skill-based assignment matches the pour to a finisher by expertise, so a stamped patio goes to a finisher who has stamped before. Capacity planning keeps a finisher from being promised to two pours that morning, and the multi-technician view shows every technician's day side by side. One job carries the whole placing crew, so the pour is a single job with every technician on it.
A pump the company owns is an equipment record with an availability calendar and its own maintenance schedule, which keeps two pours from claiming it on one day. OSHA requires pipe supports on pumping systems with discharge pipes to be designed for 100 percent overload, and compressed air hoses on the system to carry positive fail-safe joint connectors (29 CFR 1926.702(e), checked November 12, 2026). Those checks fit a job-specific checklist on the pour's work order. A pump hired from a pumping company is booked by phone and noted on the job, with its arrival set inside the pour's window.
Power trowels, screeds, vibrators and saws are checked out by QR code, and the usage history shows which crew had the trowel that came back damaged. The trucks that tow them appear on the live map.
Rain-outs and a moved pour
Rain moves a pour and everything tied to it. The dispatcher drags the pour to its new date, and conflict detection checks the assigned technician and the booked equipment against the new day. Bulk scheduling moves a full day of flatwork at once when a storm takes out several pours. Each assigned technician receives a push notification for the changed assignment, and a Twilio text gives the homeowner or superintendent the new date.
The plant and a hired pump are rebooked by phone. Each job's status shows on the HubSpot deal, and a job status change can trigger a HubSpot workflow that emails the builder once the pour is complete. HubSpot's sales pricing sets Starter at 50 workflows with restricted triggers and actions, and Professional at 300 (HubSpot, Sales Hub pricing, checked November 2026). Moving many jobs in one morning across trades is the subject of dispatch software, and the board's general functions are on scheduling and dispatch software.
A driveway replacement week on the FieldRanger calendar
- Monday: the demolition crew removes the old slab and hauls it off; its clock-ins record the address, and photos of the subgrade attach to the work order.
- Tuesday: forms and base go in, and the plate compactor is checked out to the job by QR code.
- Wednesday: the crew sets and photographs the rebar; the dispatcher reads Thursday's forecast against the cold-weather condition.
- Thursday: the pour job opens with an early arrival window, the office has called the plant with the time, the finishers are assigned by skill, and each batch ticket is photographed on arrival.
- Friday to Monday: curing, with blankets checked out from the warehouse if the nights turn cold and the curing method recorded on the checklist.
- The saw-cut and seal job is dated after the curing days, and the homeowner signs off on the phone at the final walk-around.
- The completed work orders generate their invoices, and the completions reach the HubSpot timeline.
Concrete scheduling limits in FieldRanger
- No weather feed; the dispatcher reads the forecast and moves the pour.
- No ordering from batch plants and no truck spacing; the office calls the plant.
- No multi-day jobs; each stage is its own job on the customer and deal.
- No maturity meter or concrete temperature data, and no automatic count of curing days.
- Plans are per technician on pricing, and the 14-day trial needs no card.
Frequently asked questions
What is concrete scheduling software?
Software that places form days, pours, finishers, pumps and equipment on one calendar and reschedules them for weather. FieldRanger runs that calendar inside HubSpot, with each stage as a job on the customer's deal and equipment booked against its availability.
What temperature is too cold to pour concrete?
The project specification decides. TxDOT's 2024 Item 420 bars placing when the shade temperature is below 40°F and falling, allows placing at 35°F and rising or above 40°F, and requires protection for 72 hours after placement.
How long can a concrete truck wait before pouring?
TxDOT's Item 421 sets the start of discharge at 45, 60 or 90 minutes after batching as the concrete warms from below 75°F to 90°F and above, or 75 to 120 minutes with a Type B or D admixture. Later loads are rejected unless testing supports an extension.
How long does concrete cure before the forms come off?
Under TxDOT's Item 420, concrete is cured for 4 consecutive curing days, and a curing day needs more than 19 hours above 50°F in the shade or protected surfaces above 40°F all day. Form curing for 48 hours is one listed option for vertical surfaces.
Can concrete scheduling software move pours for rain?
FieldRanger takes in no weather data, so the dispatcher drags a rained-out pour to a new date. Conflict detection checks the assigned technician and equipment, bulk scheduling moves a full day, and a Twilio text carries the new date to the customer.
Does concrete scheduling software book pump trucks?
In FieldRanger an owned pump is an equipment record with an availability calendar and maintenance schedule. A hired pump is booked with the pumping company and noted on the pour job.
A pour date in FieldRanger depends on two kinds of condition. The calendar can check the assigned technician, the pump and the trowels; it cannot check the temperature in the shade, which stays the dispatcher's call. The yards behind each pour are priced with concrete estimating software, the trade's other records live under concrete contractor software, and the per-technician plans on pricing open with a 14-day Start free trial and no card.