Template

Free Renovation Estimate Template:Every Field and a Filled Kitchen Remodel Example by Trade

Renovation estimate template priced by trade section, with allowances, exclusions and Maryland contract rules, filled for a kitchen remodel in Columbia, MD.

Updated 9 min read

Download .xlsxExcel spreadsheet · 14 KB · Free, no sign-upFill it in online

A renovation estimate template prices the remodel of an existing room trade by trade: site protection and demolition, the rough trades, finish labor, allowances for what the owner has not yet chosen, exclusions, prices for conditions hidden behind walls, the contract price and a payment schedule. A remodel differs from new work in one respect: the existing house is part of the scope.

The field list is free and ungated, filed with the free field service templates of FieldRanger, the general contractor software that runs inside HubSpot. The example fills it for a kitchen in Columbia, Maryland, where the home improvement law decides what the signed estimate must say.

Renovation estimate template fields

The table lists the template's fields, and the page offers them as a free .xlsx download with no sign-up. Each row becomes a box or a numbered clause in the copy the owner signs.

Renovation estimate template fields and what goes in each
FieldWhat goes in it
ContractorBusiness name, address, telephone and state license number
SalespersonName and license number of the person who sold the job, where the state licenses salespeople
Estimate number, date and expiryA unique number, the date and the date the price lapses
Owner and propertyEach owner who signs, the address, and the year the house was built
Existing conditionsWhat the site visit found: framing, plumbing and wiring routes, flooring layers, paint age
Scope by trade sectionEach trade's work in the order crews arrive, with quantity, unit, unit price and line total
MaterialsSpecified products, or the allowance that stands in for them
AllowancesEach unchosen item, its amount, and how differences are settled
Hidden-condition pricesUnit prices for work that cannot be seen until demolition
ExclusionsWork outside the price, named
PermitsPermits the contractor obtains and how fees are billed
Lead-safe workYear built, lead test result or plan, and the firm's certification, for pre-1978 houses
Contract price and taxThe total, and the rule behind the tax entry
ScheduleApproximate start and substantial completion dates
Deposit and paymentsDeposit within any state limit, then payments tied to finished work
Change ordersHow a change is written, priced and signed before the work
Required noticesThe licensing board's notice, rescission rights and any state-set consumer notice
AcceptanceSignatures and dates

The contractor estimate template covers additions and basements. The renovation version adds existing-conditions and hidden-condition rows, since demolition tests its price.

Filled renovation estimate: kitchen remodel in Columbia, Maryland

The kitchen is 168 square feet in a house built in 1974. The sink moves 30 inches, a soffit comes out, and the owners choose cabinets, slab, tile and fixtures after signing. The company, owners and prices are illustrative; the legal terms follow the sources cited below.

Filled renovation estimate, header and terms (example business, illustrative entries)
FieldExample entry
ContractorExample Remodeling LLC, 40 Example Street, Ellicott City, MD 21043 · 410-555-0129 · MHIC license 00000 (example)
SalespersonChris Romero, MHIC salesperson license 00000 (example)
Estimate number, date and expiryRE-2026-0219 · November 12, 2026 · valid until December 12, 2026
Owner and propertyDaniel and Mei Okafor, 22 Example Court, Columbia, MD 21044 · built 1974
Existing conditionsSoffit above wall cabinets holds no duct or pipe; two vinyl layers over plywood; original painted trim
PermitsBuilding, plumbing and electrical permits obtained by the contractor and subcontractors, billed at cost
Lead-safe workHouse built before 1978: test by a certified renovator; containment and cleaning verification if positive; EPA firm certification on file; pamphlet given at signing
ScheduleStart about January 18, 2027 · substantial completion about March 12, 2027
Change ordersWritten, priced and signed by both parties before the changed work; allowance differences settled the same way
Required noticesMHIC notice with telephone numbers 410-230-6231 and 1-888-218-5925 and website; Commission consumer-protection and performance-bond notice; three-day cancellation notice when signed at the home
Filled renovation estimate, scope by trade section (illustrative prices)
Trade and taskQuantityUnitUnit priceLine total
General conditions: dust walls, floor protection, dumpster, daily cleanup5week$560.00$2,800.00
Lead test and lead-safe containment, certified renovator1lot$780.00$780.00
Demolition and haul-off: cabinets, counters, soffit, flooring1lot$1,850.00$1,850.00
Carpentry: soffit removal, blocking, subfloor fastening1lot$1,240.00$1,240.00
Plumbing, subcontractor quote: sink moved 30 inches, dishwasher, ice maker line1lot$3,450.00$3,450.00
Electrical, subcontractor quote: two 20 A appliance circuits, range circuit, 6 recessed lights, under-cabinet lighting1lot$5,980.00$5,980.00
HVAC: supply register moved to toe-kick1each$420.00$420.00
Drywall: patch and skim walls and ceiling1lot$1,650.00$1,650.00
Cabinet installation, labor26linear ft$95.00$2,470.00
Countertop fabrication and installation, labor58sq ft$38.00$2,204.00
Tile backsplash installation, labor34sq ft$22.00$748.00
Flooring installation, labor168sq ft$4.25$714.00
Paint: walls, ceiling and trim1lot$1,150.00$1,150.00
Appliance installation, owner-supplied5each$95.00$475.00
Final cleaning1lot$350.00$350.00
Trade subtotal$26,281.00

