Template

Free Electrical Estimate Template:Labor Units, Materials, Permit and a Filled Service Upgrade Sample

Electrical estimate template with labor units, materials, permit and service upgrade lines, and a filled sample for a 200 A upgrade in Boulder, Colorado.

Updated 9 min read

Download .xlsxExcel spreadsheet · 13 KB · Free, no sign-upFill it in online

An electrical estimate template is the electrician's working sheet for pricing a job: each item counted, a labor unit in hours for each, materials by size and rating, the permit fee, utility coordination, and the code items the adopted edition of the National Electrical Code requires. Hours times the labor rate plus marked-up materials gives the price.

This field list is one of the free field service templates from FieldRanger, the electrical contractor software that runs inside HubSpot. The sample below prices a 200-amp service upgrade with three new circuits for a house converting to electric heat and cooking. The method behind the numbers is set out in the electrical estimate guide.

Electrical estimate template fields

The table lists each field and what goes in it, and the free .xlsx download carries the same rows, with no sign-up. The estimate is the internal sheet; the customer receives the price, the scope and the terms.

Electrical estimate template fields and what goes in each
FieldWhat goes in it
ContractorBusiness name, address, telephone and the license or registration number the state issues
Estimate number, date and price holdA unique number, the date, and how long material prices hold
Customer and siteOwner, address, year built and enclosed living area where the permit fee depends on it
Existing serviceAmperage, panel make and condition, meter location, overhead or underground drop, grounding found
Load basisThe load calculation result that supports the new service size
Line items by sectionService upgrade, new circuits, devices, permit and closeout, each line with a quantity and unit
Labor unitInstalled hours per unit for each line, from the company's own units or a published manual
Labor hoursQuantity times labor unit
Labor rateThe billing rate per hour applied to the hours
MaterialsCost per unit by size, rating and type, extended by quantity
Material markupThe percentage added to material cost
Code itemsSurge protection, emergency disconnect, and other items the adopted code requires at this service
PermitThe jurisdiction's fee basis and amount, billed at cost
Utility coordinationDisconnect and reconnect scheduling, and any utility charges at cost
ExclusionsWork outside the price, named
Price, deposit and paymentsTotal, deposit and the payment due at final inspection
AcceptanceCustomer signature and date

An electrical quote template is the customer's copy of the same job: section prices, scope, exclusions and terms, with the labor units and material costs left off.

Electrical estimate sample: 200 A service upgrade and three electrification circuits in Boulder, Colorado

The house is a 1962 ranch with 2,300 square feet of enclosed living area, an overhead 100-amp service and a full panel. The owners are adding a heat pump, an induction range and a heat pump water heater. The company, customer, labor units, rate and material costs are illustrative; the permit fee and code references are published.

