A concrete leveling business raises settled slabs back to grade by injecting material beneath them: expanding polyurethane foam through small drilled holes, or a cement-based slurry by mudjacking. A trailer-mounted foam rig was listed from $39,495 on November 13, 2026, and homeowner price guides put foam lifting at $5 to $25 a square foot.
Leveling jobs go wrong on the price more than on the lift. A 25-square-foot sidewalk section is quoted by the square foot and comes to $225, less than the cost of bringing the rig. Foam is budgeted by the drum without knowing how many pounds a slab takes, so the margin on a driveway is a guess. A rig is bought on a loan sized for a full season, and the business discovers in the first slow month that each job carries a share of that payment. This guide is published with FieldRanger's concrete contractor software page. It compares foam and mudjacking, prices a starter rig and its foam, works one driveway lift in Wichita, Kansas with its costs, sets out the insurance lines, and closes with a business plan, a checklist and the software record.
Four terms carry the page. Slab lifting, also called concrete leveling or slabjacking, raises an existing slab rather than replacing it. Polyjacking injects a two-component polyurethane that expands and cures under the slab. Mudjacking pumps a cementitious slurry under the slab. Density, for lifting foam, is the weight of a cubic foot of cured foam, written as pcf (pounds per cubic foot) or "2.5 lb foam".
Polyurethane foam and mudjacking compared
The two methods sell the same result to the same customer and differ in what goes under the slab. ArmorThane describes its ArmorFoam Lift 200 as "a two-component, closed cell, water blown, rigid, slab-jacking foam designed to raise and stabilize concrete or asphalt in residential uses", a "hydrophobic 2.50 pcf polyurethane polymer" injected "through small drilled holes into the subgrade", which "can be injected into cold, damp or wet environments" and is installed "without 28 day concrete cure" (ArmorThane, ArmorFoam Lift 200, checked November 13, 2026). ThePricer, a cost guide, puts polyjacking at "about $5 to $25 per square foot in 2026", citing Angi's July 2026 data, and mudjacking at "roughly $3 to $6 per square foot", using "a heavier cementitious slurry instead of lightweight expanding foam" (ThePricer, polyurethane foam injection cost, checked November 13, 2026).
| Dimension | Polyurethane foam | Mudjacking |
|---|---|---|
| Material | Two-component polyurethane, 2.5 pcf in ArmorThane's Lift 200 | Cement-based slurry |
| Weight added under the slab | Light: the foam's own density | Heavier slurry, per ThePricer |
| Wet sites | Hydrophobic grades are injected into wet ground | The slurry is water-based |
| Published homeowner price | $5 to $25 per square foot | $3 to $6 per square foot |
| Equipment priced on this page | Starter rig from $39,495 | Not priced: no seller page with a listed price was readable on November 13, 2026 |
| Material priced on this page | $2,295 per 2.8 lb kit | Not priced |
The table leaves one decision to the owner's market. Foam carries a higher price per square foot and costs more to equip; mudjacking undercuts it on price and adds weight to the soil the slab already settled into. A new business that expects wet clay, pool decks and interior floors buys the foam rig; one selling mainly sidewalks and driveways against replacement on price can start with the slurry.
Foam rig and equipment from a seller's page
The rig is the start-up cost. SprayEZ lists its SprayEZ 3000 concrete lifting rig "Starting at $39,495", describing it as a 7 x 16 standard V-nose trailer with a Generac GP18000EFI generator, two divorced series 2:1 ratio pumps, the SprayEZ 3000 spray machine and transfer lines; the machine "delivers 30/lb per minute and can support 250′ of heated hose" (SprayEZ, SprayEZ 3000 concrete lifting rig, checked November 13, 2026). The page states: "All you need to do is add safety equipment, foam and accessories", and that prices "do not include sales tax or delivery fees." The same listing shows a PMC PH2 hydraulic concrete lifting rig starting at $53,995 (SprayEZ, concrete lifting rig packages).
A loaded 7 x 16 trailer needs a tow vehicle rated for it. Chevrolet lists the Silverado HD "From: $46,200" in its truck line-up (Chevrolet, trucks, checked November 13, 2026); an owner who already has a three-quarter-ton truck rated for the trailer's weight leaves that line out. Drills, injection ports, hole patching material and protective equipment are left as quoted lines: the rig page names them as additions without prices.
