Contractor Calculator:Job Price From Labor, Materials, Subcontractors, Equipment, Overhead, Margin and Permits
Contractor calculator for job pricing: a total from labor hours, materials, subcontractors and equipment at the contractor's overhead and margin, plus permits.
A contractor calculator for job pricing turns the costs of a job into a price. The calculator on this page adds the contractor's own labor, materials, subcontract work and equipment, applies overhead as a percentage, and divides by one minus the target margin. Permit fees are then added at cost; the total is before sales tax.
The calculator is free, needs no account and belongs to the free field service templates that FieldRanger, a field service app on HubSpot, publishes. Its defaults show the arithmetic; they are not market prices. Trade sizing tools sit beside it: the duct calculator sizes round ducts from airflow, and the HVAC calculator estimates cooling capacity in BTU per hour by a named rule of thumb.
Contractor pricing calculator formula
The contractor pricing calculator runs five steps:
- Labor cost = labor hours × loaded labor cost per hour.
- Direct cost = labor cost + materials + subcontractors + equipment.
- Overhead = direct cost × overhead %.
- Price = (direct cost + overhead) ÷ (1 − target margin %).
- Total = price + permit fees, passed through at cost.
In one line: total = (hours × loaded rate + materials + subcontractors + equipment) × (1 + overhead %) ÷ (1 − margin %) + permits.
Contractor calculator inputs
The last column shows the treatment of each cost: carried through overhead and margin, or passed through at cost.
| Input | Sample default | What it holds | Carries overhead and margin |
|---|---|---|---|
| Labor hours | 40 hours | The business's own labor hours on the job, added together | Yes |
| Loaded labor cost | $50 per hour | Wage plus payroll taxes, insurance and benefits | Yes |
| Materials | $4,000 | Materials at cost, delivery included | Yes |
| Subcontractors | $1,500 | Quoted subcontract work | Yes |
| Equipment | $300 | Rentals, dumpsters and disposal for this job | Yes |
| Permit fees | $250 | The permit authority's fees | No: billed at cost after the margin |
| Overhead | 12% of direct cost | Rent, vehicles, insurance, software and office time | Not applicable |
| Target margin | 18% of price | Profit as a share of the price | Not applicable |
Sample job: 40 labor hours, $4,000 of materials and a $1,500 subcontract
The sample is the calculator's own default job; every input is a sample.
| Line | Arithmetic | Result |
|---|---|---|
| Labor cost | 40 hours × $50 | $2,000.00 |
| Direct cost | $2,000 + $4,000 materials + $1,500 subcontractors + $300 equipment | $7,800.00 |
| Overhead | $7,800 × 12% | $936.00 |
| Price before permit fees | ($7,800 + $936) ÷ (1 − 0.18) | $10,653.66 |
| Profit | $10,653.66 − $8,736.00 | $1,917.66 |
| Permit fees | At cost | $250.00 |
| Total | $10,653.66 + $250.00 | $10,903.66 |
The calculator reports the profit as an 18% margin and a 21.95% markup on cost, which it displays rounded to 22%. Margin is the $1,917.66 as a share of the $10,653.66 price; markup is the same dollars as a share of the $8,736.00 cost. A contractor who adds 18% to cost earns less than an 18% margin. The contractor pricing guide converts margins to markups in a table and compares cost-plus with flat-rate and value pricing.
Subcontract billed at cost: $10,354.88 against $10,903.66
The calculator's default treats subcontract work as the contractor's cost, marked up like materials. A contractor that bills the subcontractor at cost instead moves the $1,500 into the permit field, which passes through unmarked. With every other sample input unchanged, the calculator then returns a price of $8,604.88 before pass-through costs and a total of $10,354.88. The difference, $548.78, is the overhead and margin the $1,500 subcontract carried in the default.
The choice is commercial. Marking up a subcontract pays for finding, scheduling and standing behind the subcontractor; billing it at cost leaves that work unpaid unless the overhead percentage already covers it. The general contractor pricing guides page shows where published cost books already include a subcontractor's own markup, so the general contractor's markup is not applied twice.
Contractor calculator scope: job pricing, not take-home pay
The calculator prices a job for a customer. It does not calculate a self-employed contractor's taxes or take-home pay. An owner-operator who works the job enters a loaded labor cost that includes self-employment tax, which the IRS sets at 12.4% for Social Security and 2.9% for Medicare, applied to 92.35% of net earnings from self-employment (IRS, Topic no. 554, last reviewed November 9, 2026). Licensing is outside the calculator too: whether the business may do the work at all, as an electrical contractor for example, is a question for the licensing authority.
Contract jobs, job days and invoices in FieldRanger
The calculator's total becomes an estimate in HubSpot or FieldRanger: built built from the HubSpot deal or contact record, or built in FieldRanger and tied to its deal. A won HubSpot deal becomes a job with its context carried over, and time is logged against each job, so the 40 priced hours can be checked against the hours worked. Revenue reports show job revenue and margin by customer or service type, and invoices and payments sync with QuickBooks.
Two limits matter for a job of this size. Multi-day jobs are not built: each day is its own FieldRanger job, so a week-long job is scheduled as one job per day. Progress billing and retainage are not built either, so a contract billed in stages is invoiced in stages outside FieldRanger.
Frequently asked questions
How do contractors calculate a job price?
Price the labor hours at a loaded labor cost, add materials, subcontractors and equipment, and add overhead as a percentage of that direct cost. Divide by one minus the target margin and add permit fees at cost. The sample job totals $10,903.66.
Should a contractor mark up subcontractors?
The calculator marks them up by default, with overhead and margin. Billed at cost instead, the sample's $1,500 subcontract lowers the total from $10,903.66 to $10,354.88.
What is the difference between an 18% margin and an 18% markup?
An 18% margin is profit as 18% of the price, which is a 21.95% markup on cost. An 18% markup on cost earns a margin below 18%.
Does the contractor calculator work out self-employment tax?
No. It prices jobs. Self-employment tax is 12.4% for Social Security and 2.9% for Medicare on 92.35% of net earnings, per the IRS, and an owner-operator includes it in the loaded labor cost entered.
One decision sets the sample's total before any arithmetic: whether the $1,500 subcontract carries margin, at $10,903.66, or passes through, at $10,354.88. The other trade calculators are on the free field service templates hub, beside the contractor pricing guide's wider methods. Plans are listed on pricing, and Start free trial runs 14 days without a card.