Electrical estimate sample, header (example business, illustrative entries)
FieldExample entry
ContractorExample Electric LLC, 500 Example Road, Boulder, CO 80301 · 303-555-0188 · registration 0000000 (example)
Estimate number, date and price holdEE-2026-0733 · November 12, 2026 · material prices held until December 12, 2026
Customer and siteTaylor Nguyen, 1840 Example Avenue, Boulder, CO 80304 · built 1962 · 2,300 sq ft enclosed living area
Existing service100 A overhead service, mast on the north gable; 24-space panel full, 24 circuits; one ground rod found
Load basisLoad calculation EE-0733-LC dated November 10, 2026 supports a 200 A service with the three new loads
ExclusionsHeat pump, range and water heater equipment; drywall and stucco patching; trenching; tree work at the service drop; remediation of any aluminum branch wiring
Price, deposit and payments$8,088.00 · deposit $2,426.40 on acceptance · balance at passed final inspection
Electrical estimate sample, line items with labor units (labor at $120.00 an hour; materials at cost plus 25%; illustrative)
LineQuantityLabor unit (h)Labor hoursMaterial costLine price
A1 Remove 100 A panel, meter base and mast; make safe1 lot4.004.00$0.00$480.00
A2 200 A meter-main, outdoor, main breaker marked as emergency disconnect13.503.50$485.00$1,026.25
A3 Service mast, 2-inch rigid, weatherhead, entrance conductors, roof flashing13.003.00$260.00$685.00
A4 Feeder, 4/0 aluminum SER, meter-main to interior panel24 ft0.061.44$146.40$355.80
A5 Interior panelboard, 200 A, 42 spaces15.005.00$410.00$1,112.50
A6 Type 2 surge-protective device at the service10.500.50$145.00$241.25
A7 Grounding electrodes: two rods, electrode conductors, water and gas bonds1 lot3.003.00$120.00$510.00
A8 Existing branch circuits transferred, new breakers240.358.40$264.00$1,338.00
A9 Emergency disconnect marking and panel directory1 lot0.250.25$18.00$52.50
B1 Heat pump circuit, 240 V 40 A, EMT outdoors, disconnect14.504.50$240.00$840.00
B2 Induction range circuit, 240 V 50 A, 6/3 NM-B, receptacle13.503.50$185.00$651.25
B3 Heat pump water heater circuit, 240 V 30 A, 10/2 NM-B12.502.50$70.00$387.50
C1 Utility coordination: disconnect and reconnect1 lot1.501.50$0.00$180.00
C2 Inspection attendance11.001.00$0.00$120.00
C3 City of Boulder electrical permit, at cost1$107.95
Total42.09$2,343.40$8,088.00

The total breaks into three parts: 42.09 hours at $120.00 is $5,050.80, materials at cost plus 25 percent are $2,929.25, and the permit is $107.95. The deposit of $2,426.40 is 30 percent of the total, an illustrative company term.

Labor units and the hours behind the price

A labor unit is the installed hours for one unit of work under stated conditions. Line A4 shows the arithmetic: 24 feet of feeder at 0.06 hours a foot is 1.44 hours. Line A8 shows why units matter on service work: 24 circuits at 0.35 hours each is 8.40 hours, the largest single labor line, and it grows with every circuit found in the old panel.

The National Electrical Contractors Association publishes a Manual of Labor Units that estimators start from. The sample uses the company's own units, which come from its crews' logged hours on earlier upgrades. A crawlspace, a finished basement or a panel buried in cabinetry raises the unit for that line, and the estimate notes the condition beside it.

Materials carry the other risk: copper and gear prices move, so the header states the date the material prices hold until.

Code, permit and utility lines in the Boulder estimate

Colorado's State Electrical Board adopted the 2023 National Electrical Code effective August 1, 2023 (Colorado DORA, State Electrical Board bulletin, July 28, 2023). Two lines in section A exist because of that edition.

Line A2 places the main breaker outdoors as the emergency disconnect. Larimer County's summary of 2023 changes describes section 230.85: one- and two-family dwellings need an emergency disconnecting means at a readily accessible outdoor location, marked "EMERGENCY DISCONNECT, SERVICE DISCONNECT" in white letters at least half an inch high on red, and "where service equipment is replaced, all of the requirements of this section shall apply" (Larimer County Building, 2023 NEC Significant Code Changes, June 2023). Line A9 is that marking.

Line A6 is the surge-protective device. Storey County's inspection guidelines, based on section 230.67 of the 2020 and 2023 editions, require a listed Type 1 or Type 2 device on services supplying dwelling units, integral to the service equipment or immediately adjacent to it (Storey County Community Development, 2023 NEC Surge Protection Guidelines, checked November 2026).

Line C3 comes from the city's fee schedule. Boulder prices a residential electrical permit by enclosed living area: $90.25 for a house of 2,000 square feet or more, plus $5.90 per 100 square feet above 2,000, and lists a "Service Change Only" permit at $36.70 (City of Boulder, 2026 Schedule of Fees, checked November 2026). At 2,300 square feet the area fee is $90.25 plus three increments of $5.90, or $107.95. The estimate carries the area fee because the permit also covers three new circuits; the city confirms the category at application.

The materials column is the contractor's tax-paid cost, so the estimate has no separate tax line. Colorado's consumer use tax guide states that construction materials are exempt from city and county sales tax when the buyer shows a building permit proving local use tax is paid or due, while state sales tax is still collected at the sale (Colorado Department of Revenue, Consumer Use Tax Guide, revised January 2026).

