Template
Free Handyman Invoice Template:Every Field and a Filled Seven-Task Honolulu Example
Handyman invoice template for many small tasks on one bill: task lines, minimum charge, materials markup and Hawaii GET, filled for a seven-task Honolulu visit.
A handyman invoice template is the bill for a visit of many small tasks: one line per task with its time or flat price, the minimum charge, materials at cost plus markup, any tax passed on, the project total against the state's handyman limit, and the balance due. The example bills seven tasks at a Honolulu house.
The field list is one of the free field service templates kept by FieldRanger, the handyman software that runs inside HubSpot. A plumbing or electrical invoice bills work in one licensed trade. A handyman invoice bills unrelated tasks, each with its own labor and parts, and in Hawaii their sum is also the number a licensing exemption is read against.
Handyman invoice fields: task lines, minimum, markup and project total
The table lists every field, and the page offers the template as a free .xlsx download with no sign-up. A Word, Google Docs or spreadsheet copy follows it row for row, with the task lines and materials as two tables.
| Field | What goes in it |
|---|---|
| Business | Name, address, telephone, billing email, and the tax license number where tax is passed on |
| License status | The contractor license number, or the exemption the work falls under |
| Invoice number and dates | A unique number, the visit date, the invoice date and the due date |
| Customer and job site | The person billed, the billing address and the address of the work |
| Estimate or work order | The number of the estimate the customer accepted, or of the work order |
| Rate schedule | Hourly rate, billing increment, and any flat task prices used |
| Task lines | One line per task: what was done, hourly or flat, hours or price, line total |
| Minimum charge | The visit minimum, and whether it applied to this visit |
| Trip charge | A charge for travel, if the company uses one |
| Materials | Each item with quantity, cost, markup and billed price |
| Customer-supplied items | Items the customer bought, billed as labor only |
| Subtotal | Labor plus materials |
| Tax passed on | The rate and the amount, where the business passes a tax on |
| Project total to date | This invoice plus earlier invoices on the same project, beside the state limit |
| Total, paid and balance due | The total, payments received and the amount owed |
| Payment terms and methods | Due on receipt or a due date; card, bank payment or check |
| Workmanship warranty and notes | The period the labor is warranted, and anything the customer must do next |
| Customer signature | Acknowledgement that the listed tasks were completed |
Filled handyman invoice example: seven tasks at a house in Honolulu, Hawaii
The owners sent a list of seven repairs for one visit. The handyman billed time in quarter hours at one rate, checked materials out of stock, and passed the general excise tax on at the Oahu maximum. The business, customers and prices are illustrative.
| Field | Example entry |
|---|---|
| Business | Example Handyman Services LLC, 1200 Example Street, Honolulu, HI 96814 · 808-555-0172 · billing@example.com · GE license W00000000-01 (example) |
| License status | No contractor license held; project total under $1,500 and no permit required |
| Invoice number and dates | HM-2026-0844 · visit November 5, 2026 · invoiced November 5, 2026 · due on receipt |
| Customer and job site | Grace and Daniel Ito, 3300 Sample Place, Honolulu, HI 96822 · same address |
| Estimate or work order | Estimate HE-2026-0291, accepted October 29, 2026 · work order WO-2026-1530 |
| Rate schedule | $95.00 an hour in quarter hours · visit minimum $175.00 |
| Payment terms and methods | Paid by card on completion |
| Workmanship warranty and notes | Labor warranted 90 days · grab bars fixed to studs, rated load per the manufacturer's label |
| Customer signature | Grace Ito, November 5, 2026 |
| Task | Basis | Hours | Line total |
|---|---|---|---|
