Calculator
Free Job Estimate Calculator:Job Price From Labor Hours, Materials, Direct Costs, Overhead and Margin
Free job estimate calculator for any trade: a job price from labor hours, loaded labor cost, materials, other direct costs, overhead and a target margin.
A free job estimate calculator prices a job from what it costs to do. The calculator on this page multiplies labor hours by a loaded labor cost, adds materials and other direct costs, applies overhead as a percentage, and divides by one minus the target margin. It returns the price before sales tax, with profit shown as margin and markup.
Any trade that prices by the hour and the material can use it. The calculator sits with FieldRanger's other free field service templates; FieldRanger is field service software that runs inside HubSpot. It asks for no sign-up, and none of its sample defaults is a market rate.
Job estimate calculator inputs for any trade
Six inputs set the price. The table separates what each one includes from what belongs elsewhere, because a cost entered twice is priced twice.
| Input | Sample default | Includes | Belongs elsewhere |
|---|---|---|---|
| Labor hours | 8 hours | Total person-hours on the job, travel included if it is billed | Office time, which is overhead |
| Loaded labor cost | $45 per hour | Wage plus payroll taxes, insurance and benefits | Profit, which comes from the margin |
| Materials | $350 | Materials at cost | Any markup on materials, which the margin replaces |
| Other direct costs | $50 | Equipment rental, disposal and other costs this job alone causes | Owned vehicles and tools, which are overhead |
| Overhead | 15% of direct cost | Rent, vehicles, insurance, software and office time | Costs already entered as direct |
| Target margin | 20% of price | Profit as a share of the price | A markup on cost |
Loaded labor cost: wage, employer payroll taxes and insurance
The loaded labor cost is the hourly wage plus what the employer pays on top of it, per labor hour. Federal payroll taxes are published rates. The employer pays 6.2% Social Security tax on wages up to $184,500 in 2026 and 1.45% Medicare tax with no wage base limit (IRS, Topic no. 751, last reviewed November 9, 2026). Federal unemployment tax is 6.0% of the first $7,000 of each employee's wages, or 0.6% after the full 5.4% credit for state unemployment tax paid on time (IRS, Topic no. 759, last reviewed November 9, 2026).
State unemployment tax, workers' compensation premiums and benefits come from the business's own notices, policy and payroll. The loaded cost per hour is the year's wages plus those taxes, premiums and benefits, divided by the hours the employee works on jobs. The calculator takes the result as one number, so a rate built this way is entered once and used on every estimate.
Direct cost and overhead: where each cost belongs
A direct cost exists because of this job: the hours worked on it, the materials installed and the dumpster rented for it. Overhead exists whether or not the job happens: the shop, the trucks, the insurance, the software and the time spent answering the phone. The calculator charges overhead as a percentage of direct cost, so a job with twice the direct cost carries twice the overhead. An owned truck entered as an "other direct cost" on every job, while its cost also sits in the overhead percentage, is charged to the customer twice.
Job estimate formula, step by step
- Labor cost = labor hours × loaded labor cost per hour.
- Direct cost = labor cost + materials + other direct costs.
- Overhead = direct cost × overhead %.
- Price = (direct cost + overhead) ÷ (1 − target margin %).
- Markup on cost = profit ÷ (direct cost + overhead), shown so the two percentages are not confused.
In one line: price = (hours × loaded rate + materials + other direct costs) × (1 + overhead %) ÷ (1 − margin %).
Sample job: eight labor hours and $350 of materials
The sample is the calculator's own default job, in no particular trade. Every input is a sample.
| Line | Arithmetic | Result |
|---|---|---|
| Labor cost | 8 hours × $45 | $360.00 |
| Materials | Entered at cost | $350.00 |
| Other direct costs | Entered | $50.00 |
| Direct cost | $360.00 + $350.00 + $50.00 | $760.00 |
| Overhead | $760.00 × 15% | $114.00 |
| Direct cost plus overhead | $760.00 + $114.00 | $874.00 |
| Price | $874.00 ÷ (1 − 0.20) | $1,092.50 |
| Profit | $1,092.50 − $874.00 | $218.50 |
Reading the result: price, profit and markup on cost
The calculator shows the profit as "$218.50 (20% margin, 25% markup on cost)". The margin is the $218.50 as a share of the $1,092.50 price. The markup is the same $218.50 as a share of the $874.00 cost. A job priced at cost × 1.20 is a 20% markup, and it earns less than a 20% margin. Entered with a 16.67% margin, the calculator returns that price, $1,048.80, with its 20% markup on cost: $43.70 below the sample. The step-by-step method for writing the quote itself, from scope to validity terms, is in how to quote a job, and the estimate template lists the fields the price goes into.
Trade calculators built on the same method
The same cost-plus steps sit under each of FieldRanger's pricing calculators. Several trade versions derive the labor hours from a measurement the trade already takes. The free house cleaning estimate calculator app derives hours from floor area, bathrooms and a condition factor. The free electrical work estimate calculator adds permit and inspection fees after the margin, at cost. A painter's version of the hours, from wall area and coats, is in how to price a painting job.
Estimates from the calculator in FieldRanger and HubSpot
FieldRanger holds the estimate the price goes on; the arithmetic stays in the calculator. That is the point where the calculator meets estimating software. An estimate can be built from the HubSpot deal or contact record without leaving HubSpot, or built in FieldRanger and kept tied to the HubSpot deal it belongs to. A won HubSpot deal becomes a job with its context carried over, time is logged against each job, and revenue reports show job revenue and margin by customer or service type. The logged hours are the check on the calculator's 8: a job logged at more hours than it was priced for sets the hours on the next estimate.
Frequently asked questions
How to calculate a job estimate?
Multiply the labor hours by the loaded labor cost, add materials and other direct costs, and add overhead as a percentage of that total. Divide by one minus the target margin. The sample job, 8 hours at $45 with $350 of materials and $50 of other costs, prices at $1,092.50.
What should be included in a job estimate price?
Labor at a loaded rate, materials at cost, costs that exist only because of the job, a share of overhead and the profit. Sales tax is added separately.
What is the difference between margin and markup on an estimate?
Margin is profit as a share of the price; markup is profit as a share of cost. The sample's $218.50 is a 20% margin and a 25% markup.
How do employer payroll taxes affect the labor rate?
They are part of the loaded labor cost. The employer pays 6.2% Social Security tax up to the 2026 wage base and 1.45% Medicare tax, plus unemployment tax and insurance, on top of the wage.
Eight hours at a loaded $45 with materials at cost come to $1,092.50, one figure for the customer with all six inputs kept behind it. The trade versions are listed on the free field service templates hub. To see the estimate side in HubSpot, book a demo, or Start free trial for 14 days with no card.
FieldRanger runs field service inside HubSpot
Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.
Book a demo