Free HVAC Estimate Template:Every Field and a Filled Air Conditioner Replacement Example
HVAC estimate template with equipment, labor, permit, refrigerant and SEER2 efficiency fields, filled for an air conditioner replacement in Albuquerque.
An HVAC estimate template is the priced offer for new heating or cooling equipment: the load and the system selected, each piece of equipment by model, labor, the permit, the refrigerant, the efficiency rating against the federal minimum, the price and the terms. The example fills every field for an air conditioner replacement in Albuquerque, New Mexico.
The field list is one of the free field service templates from FieldRanger, the HVAC software that runs inside HubSpot. How an HVAC office prices and sells replacements, from tiered proposals to the deal record, is the subject of the HVAC estimating page.
Fields of an HVAC estimate: equipment, labor, permit, refrigerant and efficiency
The table holds the template's fields, and the page offers them as a free .xlsx download with no sign-up. Each row becomes a line in a Word or Google Docs copy, or a row in a spreadsheet that totals itself.
| Field | What goes in it |
|---|---|
| Contractor | Business name, address, telephone and contractor license number |
| Estimate number, date and expiry | A unique number, the issue date and the date equipment prices lapse |
| Customer and site | Name, address and where each unit sits: yard, roof, attic, closet or garage |
| Existing equipment | Make, model, age, refrigerant and condition of each unit replaced or kept |
| Load calculation | Method, cooling and heating loads in Btu/h, and the capacity selected |
| Outdoor unit | Make, model, capacity and refrigerant |
| Indoor coil or air handler | Make and model, matched to the outdoor unit |
| Efficiency rating | SEER2, EER2 and HSPF2 of the certified combination, its reference number, and the federal minimum for the region |
| Refrigerant | New refrigerant and charge, added charge for line length, and recovery of the old charge |
| Installation materials | Line set, pad, disconnect, drain pan and float switch, thermostat: one line each |
| Labor | Crew size, hours and rate, or a set price per task; removal and haul-away |
| Startup and commissioning | The tests run before the crew leaves: charge, airflow, temperature split |
| Permit | Jurisdiction, permit type, fee billed at cost, and who schedules the inspection |
| Options | Alternative systems, priced outside the total |
| Subtotal and tax | The sum of the lines, and how the state's tax is added |
| Warranty | Manufacturer's parts warranty and its registration condition; labor warranty |
| Payment terms | Deposit, balance due date and payment methods |
| Acceptance | Customer's signature, date and the option chosen |
Filled HVAC estimate: 3-ton air conditioner replacement in Albuquerque, New Mexico
A 2009 air conditioner failed with a dead compressor on a no-cool call. The gas furnace, installed in 2017, stays; the condenser, coil and line set are replaced. The business, customers, model numbers and prices are illustrative.
| Field | Example entry |
|---|---|
| Contractor | Example Heating and Air LLC, 400 Example Boulevard NE, Albuquerque, NM 87110 · 505-555-0126 · license 000000 (example) |
| Estimate number, date and expiry | HV-2026-0274 · November 12, 2026 · valid until December 12, 2026 |
| Customer and site | Daniel and Rosa Chavez, 815 Example Drive NE, Albuquerque, NM 87112 · condenser on a ground pad in the side yard; furnace and coil in the garage |
| Existing equipment | Split air conditioner, 3 ton, installed 2009, R-22, compressor failed (work order WO-2026-1932) · gas furnace, installed 2017, kept |
| Load calculation | ACCA Manual J: cooling load 33,400 Btu/h; 3 ton (36,000 Btu/h nominal) selected |
| Outdoor unit | Split air conditioner EX-AC36 (example), 3 ton, R-454B |
| Indoor coil or air handler | Cased evaporator coil EX-C36 (example) with TXV, matched to EX-AC36 |
| Efficiency rating | Certified combination 15.0 SEER2 and 12.0 EER2, reference 000000000 (example) · Southwest minimum below 45,000 Btu/h: 14.3 SEER2 and 11.7 EER2 |
| Refrigerant | R-454B, factory charged for 15 ft of line, plus 0.9 lb for the 30 ft run · existing R-22 recovered by a Type II certified technician |
| Permit | City of Albuquerque plumbing/mechanical permit for a cooling system installation, fee at cost; inspection scheduled by the contractor as permit owner |