Lifting foam: price, density and the pounds a slab takes
Foam is bought in kits of two components. SprayEZ's store lists "KIT - FOAM - CLOSED CELL 2.8LB CONCRETE LIFTING" at $2,295.00, a "low viscosity, high-density 2.8LB closed cell polyurethane foam lifting material" formulated "for optimal performance in concrete slab lifting, slab stabilization and undersealing" (SprayEZ store, 2.8 lb concrete lifting foam kit, checked November 13, 2026). The listing does not state the kit's weight, and that number decides the cost per pound; it is the first question for the supplier.
The pounds a job takes follow from the void and the density. A void of 30 cubic feet filled with 2.5 pcf foam needs 75 pounds of foam at its nominal density. The sample below allows a factor of 1.5 above nominal density for foam lost into the soil and compressed under the slab. It is a sample input, and the supplier's yield figures and the first ten jobs' logs replace it.
Sample driveway lift in Wichita, priced
The sample is a hypothetical two-person foam lifting company in Wichita, Kansas, lifting two settled 10 x 12 foot driveway panels. The area, void depth, yield factor, kit weight, hours, fuel, patching and price per square foot are sample inputs; the kit price, rig price and wage are from the pages cited.
| Line | Basis | Amount |
|---|---|---|
| Area lifted | Two panels, 10 x 12 ft (sample) | 240 sq ft |
| Void volume | 240 sq ft × 1.5 in average void (sample) | 30 cu ft |
| Foam used | 30 cu ft × 2.5 pcf × 1.5 yield factor (sample) | 112.5 lb |
| Foam cost | 112.5 lb × $2.295, the $2,295 kit at a sample 1,000 lb per kit | $258.19 |
| Labor | 2 people × 4.5 hours (sample) × $23.45, the Wichita median for cement masons and concrete finishers | $211.05 |
| Employer Social Security and Medicare | 7.65% of labor | $16.15 |
| Fuel, hole patching | Sample | $65.00 |
| Rig share | $39,495 over 5 years and 150 jobs a year (sample) | $52.66 |
| Cost of the job | Sum of the costs above | $603.05 |
| Price | 240 sq ft × $9 per sq ft (sample, inside the $5 to $25 range) | $2,160.00 |
| Margin before the owner's pay and overhead | $2,160.00 less $603.05 | $1,556.95 |
The Wichita median of $23.45 an hour for cement masons and concrete finishers is from BLS 2025 wage data (O\*NET OnLine, Kansas wages for 47-2051.00, checked November 13, 2026). The employer's 6.2 percent Social Security and 1.45 percent Medicare are set by the IRS (IRS Topic 751).
The sample shows where the money is. Foam is 12.0 percent of the price; labor and the rig share together are 12.2 percent. The price is set by the square footage, so the job that loses money is the small one. At the same $9 a square foot, a 25-square-foot sidewalk section prices at $225, against fixed costs of driving the rig out, setting up and patching that do not shrink with the slab. ThePricer reports HomeGuide's finding that "many contractors charge a minimum of $300 to $700 or more", and works a $700 minimum on a 25-square-foot section to an effective $28 a square foot. A minimum charge belongs on the price sheet before the first sidewalk call.
Lift against replacement on the estimate
The customer weighing a lift is weighing a replacement, and the estimate states both. The replacement line is priced the way a new slab is priced, by cubic yards, forms, reinforcement and finish, as laid out in the concrete estimate template. At a sample replacement price of $14 a square foot, the two Wichita panels would cost $3,360 to replace against $2,160 to lift, and the lift avoids the 28-day concrete cure that ArmorThane sets it against.
Two conditions favor replacement and belong on the estimate as exclusions. A slab broken into pieces lifts as pieces, and a lift does not close cracks. Soil that is still moving, such as an undermined edge next to a downspout, can move again under the lifted slab unless the water source is fixed. Before and after photos of the settled slab, the measured drop at each corner and the crack pattern are the record that supports both lines.
Insurance for a slab lifting business
TechInsurance publishes average premiums for concrete contractors: general liability at $102 a month, or $1,218 a year, and commercial auto at $207 a month (TechInsurance, concrete contractor insurance cost, checked November 13, 2026). A leveling business adds two exposures to a flatwork company's. The rig is a $39,495 piece of equipment on a trailer, scheduled on an inland marine or equipment policy at its own value. And a lift that cracks a slab or lifts a neighbor's patio is a completed operations claim on the general liability policy. Additional insured endorsements, completed operations and equipment cover are set out in concrete business insurance.
