Industry

Construction Time Tracking Software:GPS Time Tracking in FieldRanger and HubSpot

Construction time tracking software on HubSpot: located clock-ins and clock-outs log each worker's hours to the job, so job costs and invoices agree.

Updated 7 min read

Construction time tracking software records the hours each worker spends on each job, with the time and place of every clock-in and clock-out. FieldRanger logs those hours against jobs that start as won HubSpot deals. Each clock event records where the worker's phone was, so hours match the job sites where they were worked.

Time tracking is the payroll and job-costing record of general contractor software. The Bureau of Labor Statistics counts 1,674,400 construction laborer and helper jobs in 2025, notes that travel to jobsites may be required, and reports that cold weather can limit winter construction in northern climates (BLS Occupational Outlook Handbook, construction laborers and helpers, modified August 27, 2026). A crew that moves between a remodel, a punch list and the supply yard in one day produces hours that a single daily total cannot explain.

Yard time, drive time and site time

A construction day has three kinds of hours, and federal wage law treats them differently. Whatever the kind, the employer keeps each non-exempt worker's hours worked each day and total hours each workweek, and keeps time cards for two years (U.S. Department of Labor, Fact Sheet #21, revised July 2008).

Home-to-site travel at the start and end of the day is ordinary commuting. Travel during the day is not: the Department of Labor states that travel "from job site to job site during the workday, is work time and must be counted as hours worked" (U.S. Department of Labor, Fact Sheet #22, revised July 2008). Loading a trailer at the yard is work in itself; how the drive that follows is counted depends on the facts, and the fact sheet leaves that case to the regulations.

FieldRanger logs time against jobs. A worker clocks in on arrival at a site and out on leaving it, and each event carries a location. The interval between a clock-out at one site and a clock-in at the next belongs to no job, yet under the rule above it is still hours worked. The payroll record adds those intervals back in. The located clock events make the intervals easy to identify: a clock-out at a Main Street remodel at 11:40 and a clock-in at a basement finish across town at 12:15 mark 35 minutes of paid drive time.

Prevailing wage hours and certified payroll

Public works add a weekly reporting duty. On federal and federally assisted construction contracts, contractors submit payroll information every week. The Department of Labor's Form WH-347 is optional, but the data it collects is not: hours worked on the project each day as straight time and overtime, the labor classification "for the work actually performed by each worker", the hourly rate paid and fringe benefit contributions (U.S. Department of Labor, Form WH-347, OMB control number expiring January 31, 2028).

FieldRanger supplies the first column of that record: located clock-ins and clock-outs against the job, day by day, for each worker. It does not assign Davis-Bacon labor classifications, apply wage determinations, calculate overtime pay or produce Form WH-347. FieldRanger reports download as CSV or Excel, and the classification, rate and fringe columns are completed in the payroll or certified payroll system. A contractor whose work is largely prevailing wage should weigh a time clock built for certified payroll; the comparison below names one.

A remodel crew's week from won deal to final invoice

A basement finish shows where each record sits, from the signed contract to the last payment.

  1. The homeowner signs the estimate, which was built from the HubSpot deal record or in FieldRanger and tied to the deal. The deal is marked won, and FieldRanger creates the job with the deal's context carried over.
  2. The project manager places each day's job on the drag-and-drop calendar. Skill-based assignment matches each day's job to a technician by certification and expertise, so the electrical rough-in goes to the licensed electrician.
  3. The assigned technician opens the job in the FieldRanger mobile app. The digital work order carries the scope, the address and the instructions. The technician clocks in at the site, and the clock-in records where the phone was.
  4. Before drywall, the technician photographs the framing, the rough-in wiring and the plumbing. The before and after photos attach to the work order and sync to the customer's HubSpot record, which preserves what sits behind the finished walls.
  5. Lumber, drywall and fasteners are logged against the job for job costing. Materials checked out of a specific warehouse are counted where the stock actually sits.
  6. The deal record shows the job status as the work moves, and job completions, notes and updates are logged to the HubSpot timeline.
  7. At completion, the homeowner signs on site and the invoice is generated from the completed work order. Payment can be taken in the field through Stripe, and invoices and payments sync with QuickBooks.