| Sliding screen door: replace two rollers, adjust track | Hourly | 0.75 | $71.25 |
| Hallway drywall: patch doorknob hole and three anchor holes, texture, prime | Hourly | 1.25 | $118.75 |
| Tub surround: remove failed caulk, re-caulk | Hourly | 1.00 | $95.00 |
| Bedroom closet bifold: replace track and pivots | Hourly | 0.75 | $71.25 |
| Shower: install two 24 in grab bars into studs | Hourly | 1.00 | $95.00 |
| Bathroom door: replace privacy lockset | Hourly | 0.50 | $47.50 |
| Hang a mirror and three framed pictures (customer-supplied) | Hourly | 0.50 | $47.50 |
| Labor, 5.75 hours | $546.25 | ||
| Visit minimum, $175.00 | Not applied: labor exceeds it | $0.00 |
| Item | Cost | Billed |
|---|---|---|
| Screen door rollers, 2 | $18.40 | $23.00 |
| Drywall patch kit, joint compound, primer | $26.00 | $32.50 |
| Tub and tile silicone caulk, 2 tubes | $19.96 | $24.95 |
| Bifold track and pivot kit | $34.80 | $43.50 |
| Grab bars, 24 in, 2 | $79.00 | $98.75 |
| Privacy lockset | $27.60 | $34.50 |
| Materials | $205.76 | $257.20 |
| Subtotal, labor and materials | $803.45 | |
| Hawaii general excise tax passed on, 4.712% | $37.86 | |
| Total | $841.31 | |
| Paid by card, November 5, 2026 | −$841.31 | |
| Balance due | $0.00 | |
| Project total to date, labor and materials | $803.45 of $1,500.00 |
The cost column stays on the company's copy. The customer's copy shows the billed column, and the invoice marked paid serves as the receipt.
Minimum charge, billing increment and materials markup
The three pricing rules on a handyman invoice act on different visits. The minimum charge decides a short visit: had the Itos booked only the lockset, half an hour at $95 would have come to $47.50, and the minimum line would have read "applied" at $175.00. On a seven-task visit the labor passes the minimum, and the line stays on the invoice at $0.00 so the policy is visible.
The billing increment decides each task line. Quarter hours round a 40-minute roller repair to 0.75 hours. A company that bills tenth hours or flat task prices changes the rate schedule row, and the task lines follow it.
The markup decides the materials. At 25 percent, $205.76 of cost becomes $257.20 billed, and the $51.44 between them pays for the trip to the supply house, the wrong part returned and the call-back when a part fails. The rate is a company policy, stated on the estimate before the visit, and items the customer supplies, like the mirror and pictures here, carry labor only.
Hawaii's $1,500 handyman limit and the general excise tax line
Two rows on the example follow Hawaii rules. The Regulated Industries Complaints Office states that a handyman may take a project whose total cost, "including labor and materials", is "not more than $1,500.00" and which "does not require a building permit". Without a license, handymen whose projects are "(1) over $1,500.00, or (2) require a building, electrical, or plumbing permit, are engaged in unlicensed contracting" (Hawaii DCCA, Regulated Industries Complaints Office, Hire a Licensed Contractor, revision 260123, posted April 2026). The project total row therefore adds labor and materials across every invoice on the same project. The handout counts labor and materials and does not mention the excise tax, so the row reads $803.45 before tax; a business close to the limit asks the Contractors License Board how a passed-on tax is counted.
The tax line follows the Department of Taxation. Hawaii has no sales tax. Its general excise tax "is assessed on all business activities", at 4% outside the lower wholesaling and insurance-commission rates, and "The tax is on the business and not on the customer"; a seller "may choose to visibly pass on" the tax and any county surcharge but "is not required to do so" (Hawaii Department of Taxation, General Excise Tax information, updated January 14, 2026). Honolulu's surcharge is 0.5% through December 31, 2030, and the maximum pass-on rate for the City and County of Honolulu is 4.7120% (Hawaii Department of Taxation, County Surcharge on General Excise and Use Tax, updated January 9, 2024).