Concrete leveling business plan: service line, rig financing and break-even
A concrete leveling business plan answers three questions in order: which method, how the rig is paid for, and how many jobs cover the fixed costs.
The fixed costs in the sample are the rig and the insurance. Straight-line over a sample five years, the rig is $7,899 a year; general liability and commercial auto at TechInsurance's averages are $3,708. Together they are $11,607 a year. Each sample driveway contributes $1,609.61 before the rig share, so the fixed costs are covered by the eighth job of the year, and the rig's full $39,495 is recovered in cash after 25 such jobs. The plan's real constraint is volume of the right size: 150 jobs a year is three a week over 50 weeks, and a season of 25-square-foot sidewalk calls at a $700 minimum is a different business from one of driveways and pool decks.
The marketing plan follows from the job size. Settled driveways, sidewalks and pool decks are visible from the street, so a before and after photo set from each job is the business's portfolio, and the yard sign and the concrete business cards left with a homeowner carry the same photos. The broader start of a concrete company, including licensing and silica rules, is in concrete business.
Starting a concrete leveling business: checklist
- Choose the method from the market: foam for wet sites, interior floors and pool decks; mudjacking where price against replacement decides the sale.
- Price the rig from a listed package and add what the listing excludes: sales tax, delivery, safety equipment, drills, ports and foam.
- Confirm the tow vehicle's rating against the loaded trailer before buying either.
- Ask the foam supplier for the kit's weight and published yield, and work the cost per pound.
- Set a minimum charge, and price by the square foot above it.
- Put the replacement price and the exclusions on every estimate, with photos of each panel.
- Schedule the rig on an equipment policy at its value, and confirm completed operations cover on the general liability policy.
- Log foam pounds and hours on every job for the first season.
- Verify after the first ten jobs: divide the pounds used by the square feet lifted, compare the result with the yield factor in the price sheet, and reprice if they differ.
Estimates, job photos and foam use in FieldRanger
FieldRanger keeps the lift-or-replace decision on the HubSpot record where the lead arrived. An estimate can be built from the HubSpot deal or contact record, or in FieldRanger and kept tied to the deal it belongs to, and estimates can be sent for signature through PandaDoc. A won deal becomes a job with its context carried over, and the drag-and-drop calendar moves a lift when rain soaks the subgrade.
Before and after photos attach to the work order, and the customer signs on site as proof of completion. Materials tracking logs parts and materials used on each job for job costing, which is where the pounds of foam per job are recorded for step 9 of the checklist, and the technician logs time against each job when clocking in and out. Asset tracking and equipment maintenance hold the rig's service schedule. The invoice is generated from the completed work order, payment can be taken in the field through Stripe, and revenue reports show job revenue and margin by service type, lifting against replacement. Lifting is two-person work as a trade practice, and one job can carry both technicians. Plans are on pricing, and Start free trial runs 14 days with no card.
Frequently asked questions
What does it cost to start a concrete leveling business?
A foam lifting rig was listed from $39,495 on November 13, 2026, before sales tax, delivery, foam, safety equipment and tools. A 2.8 lb lifting foam kit was listed at $2,295, and a tow vehicle rated for the trailer is extra if the owner does not have one.
What is the difference between mudjacking and polyurethane foam lifting?
Mudjacking pumps a heavier cement-based slurry under the slab; polyjacking injects a two-component foam that expands and cures. ThePricer puts mudjacking at $3 to $6 a square foot and foam at $5 to $25.
How do concrete leveling companies price a job?
By the square foot above a minimum charge. ThePricer reports minimums of $300 to $700 or more, because a small section priced by area does not cover the cost of bringing the rig.
How much foam does it take to lift a slab?
The void volume times the foam's density, plus an allowance for confinement and loss into the soil. The sample's 30 cubic feet of void at 2.5 pcf and a 1.5 factor takes 112.5 pounds; a supplier's yield figures and job logs replace the factor.
Is a concrete leveling business profitable?
On the sample Wichita driveway, foam is 12.0 percent of a $2,160 price and the job clears $1,556.95 before the owner's pay and overhead. Small jobs without a minimum charge are where the margin is lost.
What goes in a concrete leveling business plan?
The method, the rig and how it is financed, the minimum charge and price per square foot, the fixed costs of the rig and insurance, and the number of jobs that cover them: eight sample driveways a year in this guide's plan.
The two Wichita panels take $258.19 of foam and sell for $2,160; the 25-square-foot sidewalk at the same rate sells for $225, and the minimum charge on the price sheet decides whether that call is worth the trip.