| Subtotal and tax | New Mexico gross receipts tax added as a separate line at the job site's rate on the invoice date |
| Warranty | Manufacturer's parts warranty on registration within the manufacturer's deadline · labor one year |
| Payment terms | $2,500 at acceptance to order equipment; balance on completion · card, check or bank transfer |
| Acceptance | Customers' signatures, date and the option chosen |
| Line | Quantity | Unit price | Line total |
|---|---|---|---|
| Outdoor unit EX-AC36, 3 ton, R-454B | 1 | $3,950.00 | $3,950.00 |
| Cased evaporator coil EX-C36 with TXV | 1 | $1,280.00 | $1,280.00 |
| Line set, 3/8 x 3/4 inch, insulated | 30 ft | $9.50 | $285.00 |
| Equipment pad, 60 A non-fused disconnect and whip | 1 lot | $210.00 | $210.00 |
| Secondary drain pan and float switch | 1 | $145.00 | $145.00 |
| Programmable thermostat | 1 | $185.00 | $185.00 |
| Recover R-22 charge; remove and haul away condenser and coil | 1 lot | $350.00 | $350.00 |
| Installation labor, two technicians | 16 h | $135.00 | $2,160.00 |
| Additional R-454B for line length | 0.9 lb | $48.00 | $43.20 |
| Startup and commissioning: subcooling, temperature split, static pressure | 1 | $225.00 | $225.00 |
| Mechanical permit, at cost | 1 | $160.00 | $160.00 |
| Subtotal before gross receipts tax | $8,993.20 | ||
| Option, outside the subtotal: 3-ton heat pump and matched coil in place of EX-AC36, 16.0 SEER2 and 8.1 HSPF2 | 1 | add $2,450.00 |
The coil is replaced for two reasons: the 2009 coil was built for R-22, and the new outdoor unit is rated only as a certified combination with a matched coil. Keeping the old coil would leave the efficiency row with no rating to enter.
Efficiency, refrigerant and permit rows in the example
Four rows of the Albuquerque estimate rest on rules outside the contractor's choice.
| Cooling capacity | North | Southeast | Southwest |
|---|---|---|---|
| Below 45,000 Btu/h | 13.4 SEER2 | 14.3 SEER2 | 14.3 SEER2; 11.7 EER2, or 9.8 EER2 at 15.2 SEER2 and above |
| 45,000 Btu/h and above | 13.4 SEER2 | 13.8 SEER2 | 13.8 SEER2; 11.2 EER2, or 9.8 EER2 at 15.2 SEER2 and above |
The figures come from the Department of Energy's guidance on the 2023 standards, which also sets split-system heat pumps at 14.3 SEER2 and 7.5 HSPF2 nationwide (U.S. Department of Energy, 2023 central air conditioner standards FAQ, issued October 5, 2022). The Southwest region is Arizona, California, Nevada and New Mexico. In the southern regions the standard follows the installation date, and installation means connecting the refrigerant lines or electrical systems to make the unit operational. The Albuquerque combination, at 15.0 SEER2 and 12.0 EER2, clears both southwestern minimums for its size. The heat pump option faces only the national heat pump standard, and its 16.0 SEER2 and 8.1 HSPF2 clear it.
The refrigerant row follows the EPA's Technology Transitions rule. New residential and light commercial air conditioning systems carry a global warming potential limit of 700, with an installation compliance date of January 1, 2025, and no installation deadline for systems whose specified components were all made or imported before that date (EPA, Technology Transitions restrictions by sector, updated August 28, 2026). R-454B is entered by name so the customer and the inspector read the same refrigerant. The old R-22 charge is recovered rather than vented: EPA rules prohibit intentional venting of refrigerants during service or disposal (EPA, Prohibition on Venting Refrigerants, updated December 8, 2025).
The permit row names the city's own category. Albuquerque lists "Heating or cooling system installation" among the work needing a plumbing/mechanical permit, and states that "The permit owner may schedule inspections online or by calling 505-924-3320" (City of Albuquerque, Inspections, checked November 2026). The fee line is illustrative; the city's fee schedule sets the actual amount.
The tax row adds gross receipts tax at the invoice rather than at the estimate. New Mexico imposes the tax on the business, and a business that passes it to the buyer must state it separately on the invoice; the total rate combines state, county and municipal rates for each location, and since July 1, 2025 rates change only in July, outside special cases (New Mexico Taxation and Revenue Department, Gross Receipts Tax Overview, checked November 2026).