The arithmetic shows how the maximum relates to the 4.5% combined rate: 0.045 divided by 0.955 is 0.04712. On the example, 4.712% of $803.45 is $37.86, and 4.5% of the $841.31 the customer pays is also $37.86.
Handyman invoice instructions from the checked task list to the receipt
- Copy the business, license status, customer and job site from the estimate or work order.
- Enter one line per completed task, with its basis and the hours from the time record or its flat price.
- Total the labor, compare it with the visit minimum, and record whether the minimum applied.
- List each material at cost and at billed price under the stated markup; list customer-supplied items as labor only.
- Add labor and materials into the subtotal and apply any tax the business passes on, at a rate no higher than the published maximum.
- Add this invoice to earlier invoices on the same project and compare the project total with the state's handyman limit.
- Record payments, the balance due and the customer's signature for the completed list.
- Check that the task lines match the work order's completed tasks and that the lines sum to the subtotal.
Handyman invoice, handyman estimate and handyman work order
The invoice is the last of three documents for one visit. The handyman estimate template prices the task list before the visit and states the minimum and the markup. The handyman work order template carries the list to the house as a checklist. The invoice bills only the tasks checked off on that work order, so a task added at the door appears on all three: as a revised estimate line, a new checklist item and a billed line.
Contractor invoicing software for a mixed-task visit
A paper invoice for the Itos is assembled from the estimate, the handyman's time notes, the stock sheet and the card receipt.
In FieldRanger, the seven tasks reach the handyman's phone as a job-specific checklist on the work order. Clock-ins and clock-outs record where the handyman was, with time logged against the job; the rollers, lockset and grab bars are checked out of a specific warehouse or the handyman's truck, each its own stock location; and before and after photos attach to the work order and sync to the customers' HubSpot record. The customer signs on site, the invoice is generated from the completed work order, payment is taken through Stripe, and the invoice and payment sync with QuickBooks. Revenue reports show job revenue and margin by customer or service type. The contractor invoicing software page describes the step from completed work order to payment.
The minimum and the marked-up prices sit in FieldRanger's price book of services, parts and rates, and the project total is read from the customer's HubSpot record of completed jobs.
Fill it in here, or download the spreadsheet
The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.
Frequently asked questions
What should a handyman invoice include?
The business and its tax license, license status or exemption, invoice number and dates, customer and job site, the estimate or work order, the rate schedule, one line per task, the minimum charge and whether it applied, materials with markup, any tax passed on, the project total to date, payments, the balance due and the customer's signature.
How does a handyman bill several small jobs on one invoice?
One line per task, each with its basis, hours or flat price and line total, then the labor total compared with the visit minimum and the materials listed apart.
Can a handyman charge a minimum fee?
A minimum charge is a company policy stated on the estimate. On the invoice it reads as applied when a visit's labor falls below it, and as not applied when labor exceeds it.
How much can a handyman charge without a license in Hawaii?
Hawaii's Regulated Industries Complaints Office states that a project of no more than $1,500, counting labor and materials, and needing no building permit may go to a handyman. Projects over $1,500, or needing a building, electrical or plumbing permit, need a licensed contractor.
Does a handyman in Hawaii charge general excise tax?
The general excise tax is on the business. A business may pass it on visibly, up to 4.712% in the City and County of Honolulu, but is not required to.
Is there a free handyman invoice template?
Yes. The page offers a free .xlsx download with no sign-up: a Template sheet with every field and the line items, and a Sample sheet with the filled Honolulu invoice.
The Ito project after invoice HM-2026-0844
The project total row now reads $803.45. If the Itos add lanai screens to the same project, the screens and any later tasks have $696.55 of room under the Hawaii limit, measured before tax. A task that needs a permit, whatever its price, goes to a licensed contractor instead. The estimate and work order forms for that next visit are in the free field service templates hub; FieldRanger is priced per technician on pricing, and Start free trial gives 14 days without a card.
FieldRanger runs field service inside HubSpot
Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.
Book a demo