Template

Free Handyman Estimate Template:Every Field and a Filled Eight-Task Baton Rouge Example

Handyman estimate template that prices many small tasks on one page: flat and hourly lines, minimum charge, markup and Louisiana's $7,500 registration line.

Updated 9 min read

Download .xlsxExcel spreadsheet · 13 KB · Free, no sign-upFill it in online

A handyman estimate template prices a list of small repairs before the visit: each task with its pricing basis, a flat price or capped hours, materials at cost plus markup, the minimum charge, exclusions, the schedule, the project total against the state's registration threshold, and both signatures. The example prices eight tasks at a Baton Rouge house.

The field list is one of the free field service templates kept by FieldRanger, the handyman software that runs inside HubSpot. The estimate is a promise made before the work; the invoice that follows bills what was done against it. Its distinctive rows are the pricing basis on each task line and the threshold row, because the sum of eight small prices decides which license or registration a state requires.

Handyman estimate fields: task list, pricing basis, limits and acceptance

The table lists the template's fields, and the page offers them as a free .xlsx download with no sign-up. Each field holds one thing the customer agrees to before the handyman arrives.

Handyman estimate template fields and what goes in each
FieldWhat goes in it
BusinessName, address, telephone and email
Registration or licenseThe state registration or license number, or a statement that the project falls below the state threshold
Estimate number, date and expiryA unique number, the issue date and the date the prices lapse
Customer and propertyName, address, year built, access, pets
Task listEach task written as the finished result, one per line
Pricing basisFlat price from the price sheet, or hourly with estimated hours and a not-to-exceed figure
Labor rate and incrementThe hourly rate and the billing increment
Minimum chargeThe visit minimum and when it applies
MaterialsEstimated cost, the markup percentage and the priced amount per task; customer-supplied items named
AssumptionsWhat each price assumes, such as studs at the expected spacing
ExclusionsTasks not priced, and why: trade work, permit work, work that would pass a threshold
Added tasksHow a task added during the visit is priced and approved
ScheduleEstimated start and completion dates
Total and project totalThe estimate total, and the project total beside the state threshold
Sales taxThe rate and amount, or the reason none is shown
Payment termsDeposit, balance on completion and methods
AcceptanceSignatures and dates of both parties

Flat-rate, hourly and minimum-charge lines on one estimate

Three pricing bases sit side by side on a handyman estimate. A flat price suits a task whose time is known from repetition: re-hanging a door, replacing a lockset, re-anchoring a handrail. The price comes from the company's price sheet and does not move if the task runs long.

An hourly line suits a task whose time depends on what the handyman finds, such as drywall damage or old caulk that resists removal. The estimate states the estimated hours and a not-to-exceed figure, so the customer knows the ceiling before agreeing. The minimum charge covers the opposite case, a list so short that its labor would not pay for the drive. On an eight-task list the minimum does not apply, and the estimate says so.

Filled handyman estimate example: eight tasks at a Baton Rouge house

The owner of a 1988 house sent a list of repairs before listing it for sale. The walk-through added measurements and photos, and the estimate prices the list for one two-day visit. The business, customer and prices are illustrative.

Filled handyman estimate, header and terms (example business, illustrative entries)
FieldExample entry
BusinessExample Home Repair LLC, 4100 Example Avenue, Baton Rouge, LA 70808 · 225-555-0119 · office@example.com
Registration or licenseNo LSLBC registration held; project total $1,347.57, below the $7,500 home improvement threshold
Estimate number, date and expiryHE-2026-0517 · November 12, 2026 · valid until December 11, 2026
Customer and propertyDenise Fontenot, 2210 Sample Drive, Baton Rouge, LA 70810 · built 1988 · side gate code by text
Labor rate and increment$85.00 an hour, billed in quarter hours
Minimum charge$150.00 a visit; not applicable to this list
MaterialsCost plus 20%; mirror and towel bars supplied by the owner
AssumptionsHandrail brackets land on studs; drywall damage limited to the three marked areas
ExclusionsElectrical and plumbing work · exterior trim and sill replacement at 14 windows (owner's request), referred to a registered contractor: added to this list it would carry the project past $7,500
Added tasksPriced on the estimate's rates and approved in writing before work starts
ScheduleStart Thursday, November 19, 2026 · complete Friday, November 20, 2026
Sales taxNone: repairs to immovable property in Louisiana are not taxable
Payment termsDeposit $210.07 for materials at acceptance · balance on completion · card or check
AcceptanceOwner's and business's signatures and dates
Filled handyman estimate, task lines (illustrative prices)
TaskBasisLaborMaterialsLine total
Back fence: replace 8 rotted cedar pickets, re-fasten one railFlat$160.00$50.76$210.76
Hallway: patch 3 drywall areas, texture, prime, spot-paint with owner's paintHourly, 3.0 h est., not to exceed 3.5 h$255.00$46.32$301.32
Two interior doors: plane and re-hangFlat, $95.00 each$190.00$8.16$198.16
Hall bath: hang vanity mirror and two towel bars (owner-supplied)Flat$120.00$0.00$120.00
Back door: new weatherstripping and door sweepFlat$85.00$39.48$124.48
Kitchen backsplash joint and tub surround: re-caulkHourly, 1.5 h est., not to exceed 2.0 h$127.50$21.55$149.05
Stair handrail: re-anchor three brackets into studsFlat$90.00$17.64$107.64
Two damaged soffit vent covers: replaceFlat$110.00$26.16$136.16
Estimate total$1,137.50$210.07$1,347.57
Highest total if both hourly tasks reach their caps$1,432.57

The materials column is cost plus 20 percent: $175.06 of parts priced at $210.07. The highest-total row adds the two caps, half an hour each at $85, so the owner sees the worst case in writing.

