What is utility locating: finding and marking buried lines before digging, through an 811 ticket and the APWA color code, with Florida's one-call time limits.

Updated 4 min read

Utility locating is the work of finding buried utility lines and marking their position on the ground before anyone digs, with paint, flags or stakes in a standard color for each kind of line. In the United States it starts with a call to 811, which notifies the operators of the lines near the dig site.

FieldRanger runs utility contractors' jobs inside HubSpot, as described under utility locating software, and this entry belongs to its field service glossary.

811 and the Florida one-call law

Dialing 811 reaches the state one-call center from anywhere in the country, and the center contacts the operators, who mark their lines at the site. PHMSA states that neither the call nor the marking costs the caller anything (PHMSA, 811 and one-call centers, checked November 2026). Each state sets its own clock.

Florida's clock is in Chapter 556 of the Florida Statutes. The excavator notifies the state system, Sunshine 811, at least 2 full business days before digging on land. Member operators mark within 2 full business days of the notice, or negotiate a new time with the excavator. The information on a ticket is valid for 30 calendar days after it is given (Fla. Stat. § 556.105, 2026 edition). The statute's tolerance zone extends 24 inches from either side of a marked line (Fla. Stat. § 556.102, 2026 edition).

APWA uniform color code for locate marks

The American Public Works Association assigns one color to each kind of facility, and its card asks that each mark carry the owner's name, initials or logo (APWA, Uniform Color Code, Rev. 4/99).

APWA uniform color code for temporary marking of underground facilities
ColorWhat the mark shows
WhiteProposed excavation
PinkTemporary survey markings
RedElectric power lines, cables, conduit and lighting cables
YellowGas, oil, steam, petroleum or gaseous materials
OrangeCommunication, alarm or signal lines, cables or conduit
BluePotable water
PurpleReclaimed water, irrigation and slurry lines
GreenSewers and drain lines

Where law sets no tolerance zone, the APWA card recommends the facility's width plus 18 inches on each side, dug by hand until the line is exposed. Florida sets 24 inches by statute.

A locate ticket for a fence in Tampa

In an illustration, a fence contractor in Tampa plans post holes along a back property line. The office files the 811 notice on a Monday. Tuesday and Wednesday are the two full business days, so the posts go in on Thursday at the earliest, and the ticket stays valid for 30 calendar days.

On Thursday, red, orange and blue marks run along the yard, but the irrigation line to the back fence carries none: member operators mark the lines they own and maintain. Sunshine 811 lists irrigation, landscape lighting and power to sheds among private facilities and advises a private locator for them (Sunshine 811, Private Facilities, checked November 2026).

In FieldRanger, a job-specific checklist on the work order can hold the ticket number and the earliest dig date, and photos attached to the work order keep a record of the marks. A pool contractor installing a heat pump pool heater faces two checks in one job: the 811 ticket before trenching, and the refrigerant readings in what is superheat after start-up.

Utility locating, private locating and subsurface utility engineering

Utility locating through 811 marks member operators' lines for one excavation, on a ticket that expires. Private locating marks the lines 811 does not cover, under a contract. A firm that sells either is a utility locating service, also called a utility locating company. Subsurface utility engineering maps utilities for a design, under ASCE/UESI/CI 38-22, at four quality levels, from records alone at QL-D to nondestructive exposure at QL-A (FHWA, Subsurface Utility Engineering, updated November 1, 2022). The words differ there: FHWA calls the surface geophysics of QL-B designating and the exposure of QL-A locating, while a one-call locate is a surface mark.

Frequently asked questions

What is utility locating?

Finding buried utility lines and marking their position on the ground before digging, with paint, flags or stakes in the APWA color for each kind of line. In the United States the request goes through 811.

Does 811 mark private lines?

No. Operators mark the lines they own and maintain. Private lines, such as irrigation, landscape lighting or power to a shed, are left to the property owner and a private locator.

What is a utility locating service?

A firm that sells utility locating: 811 locating, which marks member operators' lines for one excavation on a ticket that expires, or private locating, which marks the lines 811 does not cover under a contract. Such a firm is also called a utility locating company.

How long is a locate ticket valid in Florida?

The information given to the system is valid for 30 calendar days, under section 556.105 of the Florida Statutes.

The Thursday posts go in beside three colors of paint and one unmarked irrigation line, and the work order keeps both facts with the job. Utility contractors comparing plans will find them per technician on pricing, with Start free trial open for 14 days and no card.