HVAC quote template and HVAC estimate template
An HVAC quote template prices a diagnosed repair at one figure: the fault found, the part, the price and the approval, signed at the door. It has no load calculation, efficiency row or permit, because nothing new is being sized or installed. An HVAC estimate template prices a system: the load, the equipment, the combination's rating, the refrigerant, the permit and the options. The Albuquerque job produced both. The no-cool call ended with a quote for a compressor replacement that the Chavezes declined, and the estimate above replaced the system instead.
HVAC estimate and quote formats: PDF, Word and spreadsheets
An HVAC estimate template PDF and an HVAC quote template PDF are the same fields with the layout fixed, so the customer signs the page that was sent. A spreadsheet copy computes the line totals and the subtotal; a Word or Google Docs copy carries the same rows with the arithmetic done by hand. Each format works from the field table above.
HVAC estimate instructions in order of the site visit
- Record the existing equipment from its data plates, with photographs, and note what stays.
- Run the load calculation and select the capacity from it rather than from the old unit's size.
- Choose the outdoor unit and the matched indoor coil or air handler, and enter the certified combination's ratings and reference number.
- Compare the ratings with the federal minimum for the region; in the Southeast and Southwest, use the minimum in force on the installation date.
- Enter the refrigerant, the added charge for the line length, and the recovery of the old charge.
- Price materials, labor, startup and the permit as separate lines, and price options outside the subtotal.
- State how tax is added, the warranty and its registration condition, the deposit and the expiry date.
- Before sending, confirm that every rating on the page belongs to the combination quoted and that the lines add to the subtotal.
Estimating software and the signed HVAC estimate
On paper, the signed Chavez estimate is copied three times: the equipment into a distributor order, the install into the calendar, and the totals into an invoice.
In FieldRanger, an estimate is built from the HubSpot deal or contact record without leaving HubSpot, or in FieldRanger, tied to the HubSpot deal it belongs to. It goes out for signature through PandaDoc. The won deal becomes the install job with its context carried over, the dispatcher drags it onto a technician's calendar, and the deal record shows its status. Clocked time is logged against the job, and the invoice is generated from the completed work order; the HVAC invoice template lists what that bill carries. Recurring job templates then hold the maintenance visits once the customer signs an agreement drawn from the HVAC service agreement template. The estimating software page describes the estimate in detail.
FieldRanger does not calculate loads or look up certified ratings, and its price book of services, parts and rates is the contractor's own list rather than a manufacturer's. Those entries come from design software, the manufacturer and the distributor before the estimate is written.
Fill it in here, or download the spreadsheet
The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.
Frequently asked questions
What should an HVAC estimate include?
The contractor's license number, the customer and site, the existing equipment, the load calculation, the outdoor unit and matched coil by model, the certified efficiency rating against the regional minimum, the refrigerant, materials, labor, startup tests, the permit, options, tax, warranty, payment terms and acceptance.
What is the difference between an HVAC quote and an HVAC estimate?
A quote prices a diagnosed repair at one figure for approval on site. An estimate prices a system: the load, the equipment, the rated combination, the refrigerant, the permit and any options.
Is there an HVAC estimate template PDF?
The page offers a free .xlsx download with no sign-up: a Template sheet with every field and the line items, and a Sample sheet with the filled example. Excel or Google Sheets saves it as a PDF, which fixes the layout for signature.
What SEER2 rating does a new air conditioner need in the Southwest?
Under the Department of Energy standards in force since January 1, 2023, a split-system air conditioner below 45,000 Btu/h installed in Arizona, California, Nevada or New Mexico needs 14.3 SEER2 and 11.7 EER2, or 9.8 EER2 at 15.2 SEER2 and above.
Does an air conditioner replacement need a permit in Albuquerque?
The City of Albuquerque lists heating or cooling system installation among the work requiring a plumbing/mechanical permit, and the permit owner schedules the inspections.
The Chavez changeout after signature
Once the Chavezes sign HV-2026-0274, the $2,500 deposit orders EX-AC36 and its coil, the permit application names the same combination, and the inspector checks the installed model numbers against it. The startup readings recorded on the install become the baseline for the first maintenance visit, and the invoice and agreement that follow come from the same free field service templates. FieldRanger's price per technician is on pricing, and its free trial covers 14 days with no card required.