Louisiana's $7,500 registration line and the signed estimate

Three rows in the example follow the Louisiana State Licensing Board for Contractors. The board states that "a contractor must be licensed or registered to bid, contract and/or perform work in the state of Louisiana", that home improvement registration is "Required for home improvement projects with a value exceeding $7,500", and that "All amounts include cost of materials and labor." It adds that "A Home Improvement contractor shall not perform any structural or roofing work" (LSLBC, Weathering the Storm, posted September 2025). The registration row therefore states the project total with materials included, and the exclusions row names the request that would have pushed the list over $7,500.

The same brochure tells owners to require "a written contract signed by both parties" that agrees "the estimated dates of start and completion of the project", "a description of the work to be performed" and the total to be paid, and to "Never pay a large downpayment". Those are the schedule, task list, total and acceptance rows, and the deposit is held to the materials.

The tax row rests on the Louisiana Department of Revenue: "Repairs and maintenance to immovable property, such as a residence, are not taxable." Repairs to movable property in the home are taxable, with "refrigerators, washing machines, dryers and furniture" as examples (Louisiana Department of Revenue, sales tax reform FAQ, checked November 2026). A wobbly dining chair added to the list would go on its own line with tax, separate from the fence and the doors.

Printable handyman estimate template layout

A printable handyman estimate template is the same field list laid out for one sheet of paper, used at the kitchen table during the walk-through. The header rows take the top third; the task table takes the middle, with columns for task, basis, labor, materials and line total; the exclusions, schedule, payment terms and two signature lines fill the bottom. The customer signs whichever copy is in hand, so the paper copy carries the expiry date and the not-to-exceed figures as fully as an emailed one.

Handyman estimate instructions from walk-through to signature

  1. Walk the list with the owner, photograph each task, and note the year built, access and any assumption a price depends on.
  2. Write each task as its finished result, and choose flat or hourly for each.
  3. Price flat tasks from the price sheet; for hourly tasks, enter estimated hours and a not-to-exceed figure.
  4. Price materials at cost plus the stated markup, and name items the owner will supply.
  5. Add the lines, compare the project total with the state threshold, and move any task that would cross it to the exclusions with a referral.
  6. State the minimum charge, the rule for added tasks, the tax treatment, the schedule and the deposit.
  7. Check that the line totals sum to the estimate total and that the highest-total row adds every cap, then sign and have the owner sign.

Handyman estimate, invoice and work order

Once signed, the estimate's eight tasks move onto the handyman work order template as a checklist, with the assumptions and exclusions carried to the job. The handyman invoice template bills the completed tasks at the estimate's prices and actual hours, inside the caps.

Estimating software and the handyman task list

A paper estimate is copied twice after signature: once onto the work order and once onto the invoice, with each copy a chance to drop a task.

In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or in FieldRanger, where it stays tied to the deal it belongs to. PandaDoc sends it for signature. Walk-through photos taken in the app sync to the owner's HubSpot record, the won deal becomes a job with its context carried over, and the tasks travel to the handyman as a job-specific checklist. Time logged against the job and materials logged per job feed revenue reports by customer or service type, which show whether the flat prices and the 20 percent markup hold. The estimating software page covers estimates on the HubSpot deal.

The flat prices come from the FieldRanger price book, which holds the services, parts and rates that estimates and invoices are built from. The $210.07 materials deposit goes out as a deposit invoice at acceptance, with the balance invoiced on completion. The markup, the not-to-exceed caps and the project total against the $7,500 line stay with the estimator.

Fill it in here, or download the spreadsheet

The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.

Frequently asked questions

What should a handyman estimate include?

The business and its registration status, estimate number, date and expiry, the customer and property, each task with its pricing basis, the labor rate, the minimum charge, materials with markup, assumptions, exclusions, the rule for added tasks, the schedule, the total against the state threshold, tax treatment, payment terms and both signatures.

How do handymen price small jobs on an estimate?

By a flat price for tasks with a known time, by the hour with estimated hours and a cap for tasks that depend on conditions, and by a visit minimum for short lists.

When does a handyman need a registration in Louisiana?

The Louisiana State Licensing Board for Contractors requires home improvement registration for projects valued over $7,500, counting materials and labor, and bars registered home improvement contractors from structural and roofing work.

Do handymen charge sales tax in Louisiana?

The Louisiana Department of Revenue states that repairs and maintenance to immovable property, such as a residence, are not taxable, while repairs to movable property such as appliances and furniture are.

What is the difference between a handyman estimate and a handyman invoice?

The estimate prices the task list before the visit and is signed by both parties. The invoice bills the tasks completed, at the estimate's prices and actual hours.

Is there a printable handyman estimate template?

The page offers a free .xlsx download with no sign-up: a Template sheet with every field and the task lines, and a Sample sheet with the filled estimate. Printed, it reads header at the top, task table in the middle, terms and signatures at the bottom.

The Fontenot estimate on the morning of November 19

Estimate HE-2026-0517 reaches the house as eight checklist items and two caps: 3.5 hours for the drywall and 2.0 for the caulk. If the owner adds the dining chair, it goes on a new taxed line; if she revives the window trim request, the referral stands, because $7,500 counts every task on the project. Work order and invoice forms for the same list are in the free field service templates hub, and FieldRanger's per-technician pricing page carries the Start free trial: 14 days, no card.

FieldRanger runs field service inside HubSpot

Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.

Book a demo