Allowances, exclusions and hidden-condition prices

An allowance is a placeholder amount for a product the owner has not chosen. A selection over it becomes a priced change order; one under it becomes a credit.

Filled renovation estimate, allowances, contract price and payments (illustrative)
LineBasisAmount
Trade subtotalScope above$26,281.00
Allowance: cabinets26 linear ft, owners' choice, delivered$14,500.00
Allowance: countertop slabOwners' choice of quartz, delivered to the fabricator$3,100.00
Allowance: backsplash tile34 sq ft plus waste$680.00
Allowance: sink, faucet and disposalOwners' choice$1,150.00
Allowance: two pendant lightsOwners' choice$600.00
Allowance: luxury vinyl plank168 sq ft plus waste$880.00
Permits, at costEstimated$640.00
Contract priceNo sales tax line$47,831.00
DepositAt signing$9,000.00
Payment 2Demolition finished; rough plumbing and electrical inspected$12,000.00
Payment 3Cabinets set; countertops templated$14,000.00
Payment 4Countertops, backsplash and flooring installed$8,000.00
Final paymentFinal inspections passed; punch list closed$4,831.00

Hidden conditions are priced before they are found. Rotted subfloor under the sink is replaced at $14.00 a square foot, and a drain line found to be galvanized steel is replaced at $48.00 a linear foot, each on a signed change order with the measured quantity. Exclusions name what the price does not buy: appliances, structural changes, window replacement, testing or removal of asbestos-containing flooring, and work outside the kitchen.

Home remodeling cost estimate template: cost by trade section

A home remodeling cost estimate template groups the same lines into sections for an owner comparing bids.

Kitchen remodel cost by trade section (illustrative)
SectionAmountShare of contract price
Site, protection and demolition$5,430.0011.4%
Rough trades: carpentry, plumbing, electrical, HVAC$11,090.0023.2%
Finish labor$9,761.0020.4%
Allowances$20,910.0043.7%
Permits$640.001.3%
Contract price$47,831.00100.0%

Allowances are 43.7 percent of this price, so the owners' selections move the final cost more than any trade. Two bids with different allowance amounts are not comparable until the allowances match.

Maryland home improvement contract rules behind the example

Maryland's Business Regulation Article, section 8-501, requires a home improvement contract in writing, legible and signed by each party. It must state the contractor's name, address, telephone and license number, and the name and license number of each salesperson who solicited the contract. It must also give "the approximate dates when the performance of the home improvement will begin and when it will be substantially completed", a description of the work and materials, and the agreed price (Md. Code, Bus. Reg. § 8-501, checked November 2026). It carries the Commission's telephone number and website, a licensing notice, and a Commission-set notice of consumer protections and the right to buy a performance bond. The owner receives a signed copy before work begins.