Electrical job estimate template for one-visit service calls

An electrical job estimate template for a one-visit call keeps the same columns and drops the sections. A ceiling fan on an existing box, two GFCI receptacles and a smoke alarm replacement are three lines with three labor units, a trip charge, materials and a total. The permit row stays on the sheet, and the estimator records whether the jurisdiction requires one for work that small.

After the work, the electrician invoice template bills the same lines with the inspection result. A customer who wants scheduled inspections of a commercial panel signs an electrical service agreement template instead of a new estimate each year.

Electrical estimate instructions from the panel photo to the signature

  1. Photograph the panel with its cover off, the meter, the mast and the grounding, and record the existing amperage and circuit count.
  2. Run the load calculation for the new loads and record its result and date.
  3. List items by section: service, new circuits, devices, permit and closeout.
  4. Apply a labor unit to each line, adjusted for access, and extend the hours.
  5. Price materials by size and rating from a current supplier quote, apply the markup, and state the price hold date.
  6. Add the code items the adopted edition requires at this service, and the permit fee from the jurisdiction's schedule.
  7. Name the exclusions, set the deposit and payment terms, and copy the customer-facing lines to the quote.
  8. Check that the line hours add to the total hours and that hours times rate, plus marked-up materials, plus the permit, equals the price.

Estimating software and the electrical estimate

A spreadsheet holds the labor units and does the arithmetic. After acceptance, its 42.09 estimated hours sit in a file that never sees the hours the crew works.

In FieldRanger, the estimate is built from the HubSpot deal or contact record without leaving HubSpot, or in FieldRanger, where it stays tied to the deal; it can go out for signature through PandaDoc. The won deal becomes a job with its context carried over, technicians clock in and out with time logged against each job, and revenue reports show job revenue and margin by service type. The invoice is generated from the completed work order. The estimating software page covers the estimate itself.

The estimator's services, parts and rates sit in FieldRanger's price book, and the estimate writes the HubSpot deal's line items and amount. The load calculation stays with the estimator, as in the tables above. FieldRanger then adds the comparison afterwards: logged hours against the units that priced the job.

Fill it in here, or download the spreadsheet

The form below is the same template: totals calculate as you type, with the spreadsheet's own formulas, and your entries stay in this browser. Download it filled in, print it or save it as a PDF, or take the blank file.

Frequently asked questions

What is an electrical estimate template?

A sheet for pricing electrical work: each item counted, a labor unit in hours for each, materials by size and rating, the permit, utility coordination and code items, with hours times the labor rate plus marked-up materials giving the price.

What should an electrical estimate sample include?

The contractor and license details, the existing service, the load basis, line items by section with labor units and material costs, the permit fee, exclusions, the total, the deposit and the payment terms.

How are labor units used in electrical estimating?

Each line's quantity is multiplied by its labor unit, the installed hours per unit, and the total hours are priced at the labor rate. Contractors start from a published manual such as NECA's or from their own logged hours.

Does a service upgrade need a surge protector?

Under section 230.67 of the 2020 and 2023 National Electrical Code, services supplying dwelling units need a Type 1 or Type 2 surge-protective device at or next to the service equipment, where that edition is adopted.

Is there a free electrical estimate template?

Yes. The page offers a free .xlsx download with no sign-up: a Template sheet with every field and the line-item columns, and a Sample sheet with the filled estimate.

The Nguyen service after acceptance

Once estimate EE-2026-0733 is signed, the permit application names the 200-amp meter-main, the surge device and three circuits, and the inspector reads the emergency disconnect label against it. The quote, work order and invoice that follow are among the free field service templates. FieldRanger's per-technician plans are on pricing; Start free trial gives 14 days, no card, enough to run one upgrade from deal to invoice.

FieldRanger runs field service inside HubSpot

Estimates, scheduling and dispatch, a technician app and invoicing on the HubSpot records sales already keeps. Every plan starts with a free trial.

Book a demo