The located hours from step 3 are the evidence for any time-and-materials change order. They also test the original price: the construction estimating software page covers how estimated hours compare with the hours each technician actually logged.

Located clock-ins on a construction site

A clock event records the phone's position, and a construction site is a difficult place to fix a position. GPS-enabled smartphones are accurate to within a 4.9 meter (16 foot) radius under open sky, and the accuracy worsens near buildings, bridges and trees (GPS.gov, GPS accuracy, checked November 2026). A clock-in inside a steel-framed building or a basement carries a wider error than one taken at the curb.

Three limits follow from the design:

  • Location is recorded at clock-in and clock-out only. FieldRanger does not trail a worker's position through the shift.
  • Each worker clocks in on a phone.
  • A location fix shows where the phone was, not the person. A phone left in the truck records the truck.

Vehicle position is a separate record from worker position. Trucks, trailers and the equipment they carry belong to construction fleet management software, which tracks each vehicle on a live map. Employee location recording is also subject to state notice and consent rules, so the employer should tell workers what the app records and when.

Construction time clock apps and FieldRanger compared

A construction time clock app and FieldRanger answer different questions. The time clock answers who worked, how long, on which cost code, for payroll. FieldRanger answers which customer's job the hours belong to, and keeps that job on the HubSpot deal that sold it.

Dedicated construction time apps are built around payroll. busybusy, for example, lets a supervisor "Clock in/out the entire crew or just an individual", assigns workers to cost codes, tracks equipment machine hours, can refuse a clock-in outside the project boundary, lists payroll integrations including QuickBooks, ADP and Paychex, and offers a free tier (busybusy, checked November 2026). A contractor whose payroll runs on cost codes, crew clock-ins or certified payroll is better served by a tool of that kind.

The deciding test for a contractor on HubSpot is where an hour has to land. If it belongs on a job, a customer and a deal, beside the photos, the materials and the invoice, FieldRanger keeps it there; if it belongs on a cost code in certified payroll, a dedicated construction time app keeps it better.

Frequently asked questions

What is construction time tracking software?

Software that records when each worker starts and stops work and on which job, and in some apps where. In FieldRanger, each clock-in and clock-out records the phone's location and logs the hours against a job that started as a won HubSpot deal.

Is drive time between job sites paid time?

Yes, for non-exempt workers. The Department of Labor treats travel from job site to job site during the workday as work time that must be counted as hours worked. Travel from home to the first site is ordinary commuting.

How do construction companies track employee hours?

With paper timecards, a time clock app or field service software. The record should show each worker's hours by day and by job, with overtime separated; federal recordkeeping rules require daily and weekly totals for non-exempt workers.

What is certified payroll in construction?

A weekly payroll report required on federal and federally assisted construction contracts. It lists each worker's daily hours, labor classification, rate and fringe benefits, and the Department of Labor's Form WH-347 is one optional format for it.

Is there a free construction timesheet app?

Yes. Some construction time clock apps list a free tier, such as busybusy. FieldRanger offers a 14-day free trial with no card required.

Does FieldRanger track workers' location all day?

No. FieldRanger records location at clock-in and clock-out, so hours match job sites. It does not record a continuous trail between those events.

Which time tracking app is best for construction?

It depends on what the hours feed. A crew paid by cost code or on prevailing wage work needs a construction time clock with crew clock-ins and payroll exports. A contractor who wants hours on jobs tied to HubSpot deals fits FieldRanger.

Hours in FieldRanger and the next estimate

Located hours on a job are the record that payroll, the invoice and the next bid all draw from: last month's hours per square foot become next month's labor line in construction estimating software, inside the wider workflow of general contractor software. Per-technician plans are listed on pricing, with a 14-day trial and no card.

FieldRanger runs field service inside HubSpot

Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.

Book a demo