Section 8-617(b) caps the deposit: a person "may not receive a deposit of more than one-third of the home improvement contract price" before or at signing (Md. Code, Bus. Reg. § 8-617, checked November 2026). One-third of $47,831.00 is $15,943.67, so the $9,000.00 deposit fits. The Maryland Home Improvement Commission lists 410-230-6231 and 1-888-218-5925, and its Guaranty Fund pays homeowners up to $30,000 for losses on work by licensed contractors (Maryland Department of Labor, MHIC, checked November 2026).

The estimate has no tax line because Maryland taxes the contractor, not the owner, on materials. COMAR 03.06.01.19(A) states that a person who "constructs, improves, alters, or repairs real property shall pay the tax on all materials purchased" (COMAR 03.06.01.19, checked November 2026).

Two federal rules apply as well. The house predates 1978, and EPA's renovation rule covers work that disturbs paint in homes built before then (EPA, Lead Renovation, Repair and Painting Program Rules, updated December 15, 2025). The firm gives the owner the lead pamphlet no more than 60 days before work begins, with a written acknowledgment or a certificate of mailing (40 CFR 745.84, Cornell LII, checked November 2026). Where the contract is signed at the home, the FTC's Cooling-Off Rule covers sales of $25 or more and lets the buyer cancel until midnight of the third business day (FTC, Buyer's Remorse: The FTC's Cooling-Off Rule, September 2025). This page is not legal advice.

Renovation estimate instructions from site visit to signed contract

  1. Record the year built, then open what can be opened: soffits, the sink base, floor layers at a register.
  2. Photograph existing conditions, and note the lead-paint status for a pre-1978 house.
  3. Write the scope by trade section in the order crews arrive, pricing subcontracted trades from dated quotes.
  4. Set an allowance for each unchosen product, with what the amount buys.
  5. Price each hidden condition per unit, and list the exclusions.
  6. Total the contract price and apply the state's tax rule.
  7. Set the deposit under the state's cap and tie each later payment to finished, inspected work.
  8. Add the license numbers, dates, notices and change-order terms the state requires.
  9. Check that the trade lines and allowances add to the contract price, the payments add to the same figure, and the deposit is under one-third.

Estimating software and the renovation estimate

A spreadsheet estimate stops at the signature. Its allowances, change orders and payments move into separate files, apart from the crew's hours.

In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or in FieldRanger, where it stays tied to the deal, and it goes out for signature through PandaDoc. The won deal becomes a job with its context carried over, and the deal record shows the job's status. Technicians clock in and out with time logged against each job, before and after photos attach to the work order, and the invoice is generated from the completed work order. A deposit invoice can go out before the job, with the balance invoiced on completion. The estimating software page covers the estimate itself; the construction estimate template prices new construction, and the construction invoice template bills progress payments against a schedule of values.

Fill it in here, or download the spreadsheet

The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.

Frequently asked questions

What should a renovation estimate include?

The contractor's license number, the existing conditions found, the scope by trade section, allowances, hidden-condition prices, exclusions, permits, lead-safe work for pre-1978 houses, the contract price, the schedule, the deposit and payments, change-order terms, required notices and signatures.

What is a home remodeling cost estimate template?

A renovation estimate grouped into sections, such as demolition, rough trades, finish labor, allowances and permits, with each section's amount and share of the price.

How much deposit can a contractor take in Maryland?

No more than one-third of the home improvement contract price before or at signing, under section 8-617(b) of the Business Regulation Article.

What is an allowance on a remodeling estimate?

An amount set aside for a product the owner chooses later, such as cabinets or tile. A selection above the amount becomes a change order; one below it becomes a credit.

Is there a free renovation estimate template?

Yes. The page offers a free .xlsx download with no sign-up: a Template sheet with every field and the scope lines, and a Sample sheet with the filled Columbia kitchen estimate.

The Okafor kitchen from deposit to final payment

After signing, the $9,000.00 deposit and the cabinet selection come first, because the $14,500.00 cabinet allowance is the largest open number in the price. The remaining payments follow inspections, and each one goes out on a bill drawn from the free field service templates. Pricing for FieldRanger runs per technician (pricing); a Start free trial covers 14 days and takes no card.

FieldRanger runs field service inside HubSpot

Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.

Book a demo